Council archive · source document
ADOPTION OF DESTINATION MANAGEMENT PLAN · ATTACHMENT 1_Destination Management Plan
Plans and drawings: the text below has words only, no drawings.
• Both qualitative and quantitative analysis of responses was conducted.
• The analysis deep dive was extensive and reviewed over 500,000 words.
Phase 5 – Draft DMP Preparation:
• Integration of findings from evidence-based analysis and stakeholder insights.
• Development of Draft DMP incorporating principles, strategies and actions across key
areas:
• community wellbeing, environmental protection, transport, housing, and tourism
industry
• development.
Phase 6 – Phase 2 Community Consultation:
• Release of the draft DMP for public and stakeholder
• consultation.
• Multi-channel engagement, including workshops, surveys, social media campaigns,
and targeted stakeholder meetings.
• Collection and analysis of feedback to refine and finalise the plan.
• Peer Review
Phase 7 – Current Phase - Endorsement and Implementation Planning:
• Final DMP to Council for adoption.
• Development of a draft implementation framework, including monitoring and evaluation
measures to track progress and ensure accountability.
Community Feedback
This Destination Management Plan is a community-led plan, shaped through extensive local input, and
built on a shared vision for Noosa’s future.
With broad support from across all parts of Noosa we’re embracing a regenerative approach to tourism.
This plan represents a shared opportunity to future-proof the region, ensuring we can better manage a
growing visitor economy and safeguarding the Noosa experience for everyone.
Community Priorities Ranking*
100% 86%
78%
80% 69%
61%
60% 49% 53%
36% 42%
40% 29%
20%
0%
Figure 19: Phase 1 Community Engagement - Community Priorities
Page | 53
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original