Approved Amended Plans · OPW11/0131

of 9

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

Feci’9 |"03

 

[°""_4400-02-cE

DRAWING INDEX

 

BUNNINGS WAREHOUS
EUMUNDI-NOOSA ROAD, NOOSAVILLE
ROUNDABOUT AND ROAD WORKS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EC10F 9 | GENERAL NOTES & DRAWING INDEX Se
IN ACCORDANCE WITH HOLD POINTS SPECIFIED IN PRE-START
—C2 OF 9 PROPOSED ROUNDABOUT PAVEMENT LAYOUT PLAN DOCUMENTATION, ALL HOLD POINTS TO BE CERTIFIED BY A RPEQ
GENERAL NOTES CONCRETE NOTES CIVIL NOTES ENGINEER,
EC3 OF 9 GATEWAY DRIVE CROSS SECTIONS THESE DRAWINGS SHALL BE READ IN ALL CONCRETE AND CONCRETE PRACTICE SHALL BE GENERALLY ‘ALL DIMENSIONS ARE IN MILLIMETRES UNLESS SHOWN PROVIDE TOOLED JOINTS IN KERBS, KERB AND CHANNEL AT 2,0m
CONJUNCTION WITH THE SPECIFICATION AND IN ACCORDANCE WITH AS 3600 CONCRETE STRUCTURES CODE OTHERWISE, ALL LEVELS SHOWN ARE TO AUSTRALIAN HEIGHT MAXIMUM CENTRES,
ALL OTHER RELEVANT CONSULTANTS DATUM (TBM) AS NOTED ON THE PLANS, ALL SET-OUT
EC4 OF 9 EUMUNDI EAST CROSS SECTIONS DRAWINGS, SPECIFICATIONS, CLIENT ‘ALL INSITU CONCRETE SHALL HAVE A CHARACTERISTIC CO-ORDINATES ARE BASED ON AN ARBITRARY CO-ORDINATE 'SAWCUT EXISTING KERBS & PAVEMENTS WHERE REQUIRED FOR
INSTRUCTIONS, AND ANY WRITTEN STRENGTH AT 28 DAYS (F'c) OF 25 MPa UNLESS NOTED SYSTEM AS NOTED. INSTALLATION OF NEW KERBS AND WHERE NEW WORK IS TO
INSTRUCTIONS ISSUED DURING THE COURSE OF OTHERWISE MATCH EXISTING
THE CONTRACT. ANY DISCREPANCIES SHALL BE UNLESS OTHERWISE SPECIFIED OR APPROVED BY THE ENGINEER,
ECS OF 9 EUMUNDI WEST CROSS SECTIONS REFERRED TO THE ENGINEER FOR DISCUSSION CONCRETE ELEMENTS SHOWN ON THESE DRAWINGS MUST NOT LAYING OF ALL PIPES OR CULVERTS SHALL COMMENCE AT THE THE CONTRACTOR SHALL AT ALL TIMES DURING THE CURRENCY
BEFORE PROCEEDING WITH WORK BE REDUCED IN ANY WAY WITHOUT THE ENGINEER'S DCURISTRERRENE OF THE WORK PROTECT THE PUBLIC FROM THE WORKS, PLANT
EC6 OF 9 KERB SETOUT CO-ORDINATES AND LEVELS APRAGY Abs HO/HOL ES; CHASES) OR EMBEDHENTs: OTHER, TRENCHES ETC. OCCASIONED BY THE WORKS BY THE USE OF
DIMENSIONS SHALL NOT BE OBTAINED BY THAN THOSE SHOWN WILL BE PERMITTED IN ANY CONCRETE PRIOR TO ANY WORKS COMMENCING THE CONTRACTOR SHALL APPROVED BARRICADES ANO BARRIERS. SUCH PROTECTIVE
SCALING THE DRAWINGS, ELEMENTS-WUTROUT THE ENGINED SS ARFRDYAL COMPLETE A CHECK OF ANY EXISTING CONNECTING STORMWATER MEASURES WILL BE SUBJECT TO THE APPROVAL OF THE
EC7 OF 9 GATEWAY DRIVE LONGITUDINAL SECTION 7 REINFORCEMENT NOTATION DETAILS, INCLUDING INVERTS, DIAMETERS, DEPTHS, MATERIAL ENGINEER AND A REPRESENTATIVE FROM SUNSHINE COAST
SUBSTITUTES WILL NOT BE PERMITTED AEINEORCEMENT NOTATION ETC, TO CONFIRM ANY EXISTING DETAILS SHOWN ON THE REGIONAL COUNCIL. THE CONTRACTOR SHALL BE RESPONSIBLE
EC8 OF 9 DRAINAGE LONGITUDINAL SECTIONS TES pT THEWRICTEN APE RO VALOR THE Be DENOTES STRUCTURAL GRADE ELAM ROUND DRAWINGS, ANY DISCREPANCY SHALL BE REPORTED TO THE FOR ANY DAMAGE OR INJURY ARISING FROM THE NEGLECT OR
ENGINEER, INSUFFICIENCY OF SUCH PRECAUTIONS
DURING CONSTRUCTION THE SITE SHALL BE “spew RMON THE CONTRACTOR IS ADVISED THAT THE MINES (TRENCHES)
ED CONCRETE AS NOTED.
EC9 OF 9 | LINEMARKING PLAN MAINTANED NA STABLE CONDITION AN NO se DENOTES SIZE OF FABRIC . REGULATIONS 1982 WILL APPLY TD THS PROJECT. THE
PART OF THE SITE SHALL BE UNSAFE AS A UID DENOTES/SIZE'URFAERIG) RC PIPES ARE TO BE RUBBER RING JOINTED CLASS 3 UNDER CONTRACTOR IS REQUIRED TO SATISFY AND/OR PUT INTO
RESULT OF THE CONSTRUCTION PROCEDURE. ‘LAPPING REINFORCE MENT So so VEHICLE PAVEMENTS. ALL RC PIPES ELSEWHERE ARE TO BE EFFECT ALL REQUIREMENTS OF THOSE REGULATIONS AND THOSE
ese ce EE CLASS 2 WITHOUT RUBBER RING JOINTS. OF THE OFFICE OF MINERALS AND ENERGY.
ACCORDANCE WITHTHE SPECFICATION AND RAINAGE PIPES MUST BE BEDDED IN ACCORDANCE WITH THESE THE WORKS SHOWN HEREIN ARE SUBJECT TO THE SUPERVISION
ACCORDANCE WITH THE SPECIFICATION ANO DRAINA
SUNSHINE COAST REGIONAL COUNCIL TRENCALMESA S00 -—— MEULEMOTHIATINTERSESTION DRAWINGS. OF THE PRINCIPAL'S APPOINTED SUPERINTENDENT
STANDARDS, THE CURRENT BAR SIZE TOP BARS OTHER BARS
REVISION OF ALL RELEVANT SAA CODES, THE (300mm OR MoRE DRAINAGE, SERVICES AND CONDUIT TRENCHES UNDER CARE IS TO BE TAKEN TO PROTECT EXISTING FENCES, BUILDINGS,
REQUIREMENTS OF THE QUEENSLAND BUILDING CONCRETE BELOW) PAVEMENTS, FOOTPATHS ANO PAVING ARE TO BE BACKFILLED FITTINGS, SERVICES, FURNITURE, SIGNAGE, TREES AND OTHER
REGULATIONS, THE BUILDING CODE OF wie 300 TO THE UNDERSIDE OF THE PAVEMENT WITH AN APPROVED ITEMS TO BE RETAINED FROM ANY DAMAGE
11 Nts 100 400 CONSOLIDATED MATERIAL IN ACCORDANCE WITH THE RELEVANT
