b. submitted certification falsely states works comply with approval requirements.
83. A final inspection and approval of the new works and any completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.
5. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence SARA at DILGP SARA Schedule 10, Part 4, The agency provided its
at DILGP Via MyDAS2 Division 3, Table 1, Item response on 20
at http://prod2.dev- 1 (10.4.3.1.1) - January 2022
assess.qld.gov.au/suite Contaminated land (Reference No. 2201-
/ (for assistance, (unexploded ordnance) 26787 SRA). A copy of
contact DILGP at 5352 (Planning Regulation the response is
9702 or 2017) attached
email:[email protected] )
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
General Advisory Notes
1. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
2. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
3. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Preparation of a Preliminary Construction Management Plan
5. A Construction Management Plan must be submitted to Council at least 5 business days
prior to the pre-start meeting. The plan must address the following:
c. traffic management during all aspects of the construction phase including:
iii. a Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction
Page 13 of 17
Document Set ID: 22822522
Version: 4, Version Date: 21/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Minor Change - MCU21 0228 01 & OPW21 0364 01 [As Published].pdfRelated documentApplication case desk ↗
Attachment D - Decision Notice - Minor Change - MCU21 0228 01 & OPW21 0364 01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 202 KB (small file)
- File type
No other editions are linked here.