Council archive · source document
Minor Change Existing Approval MCU23/0094 01 [AS PUBLISHED] · MCU23/0094.01
57. Where the development involves excavation or filling over, or adjacent to, drainage, water
supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
provide a freeboard of 100mm above the finished ground surface level.
58. All retaining walls must be designed and constructed in accordance with the Noosa Plan
2020 and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls
that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
59. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. Where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. Where otherwise, upon completion of the works associated with the development.
c. Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Page 10 of 30
Document Set ID: 23245480
Version: 4, Version Date: 17/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU23/0094 01 [AS PUBLISHED]Related documentApplication case desk ↗
About this file
- File size
- 270 KB (small file)
- File type
No other editions are linked here.