ERIN OT Ae an TAN TRORITES N20 600 MUNICIPALITIES CONDITIONS, UNWANTED PITS, PIPES SERVICES ECT. IN PAVEMENT AREAS ARE
TO BE REMOVED AND THE HOLE BACKFILLED WITH AN APPROVED
ee aconee cover THE LOCATION OF EXISTING UNDERGROUND SERVICES SHOWN IS, CONSOLIDATED MATERIAL IN ACCORDANCE WITH THE RELEVANT
CLEAR COVER TO REINFORCEMENT SHALL BE AS NOTED INDICATIVE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR MUNICIPALITIES CONDITIONS,
(ON THE DRAWINGS. CONTACTING ALL AUTHORITIES TO DETERMINE THE LOCATIONS
THE LOCATION OF UNDERGROUND SERVICES OF UNDERGROUND SERVICES AND OTHER ASSOCIATED WORKS, THE CONTRACTOR SHALL INSPECT THE SITE AND DETERMINE THE
SHOWN ARE INDICATIVE ONLY. THE CONCRETE COVER SHALL BE MAINTAINED BY THE USE EXISTING ASPHALT PAVING, PITS, PIPES, SERVICES, TREES,
CONTRACTOR IS RESPONSIBLE FOR OF APPROVED CHAIRS AND/OR CONCRETE BLOCKS ANY CLASH OF THE WORKS WITH A SERVICE /S TO BE REPORTED KER@S, DRAINS, BUILDINGS, FITTINGS, FURNITURE, SIGNAGE, ETC
CONTACTING ALL AUTHORITIES TO CONDUITS, PIPES ETC. ARE NOT TO BE PLACED IN TO THE ENGINEER IMMEDIATELY. THE CONTRACTOR SHALL THAT ARE TO BE REMOVED AND HE SHALL ALLOW IN HIS TENDER
DETERMINE THE LOCATION OF UNDERGROUND CONCRETE COVER ENSURE THAT SERVICES ARE FULLY PROTECTED DURING PRICE FOR ALL COSTS ASSOCIATED WITH THE NECESSARY
SERVICES PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. ANY SERVICES DAMAGED OURING CONSTRUCTION REMOVAL.
CONSTRUCTION WORK, ANY CLASH OF THE SLUMP OF ALL CONCRETE AT THE TIME OF PLACING AT SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE
WORKS WITH A SERVICE IS TO BE REPORTED THE JOB SHALL BE 75mn +/~ 15mm TOLERANCE UNO IN AREAS WHERE THERE IS TO BE FILLING UNDER PAVEMENT
TO THE ENGINEER IMMEDIATELY. THE SERVICES OTHER THAN THOSE SHOWN ON THE DRAWINGS MAY AREAS, THE SUBGRADE SHALL BE CLEARED OF ANY ROOT
CONTRACTOR SHALL ENSURE THAT ALL ALL CONCRETE PLACED IN POSITION SHALL BE ADEQUATELY EXIST. THE CONTRACTOR IS TO ALLOW FOR THE ALTERATION TO MATTER ANO LOOSE MATERIAL TO THE DESIGN LEVELS, THE
SERVICES ARE FULLY PROTECTED DURING VIBRATED SERVICES WITHIN THE SITE, INCLUDING THE ADJUSTMENT OF PIT SUBGRADE AREA SHALL BE PROOF ROLLED UNDER THE
CONSTRUCTION, ANY SERVICES DAMAGED COVER LEVELS AND THE REMOVAL AND SEALING OF UNWANTED ENGINEERS SUPIVISION USING A 10 TONNE AXLE LOAD TO
DURING CONSTRUCTION SHALL BE REPAIRED ALL CONCRETE SHALL BE CURED TO THE APPROVAL OF SERVICES & ASSOCIATED PITS & FITTINGS, LOCATE ANY SOFT SPOTS, ANY SOFT SPOTS SHALL BE
‘AT THE CONTRACTORS EXPENSE THE ENGINEER EXCAVATED AND REPLACED WITH AN APPROVED MATERIAL IN
EXPOSED SUBGRADE AREAS SHALL BE PROOF ROLLED UNDER 150mm COMPACTED LAYERS TO A MODIFIED ORY DENSITY OF 95%
ALL PIPEWORK CAST INTO CONCRETE IS TO BE SLEEVED THE SUPERVISION OF THE ENGINEER USING A 10 TONNE AXLE COMPACTION.
THE TERM “ENGINEER” SHALL MEAN A OR LAGGED WITH APPROPRIATE COMPRESSIBLE LOAD, SOFT AREAS DETECTED SHALL BE EXCAVATED AND THE CONTRACTOR SHALL ALLOW TO PROVIDE TEMPORARY
REGISTERED PROFESSIONAL MATERIAL FOR THE FULL LENGTH OF ENBEOMENT BACKFILLED AS DIRECTED BY THE ENGINEER SHUTTERS FOR ALL TRENCHES AS NECESSARY.
ENGINEER QUEENSLAND
THE PAVEMENT SUB-BASE COURSE IS TO BE COMPACTEO TO ‘SURPLUS SPOIL NOT REQUIRED BY THE DEVELOPER SHALL
97% MODIFIED MAXIMUM DRY DENSITY COMPACTION, THE BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE
PAVEMENT BASE COURSE T0 98% MODIFIED MAXIMUM DRY REMOVED FROM THE SITE, TO THE MUNICIPAL TIP OR A SITE
DENSITY. APPROVED UNDER THE COUNCIL PLANNING & ENVIRONMENT ACT
AND THE EPA ACT.
ALL WORKS ADJACENT TO THE SITE ARE TO BE APPROVED
INSPECTED BY SUNSHINE COAST REGIONAL COUNCIL THE CONTRACTOR SHALL DEVELOP AND ENSURE THE STRICT
THE ORIENTATION OF ALL STORMWATER DRAINAGE ACCESS Hee RAT OVCTER GREER URCATEERaANCE’UIT
MANAGEMENT SYSTEM GENERALLY IN ACCORDANCE WITH THE
COVERS & GRATES ARE SHOWN INDICATIVELY AND ARE 10 BE REL EVANTERA DIIEENGL ANCIREGU ATION
MANUFACTURED & INSTALLED IN ACCORDANCE WITH
AS3996-2006.
FOR CONSTRUCTION
issue ISSUED FOR GATE | ORAWN [APPROVED] ssUE] ISSUED FOR DATE [ORAWN [APPROVED] G. MANSELL PATE ago even prover —_—_—E>E>>>—==
01 | ISSUED FOR INFORMATION won| sm Paws, MANTERFIELO scale NTS CIVIL DRAWING
2 sseseo pou] = Sr —_ airanauR eR H. TROON PTY. LTD. | PROPOSED BUNNINGS
Lars Saar ; Barat ‘uunanion AND ree ragnicaTons WAREHOUSE maw TE
a | coNsTRUCTION ISSUE ‘wen se 315 sturt treat BUILDERS = COMMERCIAL AND INDUSTRIAL
ora hsmuateetaes gaan eis GENERAL NOTES & DRAWING INDEX
Ph: (03) 5330 8888 Te: 03 5339 2208 ~ (01 $339 3622 EUMUNDI-NOOSA ROAD
PATE: 10/08/11 [ea 10/08/11 webitamarelnc Fax, (03) 5338 1310

