SUPERSEDED Decision Notice - Advice Agency - EPA [As Published] · 132007.2399

of 24

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                      2007/2399



71.   Vehicular pavements within the drip zone of any of the existing trees on site to be retained
      shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
      allow water that falls on this surface to penetrate to the trees root system. The pavement shall
      be constructed so as not to damage the tree or their root system and in this regard temporary
      fencing shall be provided around the trees during construction to help protect them.
      Plans shall be submitted to the Council for approval that clearly show the type and extent of
      the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
      Operational Works.
72.   Where retained tress are located in areas proposed to filled on site (or are located on
      neighbouring allotments to the actual site to be filled), there will be a need to prevent fill
      material from being placed on the trees root system. To this end the design of the filling works
      will need to incorporate terracing around the tree or a similar means of ensuring that the
      natural ground level around the trees remains generally the same as existing. These
      measures shall clearly be shown on the plans submitted for Operational Works approval and
      any drainage required to drain these areas shall also be shown on the plans.
Contributions Towards Council Infrastructure
73.   Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
      upgrading various infrastructure at the rates applicable at the time of payment. An estimate
      only of the contribution amounts under the current Council policies and requirements is
      outlined in the table below:


                                                                                 Amount:
       Contribution Required For:
                                                                   Stage 1       Stage 2           TOTAL
       PSP12 – Public Open Space Contributions (Park)                $ 3,126     $ 81,286          $ 84,412
       PSP16 – Sewerage Headworks Contributions                      $1,318        $34,270          $35,588
       PSP17 – Water Supply Headworks Contributions                  $4,892      $127,204          $132,096
       PSP20 – Pathway Trunk Network Contributions                     $703        $18,271          $18,974
       TOTAL Contribution Amount =                                 $ 10,039      $261,031          $ 271,070
       Please note, that these amounts are all subject to variations in the Consumer Price Index, All
       Groups Brisbane from JUNE 2008 until the date of payment.

      All contributions must be paid prior to Council endorsement of the plan of survey.

General
74.   A suitably qualified Registered Professional Engineer Queensland shall prepare engineering
      drawings and specifications for all engineering works, which shall be submitted in conjunction
      with an application for a Development Permit for Operational Works. In this regard a
      DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in
      conjunction with any application for Operational Works.
75.   Digital detailed designs including drawings, calculations, specifications and a schedule of
      works, shall be submitted with any application for a Development Permit for Operational
      Works in respect of roadworks and stormwater drainage works. The design shall be in
      accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards –
      Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all
      existing and proposed services required by the development shall be shown on the plans.
76.   To facilitate production of As Constructed drawings it is suggested that all design drawings are
      submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
      use of ADAC are available at www.adac.com.au).
                                                                                   Page 11 of 24

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Notice - Advice Agency - EPA [As Published].pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.