Council archive · source document
Minor Change Existing Approval MCU23/0094 01 [AS PUBLISHED] · MCU23/0094.01
i. Qualified experienced Civil Engineer (RPEQ) confirming design intent and
conformance with applicable standards and specifications, along with the
relevant descriptions of assets, services and structures and;
ii. Registered Cadastral Surveyor (Qld) in regard to the cadastral and locational
information, levels and applicable survey datum.
d. The data must be in accordance with Council’s “Planning Scheme Policy 6 –
Engineering Design Standards”, and fully detail the levels for all engineering works
including but not limited to the drainage network and structures, finished ground and
pavement surface levels.
e. Landscaping, including all assets and improvements within parks, open space and road
reserves areas are to be shown on an accompanying separate landscape plan
(prepared in .dwg file format with accompanying hardcopy PDFs) and include a
complaint ADAC XML file. Details of the landscaping and all associated assets and
improvements may be included in the ADAC XML digital file prepared for associated
civil infrastructure, or alternatively, be provided as a separate ADAC XML digital file
containing landscape and asset information only.
f. The building envelope data must be submitted in both hardcopy and digital format
(ADAC XML Digital File). ADAC - Asset Design As Constructed, is to be prepared in
accordance with industry standards and recorded in “MGA - UTM56 / GDA94”
projection.
On Maintenance
42. Prior to requesting an On Maintenance inspection, the following information package
(prepared by respective qualified persons* and certifying compliance with approvals) must
be submitted to Council:
a. Arborist Report documenting and certifying the findings and outcome of the arboreal
risk assessment.
b. Fauna Report documenting the findings and outcome of the fauna protection works
undertaken.
43. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
Maintenance’, the supervising RPEQ must submit to Council:
a. certification that all works have been undertaken and completed in accordance with the
requirements of this Permit.
b. as Constructed details in accordance with Council’s Planning Scheme Policy.
c. maintenance and operational manuals for all proprietary or site specific devices
Off Maintenance
44. Prior to requesting an Off Maintenance inspection the developer must provide a written
request for the Off Maintenance inspection.
45. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
where:
a. a Council inspection reveals works do not comply with approval requirements
b. submitted certification falsely states works comply with approval requirements.
Landscaping Works
46. Landscape works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice. Updated landscape plans
must be resubmitted prior to a prestart meeting that include all changes approved as part of
the higher order MCU23/0094.
(* Refer to Advisory Note)
Page 20 of 30
Document Set ID: 23245480
Version: 4, Version Date: 17/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU23/0094 01 [AS PUBLISHED]Related documentApplication case desk ↗
About this file
- File size
- 270 KB (small file)
- File type
No other editions are linked here.