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

®© ‘COPYRIOMT T.0.M GROUP PTY. LTD.

 

ABN. 11125 568 461

 

 

Ena [email protected]

NOOSAVILLE, QUEENSLAND

 

 

 

 

oR REF We l seer

4400-02-CE

 

Ec1’9 ["03)

 
Full text of the other 8 pages

Page 2

 

NOTE: THE CONSTRUCTION CONTRACTOR IS TO BE AWARE OF AND ALSO
IMPLEMENT ALL RELEVANT PROCEDURES IN ACCORDANCE WITH
‘SUNSHINE COAST COUNCIL DEVELOPMENT APPROVAL DETAILS.

 

 

 

 

a. / . Metal storage sheds
NOTE: THE TOTAL REQUIRED PAVEMENT THICKNESS MUST BE BASEO ON THE DEPARTMENT OF MAIN ROAD'S PAVEMENT | }
DESIGN MANUAL USING SOAKED CBR TESTS OF THE SUBGRADE,
THE DESIGN PAVEMENT THICKNESS, TOGETHER WITH CBR TEST RESULTS MUST BE SUBMITTED TO COUNCIL'S CHIEF
EXECUTIVE OFFICER (CEO) FOR APPROVAL BRR TO PLACEMENT OF PAVEMENT MATERIAL.

 

 

 

RP222164

11g731 +9 AUG 201 2

MATCH EXISTING PAVEMENT LEVEL & J

2

: “ SP131406
FOOTPATH FOR INTERNAL !
ACCESS TO BUNNINGS i
Ce a J 7 TAY wet storage sheds

NOTE: THE LOCATION OF UNDERGROUND SERVICES SHOWN ARE < i: SIDE ENTRY PITS TO BE MODIFIED. 2941687 i a4

INDICATIVE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR “1 // MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL / Ss /

CONTACTING ALL AUTHORITIES TO DETERMINE THE LOCATION OF : \\\

UNDERGROUND SERVICES PRIOR TO THE COMMENCEMENT OF

/ rX\ / . 1
CONSTRUCTION WORK. ANY CLASH OF WORKS WITH A SERVICE IS f i} _-pROPO BUNNING: SITE /
TO GE REPORTED TO THE ENGINEER IMMEDIATELY, THE a Mi]

 

RP135064
{ pA
CONTRACTOR SHALL ENSURE THAT ALL SERVICES ARE FULLY ee Hi
PROTECTED DURING CONSTRUCTION, ANY SERVICES DAMAGED
CURING CONSTRUCTION SHALL BE REPAIRED AT THE

\\\\\ 7/7 RETAINING WALL IRW1), DESIGN BY OTHERS. .
CONTRACTORS EXPENSE, ay 7 / REFER STRUCTURAL DRAWING 4400-01 RO1 FOR DETAIL
/

 

 

 

 

Se oe?
| KERB T. 0 MATCH
PERIMETER FENCING TO BE INSTALLED ADJACENT TO RWI. THE | TO EXTENT OF WORKS
FENCE IS TO BE INSTALLED ALONG ENTIRE LENGTH OF RW1T0 THE | a

TISFACTION OF SUNSHINE COAST COUNCIL ENGINEER AND IN
ACCORDANCE WITH THE ENDORSED ARCHITECTURAL DRAWINGS
SERVICE AUTHORITY GUIDELINES. SP114181 f
CONTRACTOR TO NOTIFY THE SERVICE AUTHORITIES PRIOR TO
ANY WORKS COMMENCING

NOTE: ANY SERVICE THAT NEEDS TO BE ALTERED AS PART OF THE NEW 308
ROADWORKS SHOULD BE DONE SO IN ACCORDANCE WITH THE

 

 

 

NEW FOOTPATH TO

& XK
w\ N71
MATCH EXISTING :
NOTE: REFER SHEET EC9 FOR SIGNAGE AND LINEMARKING DETAILS.

5 KERB TO MEDIAN TO MATCH
F 2 REXISTING
g 0
NOTE: CONTRACTOR TO ENSURE THAT ALL WATER MAINS HAVE A A BUP13364
MINIMUM OF 1.2m COVER UNDER ALL TRAFFICABLE AREAS. 3 e
WATER MAIN TO BE LOWERED IN AREAS THAT DO NOT HAVE THE J
/ (

 

 

MINIMUM COVER fc

 

 

NOTE: ISOLATION VALVES TO BE INSTALLED ON EXISTING WATER MAINS, ff
POSITIONS OF ISOLATION VALVES TO BE LOCATED EITHER SIDE OF PROPOSED
ROUNDABOUT. FINAL POSITION TO BE CO-ORDINATED WITH SUNSHINE COAST
COUNCIL ENGINEER, UNITY WATER AND CONTRACTOR ON SITE

 

 

“MATCH PAVEMENT
LEVEL & GEOMETRY

 

3 EXISTING PAVEMENT ALONG 7
VEGETATION CLEAR ZONE FROM OVERHEAD POWER LINES, / EDGE: OE NEN RENE ts nr103723
LIMIT TREE REMOVAL IN ACCORDANCE WITH COUNCIL . S 1
INSPECTION AND IN PRINCIPAL AGREEMENT FROM SITE
MEETING ON 22/06/11

BUP 13364
RP131576

EXISTING SIDE ENTRY PIT TO BE MODIFIED.
MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL

DESIGN KERB & CHANNEL

KERB & CHANNEL TO BE REMOVED

22 KERB & CHANNEL TO BE REMAIN
PAD SUITABLE FOR A BESSY rusia
COUNCIL VEHICLE, REFER LANDSCAPE aeemare; fates
506 . o/_ARHITECTS DRAWINGS FOR LOCATION. EXTENT OF PROPOSED ‘ATH PLLA
i KERB ISLAND power

SP114181 < 0, BE REMOVED EXTENT OF T PAVEMENT TO BE

C CBR & EXISTING
4 P, TESTING

RELOCATED WATER MAIN (IN ACCORDANCE sewer FRE
EXISTING KERB WITH INDICATIVE UNITYWATER PLAN) - To BE © MANHOLE r © HyoRANT

EL) CONFIRMED WITH UNITY WATER cm INSPECTION @ SHRUB water

PENG ae

TRAFFIC Crd

Wir & Ret + souuaro

sion STA a RE

wp ggcTciry —eustRA
mT Pr

astra ©

Aa

o Teisiza = i

coi ts

ea + AME @ TP

© gscrncry me VATER
BARE sage VALVE

EXTENT OF BIKE LANE LINEMARKING

LINEMARKING

——€ swwiecr or sounoany

: hoe tastone
NDI ROEREADUND POWER BLE
EUM 910 ‘ 2 —— one
RP150347

sewer tine
RP150347 ————— _ STORMWATER LINE

EXTENT OF PAVEMENT WORKS

19
TRANSITION NEW KERB i 3
ALIGNMENT TO MATCH 7 RP150347
EXISTING ALIGNMENT, 3 902
2

7 \ AP150547
BRP 150345

PAVING

TSSUEO FOR DATE | ORAWN ISSUED FOR ‘DATE [DRAWN [APPROVED G. MANSELL s/o
ISSUED FOR INFORMATION sro] SM, PRAWNS. MANTERFIELD SALE 4500
ERG ALIGNMENT MODIFIED, Issue To ENERGEX [08/04/11] SH

CIVIL DRAWING 0
aa SETHE TGM GROUP Pty Ltd H. TROON PTY. LTD. PROPOSED BUNNINGS SS
les Viacein au telat
(KERB ALIGNMENT MODIFIED, RE-ISSUED TO ENERGEX | 20/04/11] SM. ee lita 1315 Sturt Street
0. TRIGG A. BARHAM RPEQ.
Te PS a

sat eercucaacm | WAREHOUSE
sae
en Fw APPROVAL inn SH

PROPOSED ROUNDABOUT

Ph: (03) $330 8888 2051 Fs) so "70e = 0) 9309 3622 EUMUNDI-NOOSA ROAD
10/08/11 pare 10/08/11 aWeb: tamgroun. comm ow ASAZS a0

CONSTRUCTION ISSUE wren] sé

ABN. 11125 568 467 ‘ASMZS 14001 for (2) ore ee

PAVEMENT LAYOUT PLAN
© Email; [email protected] NOOSAVILLE, QUEENSLAND

 

Page 3

 

Fec3"9 |"oal

 

