Minor Change Existing Approval MCU23/0094 01 [AS PUBLISHED] · MCU23/0094.01
DEVELOPMENT PERMIT FOR RECONFIGURING A LOT (RAL23/0014) When Conditions Must Be Complied With 1. Unless otherwise stated, all works required by the conditions of this Decision Notice must be completed prior to submission of the subdivision plan to Council for compliance assessment Currency Period 2. This development approval lapses if the requirements of the conditions have not been completed and an application for plan seal is not lodged with Council by 13 May 2030 unless an application to extend the currency period is approved by Council. Approved Plans 3. Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed in the table/s below. The plans must be amended to incorporate the amendments listed within the table below and resubmitted to Council prior to the issue of any Development Permit for Building Works* Plan No. Rev. Plan/Document Name Date - - - - The following plans require amendment. Plan No. Rev. Plan/Document Name Date WD.1.21 A Reconfiguration Plan prepared by 10.04.2024 Blackwood Architects & Design Amendments Provide additional details on the plan, including: • Proposed Lot numbers; • Common property areas; • Any required easements; and • Dimensions of Lots. *(Refer to Advisory Note) 4. All lot numbering on the subdivision plan to be submitted to Council for compliance assessment must remain as shown on the Approved Plans. Boundary Encroachments 5. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which certifies that: a. all constructed access and roadworks (including associated fill batters and retaining walls) are fully contained within a dedicated reserve or registered easement. b. all utility services and connections (eg. electricity, telecommunications, water, sewerage) are wholly located within the lot they serve or alternatively included within an easement. c. all dams (including ponded water, dam walls and associated spillway structures) are wholly located within the boundaries of a single lot. d. all retaining walls and structures are fully contained within the lot they retain unless otherwise required by condition. e. any fill, including fill batters, are wholly contained within the subject site and not on adjacent properties. Page 11 of 30 Document Set ID: 23245480 Version: 4, Version Date: 17/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU23/0094 01 [AS PUBLISHED]Related documentApplication case desk ↗
About this file
- File size
- 270 KB (small file)
- File type
No other editions are linked here.