NOOSA COUNCIL IDAS Development Application Decision Notice                                                           5


24.       The site shall be connected to Council’s existing town water supply in Park Road and be constructed in
          accordance with Council’s standards and requirements at no cost to Council.

25.       Each water connection to the water reticulation system shall extend to the property boundary and be
          metered.
          Geotechnical Issues/Construction

26.        The disposal of sand, soil or any materials created by the construction of the dwellings shall be removed
          in accordance with the Construction Management Plan with trucks greater than 5 metres in length not
          permitted. Details of the method of this disposal of materials are to be submitted to Council at the
          Building Application stage. Not more than one vehicle at a particular time will be parked in Park Road for
          the removal of, or the delivery of, materials associated with the site and no such vehicle shall remain
          overnight. No materials are permitted to be stored within the road reserve.

27.       A programme of works is to be submitted with any application for any Development Permit for Operational
          Works detailing the construction schedule and proposed environmental protection measures, including a
          vegetation management plan, which addresses stabilisation of disturbed areas.

          Where the program is changed for any reason whatsoever, a copy of the revised program shall be
          submitted to Council’s Works Inspector within seven (7) days.

28.       A Traffic Management Plan for the Construction of the Dwelling addressing the access to the site, the
          locating of equipment and any potential conflicts with local traffic shall be submitted and approved by
          Council prior to Development Permit for Operational Works. It should be noted that workers vehicles are
          to park in Allambi Rise, with no vehicles associated with the construction of the dwelling permitted in Park
          Road.

29.       Prior to the issue of a Development Permit for building works the builder shall submit written
          acknowledgment that building works shall proceed in accordance with the 9 tonne load limit applicable to
          Park Road, unless varied by Council.

30.       At the completion of construction the consulting geotechnical engineer will certify that all works were
          carried out in accordance with their recommendations and that the structures and the site are stable.
          Erosion and Sediment Control

31.       Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
          control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
          waste, will be necessary.
          In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
          to the Council for approval prior to obtaining a Development Permit for Operational Works.
          General

32.       Any damage caused to any public utility during the course of construction shall be repaired to Council’s
          standards and at no cost to Council.

33.       Any alteration of any public utility or other facilities necessitated by the development of the land or
          associated construction works external to the site shall be at no cost to Council.

34.       The transportation of all materials to and from the site shall be undertaken in a manner such that no
          particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
          be covered to prevent materials including dust being windblown from the vehicle.

35.       Where the existing retaining wall along the Park Road frontage of the site is removed to create the
          driveway crossover the retaining wall shall be remediated immediately following the completion of the
          earthworks for the driveway. A Development Permit for Operational Works shall be obtained for these
          frontage works.
Building

36.       The Geotechnical report submitted as part of your application has been appraised and approved subject
          to the following conditions:-




H o:\database\onestop\decision.doc

Used in these records

About this file

File size
43 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Compiled Decision Notice [As Published].pdf · 43 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.