[°""_4400-02-CE

3% RETAINING WALL. DESIGN

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3% 2.5% BY OTHERS
r REFER STRUCTURAL
Jf] | 0 _prawins rot Foe nerains
DATUM RL 14.0
alo alamslsls elelelele
DESIGN S| 3 SEL BIS Sess
yl 2 Sslslehels vhehehshs ee
S| & siggisies sass ini
EXISTING LEVEL 41 3 SERBS SERRE
a] a fslalakaks taht lake
= i
sls aleletalele. Ls
OFFSET o| = SRI S 3isieiel=
e| 3 mlcilols|s aa
ra TSS Rls hshs es} ay 1 \ t p {\
OPW
RETAINING WALL. DESIGN
p——28% BY OTHERS
REFER STRUCTURAL
DRAWING RO1FOR DETAILS
DATUM RL_14.0
‘a sie Im rales elelefs|~
DESIGN | 8) Siege) S&RRRE SRE
S| =| 2) elele Seeleleis Seles
3} gf slaise) — gigigigiis gleleile
EXISTING LEVEL m a 3] ARR FaIRIERIEA ea IS SINININ
<I el i sles elelelslels SSS
= 2
z sleekel geile alelele
OFFSET a =| 8] Res SSSI sees WM sx
eh ae vie mee a
DATUM RL_11,0
e walalinlesleste
CH 80.000 DESIGN g SERRE
FOOTPATH (TYPICAL) = SSS
| Yo RETAINING WALL. DESIGN | 2 }o0 JO | Jey
so am 8, AY GneRS EXISTING LEVEL & Sialic
REFER STRUCTURAL = SlElelsigie|
DRAWING RO1FOR DETAILS
e eleleleleln
OFFSET S| Alsen
me eed S| ahs ho fos foo
DATUM RL _15.0 Li :
| al sic lola] alate elelsele
DESIGN Ss} A] RRS] Blele| Sis SIR ele 2.5%,
s|_ S| isle elele| cele eieleiele J --"7
eo} sl siale elelo] alehe olla |r} DATUM RL_12.0
EXISTING LEVEL 8] &| SRE RIRIB| RiRiR Fees eo elclel_ tle
¥|_ 3 vise sisi] siele sisislsis) DESIGN eS SSS ERR
a] al see! lela ale a sieletsels
31S lo
OFFSET =| <I Sige Zee] SES ssBa4 ~ -lslelelsle
SL SLSR sie) isis slolslele EXISTING LEVEL & BRAS IS AIR
elo he
CH 60.000 OFFSET 3 SeeRee
S| att Ln |sc Joo lox
9 1b% 0.9% RETAINING WALL. DESIGN
25% 3% %o
5% 3% 2.5% BY OTAERS
REFER STRUCTURAL
LY DRAWING RO1FOR DETAILS RETAINING WALL. DESIGN
Po i -3% BY OTHERS.
a ~ d REFER STRUCTURAL
a ee ee tt hk ae = ef ee _--DRAWING ROT FOR DETAILS.
DATUM RL_16.0 Lo Ul DATUM RL_13.0
al al ck =ls & Is alee liahal aie sisleiaisisig| & ia
DESIGN 4) S| RRS Ss a S AISISISr| DESIGN BS SIR RIESE] S is
sl el eile Ses 2 Iz gelelele| Zee SEEREESL = Ss
=] 3) eels BlalS mA ZR\g| slslsiski Alele|s Rselseise|  & ie
EXISTING LEVEL =} 3| seis Paral 8 SIGS SS SS EXISTING LEVEL ae lS SBBRRRe| 8 SS
Se eo ehshe 2 Slee Sceee sheik ledledleded|etfed] ad len
S| 5) sein mlsls nos elelolole! TAhgho}e alsigielsis,
OFFSET Sl Pe Sas malls s Skis SIRREE OFFSET gine SRIRESEE 8 iS
LTS ae s ales lcs geese Teele. ores a eo
JISSUE| ISSUED FOR DATE | DRAWN | APPROVED [issue] ISSUED FOR: pate | pRAWN |APPRaven}°€S%NE: G MANSELL }oares 19/01/11 EN: rene ——W
1 | (SSUED FOR NFORMATION wawn| sm ORAS MANTERFIELD SCALE HOR 1:200, VER 1400 CIVIL DRAWING

 

H. TROON PTY. LTD. | PROPOSED BUNNINGS

auitotn-comencarano nour | WAREHOUSE
P.O, BOX 84, WENDOUREE, 3355

ISSUED FOR APPROVAL 206i] Si RYE ez SRETSTE ay TOM OROUF, ae
ISSUED FOR APPROVAL aroun] SM sete aeeneves 1315 sturt Street
0. TRIGG ‘A. BARHAM RPEQ 0829: Ballarat, VIC 3350
CONSTRUCTION SUE vareer] sm Ph. (03) 5330 8888 Tal: (03) 5339 7208 ~ (03) 5339 3622 EUMUNDI-NOOSA ROAD
pares 10/08/11 pate 10/08/11 wees tamarauip.com, Fax: (03) 5338 1310
ABN 11125 568 461 Email [email protected] NOOSAVILLE, QUEENSLAND

® COPYRIGHT 7.0.M GROUP PTY. LTD. ToH RE We ia

4400-02-CE

 

faRAWNG TICE

GATEWAY DRIVE CROSS SECTIONS

 

 

 

 

 

 

 

me

Ec3"9 |"04|

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 4

 

F"eca"9 ["04

 

["""_4400-02-CE

EXISTING WATER MAIN

MINIMUM COVER UNDER ROAD 1.2m

FOOTPATH (TYPICAL)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: CONTRACTOR TO ENSURE THAT ALL WATER MAINS HAVE A
MINIMUM OF 1.2m COVER UNDER ALL TRAFFICABLE AREAS.
WATER MAIN TO BE LOWERED IN AREAS THAT DO NOT HAVE THE
MINIMUM COVER

 

 

 

SUNSHINE CC (

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

© COPYRIGHT T.0.M GROUP PTY. LTD,

 

 

ABN. 11125 568 461

 

 

Email: [email protected]

NOOSAVILLE, QUEENSLAND

 

 

