NOOSA COUNCIL IDAS Development Application Decision Notice                                                            6


          36.1. There is to be no uncontrolled discharge of water onto the slope;

          36.2. Stripping of vegetation for construction purposes should be minimised. If vegetation is destroyed it
                should be reinstated immediately after that stage of construction is completed;

          36.3. Additional load due to fill, construction equipment or stockpiled materials should not be located on
                the dune slope;

          36.4. The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers,
                the use of vibrating installation techniques for sheet piling and other construction vibrations caused
                by excavating, earthmoving or demolition machinery or other similar construction techniques;

          36.5. All construction works on site shall accord with the Building Construction Report prepared by
                Whaleycg Consulting Group dated December 2002 and the Morrisson Geotechnic reports dated
                1/9/00, 25/5/01.

          36.6. A condition survey is to be carried out of adjoining buildings, structures and services prior to any
                demolition works or construction works taking place on site. If distress already exists, a
                photographic survey shall be undertaken, the distress measured and a plan to monitor changes to
                distress shall be implemented. A copy of this report is to be submitted to Council within 5 business
                days of survey and prior to construction work proceeding;

          36.7. Copies of all inspection reports by engineers are to be submitted to Council within 5 business days
                of the inspection taking place;

          36.8. A RPEQ is to be engaged by the client to oversee the piling works and copies of all inspection
                reports are to be submitted to Council within 5 business days of the inspection taking place;

          36.9. The applicant’s Geotechnical engineer will be required to be on site for the whole of the time during
                any excavation. The construction of the whole of the foundations is to be supervised and directed
                on site by a consulting Geotechnical engineer. No work of any such kind relating to the
                foundations shall be carried out if he is not on the site and supervising and directing this work.
                Such works shall only be carried out during dry weather conditions and if there is a risk of sand
                movement occurring, all work shall be suspended until such steps, approved by the applicant’s
                Geotechnical engineer and the Council’s Building Surveyor, have been taken to ensure that no
                further slippage will result.

          36.10. The builder, landscaper and all workers associated with construction of the works shall at all times
                 comply with the directions of the consulting geotechnical engineer.

37.       A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged
          with Council at completion of the work confirming compliance with the minimum required floor level and
          the maximum building height above natural surface, required by the provisions of the Planning Scheme.

Additional Conditions
          1.        The driveway and garage are not approved in their current location and shall be sited in
                    accordance with the Footing Plan prepared for The Robertson Residence
          2.        A qualified arborist shall be present on site to supervise works around the root zones of all trees
                    required to be retained. Prior to commencing any works safety fences shall be installed around the
                    trunks and as much of the root zone as possible to minimise the risk of compaction and damage.




H o:\database\onestop\decision.doc

Used in these records

About this file

File size
43 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Compiled Decision Notice [As Published].pdf · 43 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.