Pedestrian and Bicycle Facilities
25. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with the conditions of this Decision Notice and be generally in
accordance with Barlow Shelley’s Roadworks & Drainage Layout Plan (C200 Rev A) dated
15/05/2026 and must include in particular:
a. A 1.5 metre wide footpath within the road verge for the entire length of the site’s
frontage to Bottlebrush Ave.
Stormwater Drainage
26. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the conditions of this Decision
Notice and be generally in accordance with Barlow Shelley’s Roadworks & Drainage Layout
Plan (C200 Rev A) dated 15/05/2026 and must include in particular:
a. the reconstruction of existing stormwater gully pit (Structure 2/EX1)
b. protection of the existing 300mm diameter council stormwater pipe traversing the
development site.
Services
27. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
28. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
29. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
30. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
31. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
32. All works must be carried out in accordance with the recommendations contained in
Tectonic’s Geotechnical Investigation (25408-001-Rev0) dated 30 January 2026 listed within
this Decision Notice.
Earthworks and Retaining Walls
33. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be undertaken in accordance with the conditions of this
Decision Notice, be generally in accordance with the conditions of this Decision Notice and
be generally in accordance with Barlow Shelley’s Bulk Earthworks Plan (C101, Rev. A) dated
15 May 2026 and contained entirely within the subject site unless written permission from
the respective landowner(s) is provided to Council.
Damage to Services and Assets
34. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
Page 21 of 33
Document Set ID: 24436845
Version: 6, Version Date: 09/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU26 0001 - AS PUBLISHEDRelated documentApplication case desk ↗
About this file
- File size
- 8.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.