SUPERSEDED Decision Notice - Advice Agency - EPA [As Published] · 132007.2399
2007/2399
Acid Sulfate Soils
3
66. As the site is located below the 5m AHD, any excavation works consisting of 100m or greater
3
and/or any filling works consisting of 500m or greater and with an average depth of 0.5m or
greater will need to be carried out in accordance with State Planning Policy 2/02 Planning and
Managing Development Involving Acid Sulfate Soils. In this regard appropriate testing and
supporting documentation prepared by a suitably qualified specialist shall be submitted to
Council for approval prior to obtaining a Development Permit for Operational Works.
67. As the subject site is likely to contain Acid Sulfate Soils, Council wishes to make the applicant
aware of their obligations in terms of good environmental practice, which requires that Acid
Sulfate Soils:-
should not be removed from the site,
should not be disturbed, if possible, and
should be treated and neutralized on site where required.
In the event that Acid Sulfate Soils are removed from site and forwarded for disposal at one of
Council’s landfill sites, Council may:-
refuse to accept such soil, or
treat and neutralize the soil and charge such costs for soil testing and remediation to the
applicant and or developer of the site.
Site Stability
68. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or land, and make recommendations on
the type of foundation system(s) best suited for the proposed development. The
recommendations of this report shall be incorporated into the design and construction of the
proposed development.
Erosion and Sediment Control
69. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Vegetation Protection & Preservation
70. All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
Stock Route Management) Act 2002 are to be controlled on the site prior to Council
endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2
pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they
threaten environmentally significant areas of the site such as riparian zones and areas of
natural vegetation. Where class 3 plants are removed as a result of this condition and there is
not sufficient natural regeneration of native species, the areas shall be replanted with endemic
native species so that a sustainable natural ecosystem is restored.
Council’s Conservation Management Supervisor will not inspect the site until 30 days after the
weed treatment and replanting is complete
Page 10 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - Advice Agency - EPA [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.