wes wx Po EM, 3% _—~ a Wie
DATUM RL _ 20.0 f |
elle oils wohahalelalclehs
DESIGN ERIK] SSlh alsiseiSislals
alsis| eels SIRIsISISISISIS RAVE?
e@lel—| all zlelerloolalazhake U
SSl=| SAR eleeisisiss
EXISTING LEVEL S[s\5] AIR ale\a\2\S/Sisi|s
SIS/8|_ Sis) SISIR/SISISISIS, L
Slalal Sele vllele LL eer ~
OFFSET Sele) Sie SsRisesisis
pale) Sli HIeIISSiRfele
ee) tials TT Selo le le
‘EXISTING WATER MAIN .
MINIMUM COVER UNDER ROAD 1.2m
_ 25% 3% > os
DATUM RL_ 20.0
el] =| ehels calla |e lala ralen|
DESIGN a8] 5) Sale Slr lma[alon les IS
sie} =| sisis Siete
SIS/8/SI8/8, AISISISISISISIS
aiglal siels sgisiisigiele
EXISTING LEVEL AALS] ign HRISIS(S\SiS
slo} s| slole sislelolelelele
8/§| 8) Sigs SISISISISISISIS
woo) hale I,
Als] Ss} ASSIS SIS|S |e ln foo lesley
OFFSET Ale} S] ASS ssisisielaigls
| TSF The PISI2 lai
TING WATER MAI . EXISTING WATER MAIN
EAGAN es UE MINIMUM COVER UNDER ROAD 1.2m
aif 2% 3%. 3% —— 15%
DATUM RL_ 20.0
alot] isle e|4]slo|slole 2] |02}.0 hole
DESIGN Se] sfetles ARRAS color fanlelehs
SIS/8| SIRS. SISISISISISIS, SISISISIAIS.
glale] els Ssisieisis clolalelsie
EXISTING LEVEL MS}e} Sola slelsiaiesle SElelsi[sis
=lels] sislo sisieleleisi= alelelelel
aIS|8] SIS/8 SISISIS/S/S|5 AISISISIS/S
olelel elele le
2\S|§] See alse 0000 00 [00 fin
=|s/s SlSlaleleloks SIBIRIRIS IS
OFFSET alels} SEE Sess SREB
nd hea hd nn Ha Sle (ele elele|sitie
EXISTING WATER MAIN EXISTING WATER MAIN
MINIMUM COVER UNDER ROAD 1.2m MINIMUM COVER UNDER ROAD 1.2m
Sy 2.8% — — 1
— a Ste 25% _——
DATUM RL_19.0 S L
SA] S| Siz R\slsls} Sisk SIFFS
DESIGN qq] a] I wejele] = slapo S| Stee
sls} 3] sislo slelsis| slels sislolsiolo
SIS] §| S/8I8. SIsisis_Sisis SISISIRIRIS.
is] 8) slz{8 SEK) vlsls seses
EXISTING LEVEL I] OL) O)elo wlajaje:) Sele sssisicin
SIS] 8 S/s/S SISISISL_ SISIK SISIS/SIS/S.
Se] 4] Sele mele) ester lelasles
OFFSET ae] e| eRe SERE| ZH acalale
et TL ai WTS] ale aise
j'ssue| ISSUEO FOR DATE | DRAWN | APPROVED |ISSUE| ISSUED FOR: pate | DRAWN | APPROVED) ESICNE: G MANSELL pate 19/00/11 ANS PRONE
101 | ISSUED FOR INFORMATION ssovn| SM. JORAWN: S, MANTERFIELO bsced HOR 1: 200, VER 1100 CIVIL DRAWING
of | sven fon AvPravAL anil ek Sey RTS ay TGM GROUP Pty Ltd H.. TROON, PTY; LTD: PROPOSED BUNNINGS :
Ballarat = canes
03 | 55UR0 Om APPROVAL anni] sm eee aero 1315 stur Street tiuptne-comencranonourma | WAREHOUSE
. TRIGG A. BARHAM REQ. 0829 ~ Ballarat VIC 3350 poreoesssiswenstunes) 2 EUMUNDI EAST CROSS SECTIONS
04 | CONSTRUCTION ISSUE yo/oe/ | SM. 3 3
Phi (02) 5330 8888 Tet: 03) $339 7208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD
pare 10/08/11 pare 10/08/11 Sle tena ep ey Fax: (03) 5338 1310

 

ToH REF We Re.

 

iz

4400-02-CE Ec4’9 |

 

04)

 

Page 5

 

 

g
=
3
=
g
zg
Z
=
s

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FOR CONSTRUCTION

 

 

RE

F*ecs"9 |"0s

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2
sg
cE e
a3 -
eo o
Z3 Ps oO n
Ze |2 © 2|| 8
z8 O ~ S
ze 5 j Z2|| &
3s 1 j £1} °
ey Eee 4 aes)
gale te a 2/| Oo
se 3 2]| w a
#555 x za os 19
SE55 © ° gs § a Cds
a ce > «2S ze LS
E ae #3 k> «(Of
fc : Se 4 Be Ei is
7 as = ; == z ie
[ p = |/ . ee
Be
| S|! SE o
El. ; | : Ss
4 Brat rat sre cerel| Gel Gl] SLL EL a <
| 67s el] Wze6i| zsr ZL Hn an
1961] S1F6L] SOFOL Oo 02
2 aw
Z <5
2 2S
5.0.
So aowow
rooz| Li6el| 00SZ] Teeei| eee 0052] S onset] Bevel] o0sz] © aie ét| S066] 0057 o®2-4
d weroz| S866] ovez] & A ievoz| ose! avez] S —Nos00z| 90661[ vez] S 6966L| U6 6 OVET west
veroe| ose 6! Sizz] tevozl enol Siez] fc osoroe] B066l[ Slzz] P 69661 ELI SLZ~] © noOas
l eee0z) 291 02| 0951] q gz 02| 81002] 0201] eioc| ore oot} = = orZzc
Weeeoz| yvoz| veri} 0 \7sz-0z| ozoroz| asst] gno7l 1er6l{ 9€60 002} 696i odo} = aWwan
eal-oz| o9-oz| veel] ~ soLoz| 920-02] nee] 96661] 98/61] 9220) £7002} OSL GH OLY Oo") oefso
onoz| 7002! ooo] - & z900z| 9661] 0000) C5 . SL66l| 01861] 000} W £20'0¢| cadol| VES "| | e£i50
7 os & Ele él] €81°6l| 769°0- - foo 22
09661| 88661] OLE9= zg & vu
o€0'0z|_196°61| 0S99= zg S7B61| 86661] O72 T- zg < of
o€or0z| Sol'0z| 092°9- fe SL6°6L| 82661] 0852 aS e 2 a
\ $3 Stel] Slé“6l] 069°L- Bs = Fl
a gz =o s g3
2 S aE 25 Sev6l| 82661 OFFI z 7 955 61 810°02| OSZ1- a?
/ a= oS Sorel] 9zo‘0z| ozs U- 8 / 929°61| 860°02) 06SL1- aa
a= 7 soz'6l] LS0°0z| 08 LI- ee / | 9296] 7eV0z/ OOL L- >i EE
= BE |x| 5 I 33
| Zoz 02] 94l"02/OSNEL- If ale él] €92-02|0S9'EL- [& VELel| L6E 0z|08z El 55 FI 799 61! LEE OZ|00e El- Be
“ - 23/7 oe Cuz 8
zr 04 srsI- 89861 ioe es pees ee | — beeen gsE uo:
SO BLS 02] BLS 0287S 91 iz gh
oO #,
© Bees
Fe
EX #aRG
S s 2 g e z 2 | aed
a =| a | a 7 a a
I = = os = = a —
z z z z
siz] 2]5 azlZ2]o = Z/5 Ze. 5
S| Go & wo S| o Ee at 2] & & By 4] & i i g
yale ,e2 Aale]2 Hal] 2] 2 Fale] e2 4
ws < ow atow x< wo aw x< wo 8 Ww < w
ale lsé fs ata [sis aals]s SaLe [3s] 6
Beigees
5G 8 B58
Fey 38
a 82054
8 2288:
§ Paces
s 2 | #83
&§ 2 e s
3 a
ze 22 g 25 Be
<8 Be 5 be } B=
23 gs a ge J z
ge | Ze ) i s Owe] Woe Ev wt 2) | §
gs ge 2 < corel] Terci| 6LrSL s Gol el} SLg'Bi} E791 S| | &
ce | - : ae al 7 95x 61{ Zorsi{ 6LL 71 ( €Si6l} 7S2'6l} €79°71 S|) Ske
aE Lleol] LLe'6l| L902 7 aigel| cof el] 6/7 EL Esl 6l| 272'6if €€S 71 g/8| | 2 5] «
—{___ ff exs'etl sone] see'at \ algel] 777 61) 691 EL €89°61) 082°61] 61°71 }s/_| = |§] =
Harv ell L076] O92 y ez7el| 62761 957-21 a7s6r] ozo6ll 6ze2 s/2/z| = |s] z
TP eeret] 261) o00'2t vest] Ber ell ELOZL ele =
| 4 Eile ie] &
So \ S 2 é
S zooo2| ooo] SSE] S z/& A
eerel| Lorél| 00sz Bol 6l| Teel] 00SZ aseél| 866i] oosz| = zsi-0z{ 1ooz| eee] Z/E| | g |e] ©
E661 TLL 6l| OVEZ 766] Ee 6l| OVE z goo] ce66i| OrEZ] DP zsroe] wooe] eee] ZS z/=| | = /8
2 E661] LUL6l| SLZZ sveei| E€e6l| SLZz x Booz! 68661 SLzz sali] o/s
ml o a is |e |e la
i“ aseel| Orel OOOO] S eles] e002] 000] S q eeoal| esooz] coro] Tose] zoe] oot G Bile le
= E661 L6L'6l| SiZZ-] areal O66! SiZZ-| S&S a g00'0z| aszoz| Sizz- Bp | [ale is
| e661] B61 | OVEZ-| areel| 6e6'61[ OVE Z-] Tl 800°0z| 6Sz'0z| O07 Z- ZSV'02} 612-02} S66'2- &
ell! 00s elf 00S2-| 86L 61] 9€66L] 00SZ-| co 7 8861] 29z0z| 00S7- a SLO eS 2
x x= | 5
es Lt e é
\ se
20S 61| €€0°02| OOF T= zs] ol0z| OOF = z Zest] 96861] OOF TL =2
L161 7$0°02|0"70°Z1- zoS6t| z0z|on0 ZL = 79°61] 216 61|070 21 Bs zzreil se0'0z|ossZ1-
al | LLS°61] 090°02| OSI-Zl- 76561 zi Oz] Ost Zi 2 79°61 £6661] 0SL-ZL- 53 Zoli 20'02[068'21-| 7
2 1 nye! 9€z-OlOSTEL- DEF] Elz O2[OSFEL-| =e 661 Ler Oz|OS9"EI-| 25 | este) [ere OE |eDeh g
ze) 2 2 = 7 Be ss E861] 761'0z/00S 1- 2
26 | 99 61] 16€0Z/0S9'Si- 089°6t] 69€0Z]0S9°S1- =: } OL GL} 942°02]059'S1- 22/3
=> BET 02] BET OZEZT IL : 827 02| 827 0z|86E SL- ge NE OZ TEL 72°91] = 886i] €59°0z|00S'91=
es Ze : 1e9"0z| 189"0z[ooe Zi-
S6 2z/ |
25 ge
aE 82) 7
S| = i i cal 5
| a s 2 a & a 2 3Jalalalals
w w w “il a ST
al = J = J = | = #/E/S/E/5/5
2}. = a 2 g a 2], Spee EIS 15
J S/6 | & 5/5] & JSlE]E 33/2] &
Aale|e Aaje|e Aal}e|]2 Aayje|2
ala |S] s6 aLe |S] Ss as [ss aLa |] s 1s
s0,,] 6,893... 39°20-007F ..]

