Council archive · source document
Approved Amended Plans · OPW11/0131
Plans and drawings: the text below has words only, no drawings.
NOTE: THE CONSTRUCTION CONTRACTOR IS TO BE AWARE OF AND ALSO
IMPLEMENT ALL RELEVANT PROCEDURES IN ACCORDANCE WITH
‘SUNSHINE COAST COUNCIL DEVELOPMENT APPROVAL DETAILS.
a. / . Metal storage sheds
NOTE: THE TOTAL REQUIRED PAVEMENT THICKNESS MUST BE BASEO ON THE DEPARTMENT OF MAIN ROAD'S PAVEMENT | }
DESIGN MANUAL USING SOAKED CBR TESTS OF THE SUBGRADE,
THE DESIGN PAVEMENT THICKNESS, TOGETHER WITH CBR TEST RESULTS MUST BE SUBMITTED TO COUNCIL'S CHIEF
EXECUTIVE OFFICER (CEO) FOR APPROVAL BRR TO PLACEMENT OF PAVEMENT MATERIAL.
RP222164
11g731 +9 AUG 201 2
MATCH EXISTING PAVEMENT LEVEL & J
2
: “ SP131406
FOOTPATH FOR INTERNAL !
ACCESS TO BUNNINGS i
Ce a J 7 TAY wet storage sheds
NOTE: THE LOCATION OF UNDERGROUND SERVICES SHOWN ARE < i: SIDE ENTRY PITS TO BE MODIFIED. 2941687 i a4
INDICATIVE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR “1 // MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL / Ss /
CONTACTING ALL AUTHORITIES TO DETERMINE THE LOCATION OF : \\\
UNDERGROUND SERVICES PRIOR TO THE COMMENCEMENT OF
/ rX\ / . 1
CONSTRUCTION WORK. ANY CLASH OF WORKS WITH A SERVICE IS f i} _-pROPO BUNNING: SITE /
TO GE REPORTED TO THE ENGINEER IMMEDIATELY, THE a Mi]
RP135064
{ pA
CONTRACTOR SHALL ENSURE THAT ALL SERVICES ARE FULLY ee Hi
PROTECTED DURING CONSTRUCTION, ANY SERVICES DAMAGED
CURING CONSTRUCTION SHALL BE REPAIRED AT THE
\\\\\ 7/7 RETAINING WALL IRW1), DESIGN BY OTHERS. .
CONTRACTORS EXPENSE, ay 7 / REFER STRUCTURAL DRAWING 4400-01 RO1 FOR DETAIL
/
Se oe?
| KERB T. 0 MATCH
PERIMETER FENCING TO BE INSTALLED ADJACENT TO RWI. THE | TO EXTENT OF WORKS
FENCE IS TO BE INSTALLED ALONG ENTIRE LENGTH OF RW1T0 THE | a
TISFACTION OF SUNSHINE COAST COUNCIL ENGINEER AND IN
ACCORDANCE WITH THE ENDORSED ARCHITECTURAL DRAWINGS
SERVICE AUTHORITY GUIDELINES. SP114181 f
CONTRACTOR TO NOTIFY THE SERVICE AUTHORITIES PRIOR TO
ANY WORKS COMMENCING
NOTE: ANY SERVICE THAT NEEDS TO BE ALTERED AS PART OF THE NEW 308
ROADWORKS SHOULD BE DONE SO IN ACCORDANCE WITH THE
NEW FOOTPATH TO
& XK
w\ N71
MATCH EXISTING :
NOTE: REFER SHEET EC9 FOR SIGNAGE AND LINEMARKING DETAILS.
