Engineering Drawings
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
EROSION & SEDIMENT CONTROL MANAGEMENT PLAN 2 TURF STRIPS BEHIND KERB
& EVERY 5m, 2 STRIPS AT 45°
Comply with all statutory regulations and maintain the during earthworks Refer Best Practice Erosion and
Objective / Target construction. Comply with the Major Erosion and Sediment Control Plan Sediment Control Manual - Section
by ALTA PROJECTS to control erosion and sediment flows. 5 checklist SILT FENCE BY SEDIMENT FENCE LENGTH AS REQUIRED
MAX.
GEOFABRICS
700
BY GEOFABRICS
Site foreman to identify and check direction of stormwater flows as
shown on plan. Provide barriers and other measures shown on plan and Utilise B.P.& S.C. Manual N.S.L.
Management Strategy N.S.L.
within council guidelines to prevent stormwater flows over Inspection Form Section 7 WOVEN GEOTEXTILE
45°
200 MIN 0.6m
embankments and minimise sediments into gully pits. 200 MIN FILTER FABRIC
POSTS AT 3m CENTRES WITH WIRE 1 1 2%
SECTION
0.6m
MESH BACKING or 2m WITHOUT. ALL WATER FLOW 1 1
POSTS DRIVEN 600mm INTO GROUND.
Implement and maintain control measures identified on the Erosion and Utilise Section 7 - B.P.& S.C. 3.0m
Task / Actions 150mm ROCK SPALLS
Sediment Control Plans. Manual checklist
PERIMETER SILT FENCE ROCK FILTER DAM TURF STRIPS DETAIL
SCALE 1:50
SCALE 1:50 SCALE: 1:50
Site foreman to check for erosion and sediment flows at the base of
Utilise Section 7 - B.P.& S.C.
Performance Indicators embankments after rain. Check that all sediment fences and check
Manual checklist SEDIMENT FENCES SHALL BE CONSTRUCTED WITH RETURNS AT
dams are working correctly during rain events.
INTERVALS IN ACCORDANCE WITH "IECA BEST PRACTICE EROSION
CONTROL MANUAL" AND MAXIMUM 20m SPACINGS FOR FENCES
ALONG CONTOURS AND 10m FOR ON-GRADE.
Inspection of all control structures shall be undertaken prior to expected
rainfall events and at least twice weekly. All minor structures such as
Frequency / Deadline Refer drawing E04 for frequency
windrows, sediment fences etc, shall be inspected at the completion of
each day.
Construction Site
5m Cattle grid 3.0m NOM width
MIN "BIDIM A34" BY GEOFABRICS OR APROVED
NOM
Responsible Person / The implementation of the Major Erosion and Sediment Control Plan is set 300mm above ground EQUIVALENT. INSTALLED AS SHOWN
100
Refer Erosion and Sediment
Organisation the responsibility of the Principal Contractor. Control Plan Section 6.0
10 NOTE:
MIN m
Contractor to provide a wash
down facilty in conjunction
300
GRATED INLET
Geotextile fabric, PIT IN ROADWAY
Bidum U34 or similar with the proposed cattle grid.
Principal contractor to provide a monthly copy of record sheets
Reporting / Review identifying test results for water quality testing. Site workman to advise
Refer Erosion and Sediment 3 m IN
Control Plan Section 6.0 M To
foreman if they notice any barrier needing repair. Ex ELEVATION
ter
75 - 100mm nal
CRUSHED ROCK Ro PROVIDE TURF SURROUND TO ALLOTMENT
ad PITS WHERE DIRECTED BY SUPERINTENDENT.
PLAN
Corrective Actions
Should inspection reveal deficiencies, the Contractor shall report issues NCR form to be utilised refer CONSTRUCTION EXIT ALLOTMENT PIT PROTECTION DETAIL
to Supervising Engineer. Section 7 - B.P.& S.C. Manual SCALE 1:20
NOTE: A SAFE STORAGE LOCATION FOR FUELS AND OILS SHALL BE PROVIDED IN ACCORDANCE WITH AS1940 “THE STORAGE
AND HANDLING OF COMBUSTIBLE LIQUIDS”. THIS AREA SHALL BE BUNDED IN COMPLIANCE WITH THE STANDARD AND RELEVANT
REQUIREMENTS OF THE AUTHORITY
SEDIMENT CONTROL DEVICE CONSTRUCTION, MAINTENANCE AND REMOVAL IS TO
BE IN ACCORDANCE WITH:
"BEST PRACTICE EROSION AND SEDIMENT CONTROL MANUAL - 2008" AND
"BCC SEDIMENT BASIN DESIGN CONSTRUCTION AND MAINTENANCE GUIDELINES"
BEST PRACTICE EROSION AND SEDIMENT CONTROL BOOK 6 - STANDARD
DRAWINGS IS TO BE REFERRED TO DURING CONSTRUCTION.
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
SWT PROJECT: DRAWING TITLE:
ALTA PROJECTS
Drawn: SWT
A.B.N. 611355330 EROSION AND SEDIEMTN CONTROL DETAILS
FOR APPROVAL Date: DEC 2017 26 Memorial Avenue, Cotton Tree PROPOSED COMMERCIAL DEVELOPMENT
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
C 28/01/2021 ISSUE FOR APPROVAL S.T. S.R. Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 30-32 DOONELLA STREET, TEWANTIN QLD DRAWING No:
A6035/21/ES02 C 2 of 2
B 27/01/2021 ISSUE FOR APPROVAL S.T. S.R. STEPHEN ROBERTS
Email: [email protected]
A
1
21/01/2021
18/01/2021
ISSUE FOR APPROVAL
CO-ORDINATION ISSUE
S.T.
S.T.
S.R.
SR
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for DONNELLA STREET PTY LTD
REV DATE DESCRIPTION BY CHKD RPEQ - 7665 A1 SHEET SIZE FILENAME : A6035 - ES02 EROSION AND SEDIEMTN CONTROL DETAILS.dwg - DATE : 28/1/21 - 4:30pm - XREF's: H-Approved-SR; H-Checked-SR Council Ref: ...................
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Engineering Drawings.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.