Decision Notice - Minor Change - MCU21 0228 01 & OPW21 0364 01 [As Published] · MCU21/0228.01

of 17

Text shows just the words. Original shows the document exactly as it was published.

                      a.      meet the requirements of council’s relevant Planning Scheme Policy for performance
                              and uncompleted works.
                      b.      be calculated using a schedule of works and relevant bond equation
                      c.      have approval of the bond calculations and amount from Council prior to lodgement
                      d.      be requested for release by writing to Council, when relevant approval requirements
                              have been met.
               As Constructed Plans and ADAC XML Files (Council)
               79. Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory
                    “As-Constructed” records must be submitted to Council. The bundle of “As Constructed”
                    information shall include:
                      a.      As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing
                              file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the
                              accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and;
                      b.      ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed)
                              prepared in accordance with industry standards and recorded in “MGA - UTM56 /
                              GDA94” projection.
                                       Please Note: Further information and advice relating to the as-constructed
                                       drawing presentation, as-constructed survey capture and associated guidelines
                                       for preparation of a compliant ADAC XML digital file are available on the webpage
                                       titled “As Constructed Guidelines” and accessible at the Noosa Council Website:
                                       Planning & Development / Development Tools & Guidelines / As-Constructed
                                       Guidelines.
                      c.      The “As-Constructed” drawings will require certification by a:
                              i.       Qualified experienced Civil Engineer (RPEQ) confirming design intent and
                                       conformance with applicable standards and specifications, along with the
                                       relevant descriptions of assets, services and structures and;
                              ii.      Licensed Surveyor in regard to the cadastral and locational information, levels
                                       and applicable survey datum.
                      d.      The data must be in accordance with Council’s “Planning Scheme Policy 6 –
                              Engineering Design Standards”, and fully detail the levels for all engineering works
                              including but not limited to the drainage network and structures, finished ground and
                              pavement surface levels.
                      On Maintenance
               80.    All municipal works must be accepted ‘On Maintenance’ by Council in accordance
                      with Council’s relevant Planning Scheme Policy prior to the commencement of the
                      use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council:
                      a.      certification that all works have been undertaken and completed in accordance with the
                              requirements of this Permit
                      b.      as Constructed details in accordance with Council’s Planning Scheme Policy
                      c.      maintenance and operational manuals for all proprietary or site specific devices
                      Off Maintenance
               81.    Prior to requesting an Off Maintenance inspection the developer must provide a written
                      request for the Off Maintenance inspection.
               82.    A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
                      where:
                      a.      a Council inspection reveals works do not comply with approval requirements



                                                                                                         Page 12 of 17
Document Set ID: 22822522
Version: 4, Version Date: 21/02/2024

Used in these records

About this file

File size
202 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Minor Change - MCU21 0228 01 & OPW21 0364 01 [As Published].pdf · 202 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.