5 KERB TO MEDIAN TO MATCH
F 2 REXISTING
g 0
NOTE: CONTRACTOR TO ENSURE THAT ALL WATER MAINS HAVE A A BUP13364
MINIMUM OF 1.2m COVER UNDER ALL TRAFFICABLE AREAS. 3 e
WATER MAIN TO BE LOWERED IN AREAS THAT DO NOT HAVE THE J
/ (
MINIMUM COVER fc
NOTE: ISOLATION VALVES TO BE INSTALLED ON EXISTING WATER MAINS, ff
POSITIONS OF ISOLATION VALVES TO BE LOCATED EITHER SIDE OF PROPOSED
ROUNDABOUT. FINAL POSITION TO BE CO-ORDINATED WITH SUNSHINE COAST
COUNCIL ENGINEER, UNITY WATER AND CONTRACTOR ON SITE
“MATCH PAVEMENT
LEVEL & GEOMETRY
3 EXISTING PAVEMENT ALONG 7
VEGETATION CLEAR ZONE FROM OVERHEAD POWER LINES, / EDGE: OE NEN RENE ts nr103723
LIMIT TREE REMOVAL IN ACCORDANCE WITH COUNCIL . S 1
INSPECTION AND IN PRINCIPAL AGREEMENT FROM SITE
MEETING ON 22/06/11
BUP 13364
RP131576
EXISTING SIDE ENTRY PIT TO BE MODIFIED.
MODIFY PIT LID LEVEL TO MATCH NEW KERB LEVEL
DESIGN KERB & CHANNEL
KERB & CHANNEL TO BE REMOVED
22 KERB & CHANNEL TO BE REMAIN
PAD SUITABLE FOR A BESSY rusia
COUNCIL VEHICLE, REFER LANDSCAPE aeemare; fates
506 . o/_ARHITECTS DRAWINGS FOR LOCATION. EXTENT OF PROPOSED ‘ATH PLLA
i KERB ISLAND power
SP114181 < 0, BE REMOVED EXTENT OF T PAVEMENT TO BE
C CBR & EXISTING
4 P, TESTING
RELOCATED WATER MAIN (IN ACCORDANCE sewer FRE
EXISTING KERB WITH INDICATIVE UNITYWATER PLAN) - To BE © MANHOLE r © HyoRANT
EL) CONFIRMED WITH UNITY WATER cm INSPECTION @ SHRUB water
PENG ae
TRAFFIC Crd
Wir & Ret + souuaro
sion STA a RE
wp ggcTciry —eustRA
mT Pr
astra ©
Aa
o Teisiza = i
coi ts
ea + AME @ TP
© gscrncry me VATER
BARE sage VALVE
EXTENT OF BIKE LANE LINEMARKING
LINEMARKING
——€ swwiecr or sounoany
: hoe tastone
NDI ROEREADUND POWER BLE
EUM 910 ‘ 2 —— one
RP150347
sewer tine
RP150347 ————— _ STORMWATER LINE
EXTENT OF PAVEMENT WORKS
19
TRANSITION NEW KERB i 3
ALIGNMENT TO MATCH 7 RP150347
EXISTING ALIGNMENT, 3 902
2
7 \ AP150547
BRP 150345
PAVING
TSSUEO FOR DATE | ORAWN ISSUED FOR ‘DATE [DRAWN [APPROVED G. MANSELL s/o
ISSUED FOR INFORMATION sro] SM, PRAWNS. MANTERFIELD SALE 4500
ERG ALIGNMENT MODIFIED, Issue To ENERGEX [08/04/11] SH
CIVIL DRAWING 0
aa SETHE TGM GROUP Pty Ltd H. TROON PTY. LTD. PROPOSED BUNNINGS SS
les Viacein au telat
(KERB ALIGNMENT MODIFIED, RE-ISSUED TO ENERGEX | 20/04/11] SM. ee lita 1315 Sturt Street
0. TRIGG A. BARHAM RPEQ.
Te PS a
sat eercucaacm | WAREHOUSE
sae
en Fw APPROVAL inn SH
PROPOSED ROUNDABOUT
Ph: (03) $330 8888 2051 Fs) so "70e = 0) 9309 3622 EUMUNDI-NOOSA ROAD
10/08/11 pare 10/08/11 aWeb: tamgroun. comm ow ASAZS a0
CONSTRUCTION ISSUE wren] sé
ABN. 11125 568 467 ‘ASMZS 14001 for (2) ore ee
PAVEMENT LAYOUT PLAN
© Email; [email protected] NOOSAVILLE, QUEENSLAND
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Amended PlansRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.