Council archive · source document
07/0261 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142007.261
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Operational works ina tidal areaor |9. The application involves operational work that is: (tick the applicable box/es)
coastal management district Forme (1 (i) tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work in local Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
government tidal areas refer Guide 24 LO Wii) tidal work that is prescribed tidal work" other than in a canal’? -complete Part P of Form 1; or
Uniess you answered *none of the above" fo Q9, the a . a oe
application requices assessment by the Ci (ii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency {EPA). Part M of Form 1 if any box/es (a) to {i) below are ticked.
marae Necppeaten EST (1) constructing or installing works in a watercourse between MHWS and HAT (ie.
agency for the application in relation to this matter. other than those works in tidal water) where the development has been determined not
Local government is the assessment manages for all to be assessable against the Water Act 2000 ;
prescribed tidal work.
(1 (b) constructing a canal’? intended to be connected to tidal waters;
C1 (c) constructing an artificial waterway: ‘
(1 (d)_ reclaiming land under tidal water;
LJ (e) disposing of dredge spoil or other solid waste material in tidal water;
(1 (f) interfering with quarry material on State coastal land above high-water mark;
(Dg) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
[1 (h)_ removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
{iv) none of the above. , e
Operational work below high water 110. The application involves operational work that is: ( tick the applicable box/es)
mark information refer to Guide 48. For mare (1 (i) tidal work"3 as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work in focal Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
Votes you answered vane . eae ‘oot (i) tidal work that is prescribed tidal work" - complete Part P of Form 1; oF
the application ages cera to Queensland C1 (ii) carried out within a coastal management district'S under the Coastal Act and for -
concurrence agency O {a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager for all Mof Form 1;
Prescribed Idol work (1) (b) reclaiming {and under tidal water - complete Part M af Form 1; or
[1 (c) constructing a canal's, if the canal is associated with reconfiguring a lot - complete
of Part M of Form 1,
{iv) none of the above.
Coastal management 11. The application involves: (tick the applicable bowes)
For more information refer to ane on CI (i) amaterial change of use assessable under a planning scheme involving operational
Unless you answered “none of the above" to Q11, 1 i istrict!S
the application requives assessment by the work carried out completely or partly in a coastal management district
Environmental Protection Agency (EPA). Ci) a material change of use assessable under a planning scheme involving building
If an agency other than EPA is the assessment i i istri is —
manager lr the appicabon, EPA is @ concurrence work, carried out completely or partly in a coastal management district that is
agency for the applicaton in relation to this matter. + the construction of a new premises with a GFA" of at least 1000m? @
+ the enlargement of the GFA of existing premises by more than 1000m?2
Ci(ii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
C1 (iv) reconfiguring a lot's assessable under schedule 8 of the IPA and in connection with
the construction of a canal'® - complete Pant M of Form 1
di {v} none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescned tidal work is defined in the Coastaf Protection and Management Regulaton 2003 and includes certain udal works completely or partly within a local government tidal area
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain udal works completely or partly within 2 focal government bdal area.
45 Coastal management distict is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management disirict under section 47(2) of that AcL
16 Canal means canal as defined under the Coastal Protection and Management Act 1995
17 GFA is defined in sch 14 of the IPA to mean the gross floor area. For 2 definition of how to calculated GFA, go to the planning scheme against which the apphcation is being assessed.
18 Under $117 of the Coasta! Protection and Mai jent Act 1995, an application for ration, where the F uration is associated wiih the construction of an artificial waterway, must be
accompanied by the appkication for the operational works to construct the artificial waterway.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0261 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.