Skip to the record
Accept no imitations.

Original source · versioned page text

Cover Letter_Precinct E2_CDA_FINAL

Attached to the e-mail Change to DA - MCU15/0109.01 Email 1 of 3.

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Condition 50
It is requested that this condition be amended to align requested monitoring periods detailed in New Condition
49 above, to read as follows:-


50.    For a minimum of 5 rainfall events per year, stormwater at the following locations and times must be
       collected and sampled for Total Nitrogen, Total Phosphorous and Total Suspended Solids using NATA
       accredited methods:
       a.      The release point from Precinct E2 for all waters directed to the Noosa Springs lake system.
       b.      At monitoring point W6 shown on Plan A – Water Quality Monitoring Locations Noosa Springs by
               Jelliffe Environmental (Qld) Pty Ltd.
       The time for collection of water samples for monitoring must be quantified by the applicant’s hydraulic
       engineer within the Operational Works application for stormwater. The time for water quality monitoring
       shall be a minimum of the time of concentration for all waters from Precinct E2 destined for the Noosa
       Springs Lake System to reach the release point from Precinct E2, and within a maximum of 24 hours of
       commencement of rainfall events that generate runoff from Precinct E2.

       Water quality monitoring required by this condition must commence at the commencement of operation of
       the first stage of the development until five (5) two (2) years following the completion of the final stage of
       the development

Condition 49
This condition appears to have been erroneously maintained in the Negotiated Decision Notice, as it is
superseded by updated Condition 50. It is requested that this condition, which is reproduced below (in
strikethrough) be deleted:-

49       During the first 5 years of operation, for a minimum of 5 rainfall events per year, stormwater at the
         following locations and times must be collected and sampled for Total Nitrogen, Total Phosphorous and
         Total Suspended Solids using NATA accredited methods.:
         a. The release point from Precinct E2 for all waters directed to the Noosa Springs lake system.
         b. At monitoring point W6 shown on Plan A – Water Quality Monitoring Locations Noosa Springs by
              Jelliffe Environmental (Qld) Pty Ltd.
         The time for collection of water samples for monitoring must be quantified by the applicant’s hydraulic
         engineer within the Operational Works application for stormwater. The time for water quality monitoring
         shall be a minimum of the time of concentration for all waters from Precinct E2 destined for the Noosa
         Springs Lake System to reach the release point from Precinct E2, and within a maximum of 24 hours of
         commencement of rainfall events that generate runoff from Precinct E2.

Condition 65
As per our representations on the equivalent condition for the Precinct F approval (Ref: 132005.1133.6), it is
noted that this condition has been introduced through the negotiated decision process. Our representations on
the Precinct F approval are directly relevant to Precinct E2 Condition 65, and as such are reproduced (where
relevant) below.




JFP Ref: M2652/E2                                                                                                Page 8
Log in to download the original file

Cover Letter_Precinct E2_CDA_FINAL.pdf · 699 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.