07/0261 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142007.261
INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24.
It you answered “YES” to Q12, the application
tigers referrat to the Port Authority.
The Port Authority is a concurrence agency if the
development is -
‘* within 200m of a shipping channel or an entry
and exit shipping corridor for the port
‘© within 1000m of a swing basin, a commercial
shipping wharf, a mooning, anchorage or spoil
grounds;
* within 1000m of a planned port facility identified
in a tand use ptan approved under the Transport
infrastructure Act 1994.
tn al other situation the Port Authority is an advice
agency.
12.
IDAS Assessment Checklist, Version 18.0, 10 Navember 2006,
Does the application involve development below high water mark’? and within the limits of a port
under the Transport Infrastructure Act 1994?
lO
{77 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
Marinas
For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local government
is the assessment manager for all prescribed tidal
work,
tf you answered “YES” to Q13, the application
triggers referral to Queensiand Fire ang Rescue
13.
Does the application involve operational work that is tidal work for a marina2° with more than 6
vessel} berths?
NO
(YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
Applications involving material change of use and?
of reconfiguring a lot may trigger this referral.
For more information refer to Guide 5.
Unless you answered “none of the above" to Q17,
the application requies assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA is the assessment manager
for the application, EPA will be a concurrence
agency for the application in relation to this matter.
Service as an advice agency. |
Tidal works in strategic port land tidal] 14. Does the application involve tidal works within a strategic port land tidal area"?
areas Ero
For more information refer to Guide 18. y
- complete Part M of Form 1
Unless you answered “NO” to Q14, the relevant Port oO ES pe
Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT) are
concurrence agencies for the application.
Heritage 15. Does the application involve development in a heritage registered place as defined under the
For further information refer to Guide 19. Queensland Heritage Act 1992?
Ifyou answered “YES” to Q15, the application ho
triggers referrat to the ind Heri ung
as concurrence agency for the application. oO YES - complete Part C of Form 1
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, inctuding a list of the declared involves: (tick the applicable boxes)
catchment areas within Queenstand, refer to Guide . so 7 . oo
C1 (i) reconfiguring a Jot if any lot resulting from the reconfiguration is less than 16 hectares;
mass you angered "none ot ihe above’ 76, CJ (ii) development assessable against the planning scheme involving the establishment or
Deparment of Nata Resources ines and Water expansion of a waste water disposal system, other than a disposal system for carrying
(NRMW). out an environmentally relevant activity under the Environmental Protection Act 1994;
Mf an agency other than NRMW is the assessment fs
manager for the application, NRMW is a aii) none of the above
concurrence agency for the apptication in relation to
this matter.
Contaminated land 17. The application involves: (tick the applicable box/es)
(i) reconfiguring a fot for which all of part of the premises are -
{a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
+ item 5, including the exemption otherwise provided for by paragraph (d);
+ item &, including the exemption otherwise provided for by paragraph (e); or
+ item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
C1 (i) a material change of use -
{a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
[M(iii) hone of the above
19 High water mark is defined in the Coastaf Protection and Management Act 1995 and means the ordinary high water mark at spring tide,
20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
21 Strategic port land tidal areas are the areas generally 50 metes seaward of high water mark adjacent to stategic port land.
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0261 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.