 

Page 6

 

Fece’9 |"oal

 

["""_4400-02-CE

 

 

 

 

    

 

  
  
 
    
 
 
 
    
   
   
 
          

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

         
        
      
   
   
  
  
 
  
  
  
   
  
  
  
   
 
  
   
  
  
  
  
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
  
   
  
   
     
 

 

 

 

  

 

 

 

 

 

   

 

 

 

    

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PT No. EASTING NORTHING = RL PT No. EASTING NORTHING RL PT No. EASTING NORTHING = RL PT No. EASTING NORTHING = RL PT No. EASTING NORTHING RL PT No. EASTING NORTHING RL
al 4958.1 1080.13 1156 a 4767.80 912.84 ME. a 4827.69 932.68 Kt 4854.86 1097.26 ME ur 485367 1028.17 16.358 Mm 4937.63 969.69 20.40
22 4857.27 1068.09 11.89 2 i795 913.82 ME. ® @ 4827.30 931.46 k2 4854.23 1096.39 ME. 2 4853.17 1028.84 16.52 M2 4943.56 970.87 20.45
3 4856.40 1056.05 12.66 B 479050 eet ME. ® B 4828.65 930,86 3 4853.18 1096.58 ME. B 4856.63 1029.00 1487 "8 4949.49 969.69 20.45
Ab 4957.19 1043.80 13.33 & iubote 918.9 19.95 @ Gs 4839.25 933.39 ke 485193 109842 ME. La 4957.26 4027.34 14.88 Me 4954.52 966.33 20.61
aS 486128 103221 16,53 5S 1813.19 916.78 19.84 ® os 4850.05, 935.91 KS 485159 1100.61 ME. is 485936 1024.86 18.18 MS 4957.88 96130 20.59
AG 4868.34 1022.16 15.16 £6 182456 911.76 19.68 © 66 4950.77 936.57 K6 495195 1105.48 ME. Ls 4864.65 1017.63 16.02 M6 4959.06 985.37 20.66
ar 4877.85 1016.39 16.98 0 2035.89 91875 19:58 ge} f® a 485058 93753 KT 4952.04 106.96 ME. ur oa7.09 011.40 16.86 “7 4957.88 949.43 20.65
48 4889.11 1009.49 11:96 es 403943 aie 1855 Seams FA AB RIADEE @ TEED E ks 4952.19 1108.19 ME. le 4878.49 1006.36 17.61 Me 4954.52 964.61 20.55
1) 4901.28 1007.81 18.52 9 1842.96 919.62 19°53 © em ® SETOUT CO-ORDINATES & LEVELS K9 4852.49 1109.40 ME. uw 4886.65 1002.65 18.19 M9 4949.49 941.05 20.51
At 4920.22 1007.81 18.86 E10 4846.67 920.25 1952 © WOTESETOUTPONTEARETDLICGR Ee’ SSS k10 4954.53 1115.86 ME. uo 489531 1000.38 18.59 M10 494356 939.87 20.69
ant 492858 1006.70 19.00 ett 484995 92100 1953 © Kitt 4955.19 116.27 ME. ut 4904.24 999.61 18.83, min 4937.63 941.05 20.48
an 493637 1003.44 19.14 e2 488315 92175 1953 {© Kz 4955.70 1115.68 ME. U2 4916.67 999.61 19.83 Miz 4932.60 966.61 20.51
AB 4943.03 998.26 19.28 £3 Gaies <a71b faley O@ PT No. EASTING NORTHING — RL KB 4855.70 4912.57 ME. LB 4923.09 998.73 19.30 MB 4929.24 949.63 20.44
Ath 4948.10 99152 19.42 et aes bss wa uu Kth 4855.64, 1108.90 ME. Le 4929.26 996.16 19.47 mi 4928.06 955.37 20.40
ANS 4950.21 987.78 19.66 Bs 2813.33 a0 et 49.68 > HI 4855.03, 944.34 ME. KIS 4855.44 1105.23 ME. us 4934.50 992.06 19.63, Mis 4929.26 96130 20.44
AN6 4954.68 983.19 20.11 } Y H2 4862.35, 940.27 19.68 6 493852 986.73 19.80 Mi6 4932.60 966.33 20.33
At 496083 oeus2 20.20 A ee aot r 18 e701 94086 9.47 SETOUT CO-ORDINATES & LEVELS | uv 4930.41 905.15 9.85
ate 4968.28 981.72 20.28 a 4786.23 906.31 He aeszal ete as NOTE: SETOUT POINTS ARE TO LIP OF KERB ue eauone $038 yee SETOUT CO-ORDINATES & LEVELS
Ang 497564 902.93 2001 i Tras seas > HS 4893.83 947.44 19.59 uy 4960.1 983.42 19.89 |i asec eaNFRONISGSARESEGALIRLGEAEEN aaa
20 4982.79 985.03 20.59 £20 4768.42 905.26 ME. x= H6 4899.51 949,53 19.65 L20 4939.65 983.09 19.91 : ae
R21 4989.64 988.00 20.78 = HT 4904.82 952.64 19.73 Br WoaERSTNG MORTEING] JRL lt 4932.15 980.93 19.96 S| HIN E JAST Rt
. H8 4909.65, 956.10 19.83 jo. EA I 4 976,79 19 anne .
a mst, 58502 SETOUT CO-ORDINATES & LEVELS. a waa sees (usage S180 . FP
Arb 5022.66 1006.65 20.63 NOTE: SETOUT POINTS ARE TO LIP OF KERB <x H10 4917.47 967.20 19.81 if atts) i026 . 126 492392 97130 19.80 f
42S 5033.38, 4010.21 HN 491797 974,86 19.61 i diets mode : L235 492127 983.72 19.57
A 5040.08 1013.49 PT No. EASTING NORTHING = RL Oo HI2 4915.31 982.02 19.35 18 48s097 00172 S 26 4916.98 989.17 19.36
HB 4909.94 987.48 10.96 Ne desoae jens = 27 490137 993,26 19.11 Opw itui3
SETOUT CO-ORDINATES & LEVELS | pr 4767.94 91119 i. Ate, sont 18.54 NS 484959 1002.80 . Le 4904.86 995.66 18.89 VWorba A
eee . HIS 488991 993.62 18.25, a 86969 100357 29 4891.03 998.70 18.42
NOTE: SETOUT POINTS ARE TO LIP OF KERB Fa 4779.51 512.16 N ; ‘
a ie fen Hi6 4883.85, 995.29 17.96 "7 188243 400787 : Bo 4983.18 100106 18.01
fy caailee tas HI7 4878.00 997.59 17.58 Ne peciaig jot : ur 4875.71 1004.57 1142 y
