2017-02-13 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 13 FEBRUARY 2017
Performance Bond
1516. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000.00
must be submitted to Council, to secure performance of all conditions of this approval,
prior to the issue of a Development Permit for Operational Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Sunset Clause for Completion of Approved Development
1617. Pursuant to s342 of the Sustainable Planning Act 2009, the uncompleted aspects of
this development approval lapses if the whole of the approved use has not happened
by 19 January 2021.
Building Appearance
1718. All air conditioning units or other mechanical equipment must be located at ground
level, or otherwise fully enclosed or screened such that they are not visible from the
street frontages nor adjoining properties.
Noise
1819. The applicant is to implement all of the recommended acoustic treatments provided in
the Environmental Noise Impact Assessment, by CRG Acoustics, dated 11 July 2016,
as they relate to Stage 4 of the development. The applicant is to provide additional
noise attenuation for the smokers terrace area to prevent the reliance on staff having to
manage subdued patrons using this area. Further, the applicant is to provide suitable
sound attenuation for the bin storage area to reduce adverse noise impacts caused by
rubbish being placed in the bins. These additional sound attenuation measures are to
be certified by a suitably qualified and experienced noise expert.
1920. The following specific acoustic treatments are to be applied to the building construction
and design as outlined in the CRG Acoustics Report of 11 July 2016:
a. Sound lock doors must be installed at the proposed smoker’s terrace as detailed
in the development application plans (Rubicon: Proposed Ground Floor Plans:
Stage 4 plan and Stage 5 & 6 plan).
b. Driveways, ramps and car park areas must be finished with surface coatings
which prevent tyre squeal (an uncoated surface is acceptable).
c. All drainage grating over trafficable areas must be secured in a way that prevents
rattling or nuisance noise.
d. Car park exhaust ducting is to have acoustic insulation before and after any right
angle bend (900) at the outlet end of the exhaust fan/s.
e. Car park exhaust discharge riser is to be lined with 50mm thick insulation
(hydrophobic fibreglass batts min. 32kg/m2 ) faced with perforated metal (min.
12% open face area)
f. A minimum Rw 34 (i.e. 10.76mm laminate in acoustic grade frames and acoustic
seals) must be used for all new external windows and glass doors of the function
/ dining extension, children’s lounge and the new alfresco lounge.
g. New external walls of areas where amplified entertainment is proposed should be
constructed to achieve a minimum Rw rating of 50.
Page 8 of 14