PT No. EASTING NORTHING RL Fs Laas Bay HIB 4872.42 1000.50 11.18 NO 185648 so178 - L32 4868.97 1009.15 16.72
i ieet ana 37 H19 4967.17 1003.97 16.76 ie estat 10120 z LB 4862.93 1014.69 16.00
ssi seen, try ists wo wesnge esis i uaseze es 3k uesias rion
82 5098.96 103151 Fo 4814.92 91387 19.88 i Ni 485858 101130 -
83 5083.99 1024.23 By Tete Bee 1986 i ssst pa ie NB 4858.90 ‘104 : SETOUT CO-ORDINATES & LEVELS
% EC fro 930.70 oes2 1983 s ie Ne 495650 1009.56 - NOTE: SETOUT POINTS ARE TO LIP OF KERB g
Ft 4832.37 916.88 19.83 NS 4857.77 1008.89 -
a 50390900238 i ee) Ba SETOUT CO-ORDINATES & LEVELS wie 8570s ®
87 5024.12 995.12 FB 487396 926.61 19:79 NOTE: SETOUT POINTS ARE TO LIP OF KERB
38 sonst 989.95 Ft 4894.72 93148 19.89 SETOUT CO-ORDINATES & LEVELS
a pie labaed cs Ree! eae ay NOTE: SETOUT POINTS ARE TO LIP OF KERB
Bio 4993.68 979.73 Fé 4920.76 937.38 20.15
Bu 4987.21 976.86 FT 4926.07 938,03 20.21
Biz 4980.48 974.66 FAB 4926.92 938.67 20.22
BB 4973.56 9738 Fg 4926.71 939.11 20.23
Bue 4966.52 972.35 F20 4923.14 946,78 20.26
Li 496167 972.06 Fat 492106 950.62 20.25
Bis 4960.8 oka Faz 4920.35, 95138 20.26
Bn 4960.98 970.39 F23 4919.21 950.95 20.22
Bre 4964.20 965.53 F24 4913.81 945.99 20.13
on 4966.09 960.01 F25 4907.75, 961.86 20.03,
820 4966.83 989.24 F26 4901.16 938.67 19.95
B21 4567.86 959.58 F27 4894.14 936.48 19,88
B22 4972.29 963.99 F28 4878.41 932.79 19.83
823 497755 967.39 F29 4862.68 929.11 19.80
B24 498896. S736 F30 4846.96 925.43 19.78
825 $000.34 978.92 BI 4931.23 921.75, 19.81
826 S174 984.69 F32 4829.12 921.42 19.81
827 5025.8 9918 F33 4828.20 921.15 19.82
528 5040.48 599.45 F34 4816.17 918.81 19.88
B29 5085.15 1007.09 F35 4197.44 916.49 19.95
830 5069.83 104.76 F36 4782.57 915.25 20.02
B31 5084.50 1022.38 F37 4767.1 916,01 20.08 J
832 5099.17 1030.03 oe
syste ns SETOUT CO-ORDINATES & LEVELS 4
SETOUT CO-ORDINATES & LEVELS ‘ote serour points ae To LIP OF KERB =
NOTE: SETOUT PONTS ARE TO LIP OF KERB = PT No. EASTING NORTHING = RL
PT No. EASTING NORTHING = RL pt " 486165 995.73 Me.
< R 4844.52 100387 15.46
a $007.67 972.69 20.95 oO 3 yenee Hoes aa
a Hole Mahl pies M 485159 1016.68 1.17
a 499451 964.98 20.65 a P pe inzaee eas
G 4987.93 961.13 20.46 - ie seh1 82 ieee batts
Gs 498135, 987.28 20.27 ro id aes ae ee
7 4977.56 954,38 20.20 ‘
a 4974.60 950.64 20.17 B eens Mee eye.
a 4973,00 968.01 20.13,
© ——bse998 25 SETOUT CO-ORDINATES & LEVELS
10 4968.75 933.96 ed PT No. EASTING NORTHING = RL NOTE: SETOUT POINTS ARE TO LIP OF KERB
at 4969.37 926.59 ©
cre 4971.80 519.60 ey oO 4965.06 92159 - PT No. EASTING NORTHING = RL
SETOUT CO-ORDINATES & LEVELS eae
2h ene eee 03 4963.97 92107 - yn 4848.25 1053.82 Me
NOTE: SETOUT POINTS ARE TO LIP OF KERB 6 980,60 925.63 - 2 4848.30 1054.28 ME.
a pe fe e i 2 B 4848.44 1054.73 ME.
- J 4851.08 1061.16 ME.
OF eels ane, Is 4851.78 106152 Me.
08 ene aus . J 4852.26 1060.89 ME.
09 bisdged 933.57 - a 4852.07 1058.64 ME.
010 4962.43 933.73 - 38 4852.01 1058.25 ME.
2 on 4962.76 932.95 - 9 4851.89 1057.87 Me.
LS ore S268 927.32 . 10 4849.38 1051.75 ME.
© ‘4. O13 4966.22 $26.62 at 4848.70 105139 Me.
€: PEDESTRIAN RAMPS TO BE CONSTRUCTED AT A GRADE OF 1 in 14 AND PROVIDED Jia 4848.22 105199 ME.
WITH BLACK COLOURED WARNING TACTILES (300x300x40 CONCRETE PAVER) CAST ss SETOUT CO-ORDINATES & LEVELS
TO TIE RA CECE (ENERATLY ston SERIO TSR ge “A NOTE: SETOUT PONTS ARE TO LIP OF KERB SETOUT CO-ORDINATES & LEVELS
CONE TRUCTED AT ROAD SURFACE LEVEL NOTE: SETOUT POINTS ARE TO LIP OF KERB
[sue TSSUED FoR ‘DATE [ORAWN | APPROVED ]SSLE ISSUED FOR DATE [ORAWN |APPROVED[ES™EDG MANSELL OE 49701711 cer FRORTT ———— 7
01 | ISSUED FOR INFORMATION wow] sé DRAWS. MANTERFIELD SALE 4500 CIVIL DRAWING
roel esan favaprya. neuer sh aa FETT gy aM GROUP Pty Lid H. TROON PTY. LTD. PROPOSED BUNNINGS [A
ara ALUMINIUM AND STEEL FABRICATORS i
02 | 55UED 0m APPROVAL anism eos ere 1315 sur treet suuens-comeenciananonousrma. | WAREHOUSE
weer = ES b Tee A eanvan mPa ENEISS sagt a Ende KERB SETOUT CO-ORDINATES
su Phi (03) $330 8888 Tet; (03) 5339 7208 - (03) 5339 3672 EUMUNDI-NOOSA ROAD
pare one web: tamgroup.c Fax. (03) $338 130 AND LEVELS
0708s 10/08/11 eb: tamgroup.com ax: (03)
ABN. 11125 568 451
Email: [email protected] NOOSAVILLE, QUEENSLAND
( c )) COPYRIGHT T.0.M GROUP PTY. LTD. fie REE 4400-02-CE ["Ecs a 9 [" 04!

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 7

 

 

   

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N
S|
o
hh
Oo}
| U)
Ww
9
N
&.
2
g
3 ony, .
fe “ae Sui
EE | ~~ OUNon GNUIL
STORMWATEREHT-EP6 ‘K PAR i iva
CH 53|76m
yen RL. 17/64m Pe
ARIA 0)
N\ (
Lo os el —|
ee a
y Se TEREP2-EP7
VERT RL. YQ44m
Sy N
N\
Se
7S
y
pP—
1p ELEV = 18.2617 STA =83.00 IP ELEY = 12.05IP| STA =150.)0 ae,
GRADE CHANGE = -0.32
| =4.79 Kk 454
30m N.C Som N.C
-4.0% =3.3% 1.6%
DATUM 10.00
CUT + 3 al z |g al ea a 3 3 4 o a 3 a
FILL - 9 | 2] a 4 ai a aT 44 4 ql qi q 3 a
DESIGN TOP OF KERB a 2 al ag ye
(LEFT SIDE) | ES =| = 4 2 2
DESIGN PAVEMENT a a wg as ad a al 4 dl al a 3 2
LEVEL - CENTRELINE & | Ej s s 2 4 3 z= | a] 2 a =
DESIGN TOP OF KERB J a de ado aa a l a
(RIGHT SIDE) | 2 | 4} x a 4 =|
EXISTING SURFACE al a z aa a alg a gl - I a a 4
LEVEL g| | x x 4 4 4 a4 gq 4 S| q = = E|
LONGITUDINAL SECTION GATEWAY
HORIZONTAL SCALE 1:500
VERTICAL SCALE 1:50
FOR CONSTRUCTION
[issue] ISSUED FOR pare Jorawn | approveoissue| 1SSUED FOR pare |oRAWN | APPROVED }OESICND” G. MANSELL DATES 19/0111 ee Peels
01 | ISSUED FOR INFORMATION aun] sé. PRAWNS. MANTERFIELO SCALE HOR 1: 500, VER 1:50 CIVIL DRAWING
SS ee omanlt ces rae TTT gy = TGM GROUP Pty Ltd : H. TROON PTY. LTD. PROPOSED BUNNINGS Le
aallarat [ALUM AND STEEL FABRICATORS
Panes Pm ear ts alas co neato | WAREHOUSE GATEWAY DRIVE LONGITUDINAL
P.O, BOX 84, WENDOUREE, 3355
bh: (03) 5330 8888 Te (09) 53392208 ~ (03) 5339 3622 EUMUNDI-NOOSA ROAD SECTION
pare so v0a/1t DAT ro/08/t gerne cem Fax: (03) 5338 1310
ne Foal trie eM cee NOOSAVILLE, QUEENSLAND
© sorrnionr ra. onour ery ro, TAI 79 90-02-CE F"ec7"9 [02

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 8

 

Feces" 9 |"02

 

[°""_4400-02-CE

  

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

/\
YY
wt
DATUM 11.00 wi
one Tone? Tiaencr aun Tek BD

BBE ize ANE GRADE sa boss cage nan | samen in Bae UR ane te

DEPTH TO INVERT aie “- “P = 38 a

DESIGN INVERT LEVEL af er 3 a8 g

DESIGN SURFACE LEVEL ® 3 3 ql 5 3 3

CHAINAGE & LENGTH e Py Range eu ls a & a

FOR CONSTRUCTION

|/SSUE| ISSUED FOR DATE | DRAWN | APPROVED |ISSUE| ISSUED FOR. pate |oRAWN |APPRoveD] SIGNED: G MANSELL ares 19/01/11 CLIENT: renee ee arf
o CIVIL DRAWING 0

 

 

‘CONSTRUCTION ISSUE woven] SH

 

ISSUED FOR APPROVAL zeros] si. PRAWN. Ss. MANTERFIELD SAME _HOR 1: 500, VER 1:50
ET TET OE =—. TOM GROUP Pty Ltd . H. TROON PTY. LTD. | PROPOSED BUNNINGS
Sea

ft
panes aes tats surest aaa cree eam | WAREHOUSE
Eu D L SECTI
oO EUMUNDI-NOOSA ROAD oii eeeeee nian

0. TRIG ‘A. BARHAM RPEQ 0829 Ballarat, VIC 3350,
Fax: (03) 5338 1310

oe ova87n TGM Aan iN Tze 368 461 Email freon@el con au NOOSAVILLE, QUEENSLAND ae oan 7
© tePemontv. anoue er... “ 4400-02-CE Ecs 9 | 02

 

 

 

 

pave: 10/08/11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 9

 

NOTE: THE CONSTRUCTION CONTRACTOR IS TO ENSURE THAT ALL EXISTING
STREET SIGNS THAT ARE AFFECTED BY THE EXTERNAL WORKS ARE
TO RE-INSTALLED IN ACCORDANCE WITH COUNCIL ENGINEERING
CONSTRUCTION OFFICER

 

 

 

 

NOTE: ALL PROPOSED PATHWAYS ARE 2.0m WIDE AND ARE LOCATED 1.85m
FROM BACK OF PROPOSED KERB UNLESS NOTED OTHERWISE,
REFER SHEETS EC3-ECS FOR CROSS SECTIONS.

 

 

 

T REGIONAL COUNCIL

 

PS F a Ay =

NOTE: ALL LINEMARKING & RAISED REFLECTIVE PAVEMENT MARKING SHALL i a OVE D
BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC
REFER SCRC STANDARD & MUTCD FOR ACTUAL POSITION OF SIGNS SUA 3 4 g AUG 2011

4400-02-CE

 

 

 

 

 

PROPOSED COLOURED (GREEN)

BIKE LANE ~ 35m MINIMUM

LENGTH FROM INTERSECTION
PROPOSED COLOURED (GREEN)
BIKE LANE - 40m MINIMUM
LENGTH FROM

 

PROPOSED COLOURED (GREEN)
BIKE LANE - 85m MINIMUM
LENGTH FROM INTERSECTION

PROPOSED COLOURED

BIKE LANE - 55m

LENGTH CTION
e

S

a

OLD GATEWAY DRIVE

PROPOSED COLOURED (GREEN)
BIKE LANE ~ 40m MINIMUM

LENGTH FROM INTERSECTION LEGEND - PROPOSED WORKS.

DESIGN KERB & CHANNEL

 

EXTENT OF PROPOSED FOOTPATH

EXTENT OF ASPHALT PAVEMENT TO BE
CONFIRMED WITH CBR & EXISTING
PAVEMENT TESTING

PROPOSED COLOURED (GREEN)
BIKE LANE ~ 35m MINIMUM
BTN eee EXTENT OF BIKE LANE LINEMARKING

LINEMARKING

PROPOSED COLOURED (GREEN)
BIKE LANE ~ 40m MINIMUM
LENGTH FROM INTERSECTION

 

FOR CONSTRUCTION

ISSUED FOR: DATE | DRAWN ISSUED FOR: DATE | DRAWN | APPROVED) G. MANSELL 19/0/11 nS Soak umes 4
'S. MANTERFIELD +500 CIVIL DRAWING 0
ae ania : at oncrovrewis gaye | H. TROON PTY. LTD. | PROPOSED BUNNINGS ee
yt ida ie wal aac
2 [orsmeron aera Dae sana en oH umm = ORUNE obs RRGAD PROPOSED LINEMARKING AND
30 8 Fel: - Saw
on, aa Tet: (03) 5339 2208 - (03) $339 3622 DIMENSION PLAN

aa esse ACT a Er eon NOOSAVILLE, QUEENSLAND
© COPYRIOHT T.0.M GROUP PTY. LTD. , ‘ E

 

 

 

 

Used in these records

About this file

File size
6.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Amended Plans.pdf · 6.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.