Council archive · source document
Minor Change Existing Approval MCU23/0094 01 [AS PUBLISHED] · MCU23/0094.01
Site Access and Driveways
38. A sealed access driveway must be provided from Eumundi Noosa Road and Headland Drive
to all parking and manoeuvring areas of the development. The works must be undertaken in
accordance Council Standard Drawing RS-051.
Car Parking
39. A minimum of 50 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
a. A minimum of 40 covered parking spaces within the total;
b. 10 visitor parking spaces within the total, which are clearly marked for that purpose and
accessible at all times for visitor use;
c. 1 disabled parking space/s within the total;
d. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
40. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Pedestrian and Bicycle Facilities
41. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular:
a. a 3 metre wide footpath within the road verge for the entire length of the site’s frontage
to Eumundi Noosa Road;
b. the resealing of the existing asphalt path fronting the development.
Condition 41 is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk
infrastructure identified by Council’s LGIP to service the development.
Stormwater Drainage
42. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and the Queensland Urban Drainage Manual.
Condition 42 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Stormwater Quality Management
43. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and the Bioretention
Technical Design Guidelines (Water by Design, 2014), and must include in particular:
(a) stormwater quality treatment devices of a size and location generally in
accordance with those shown in the approved plans listed in this Decision Notice
(b) bioretention devices which:
(i) are designed generally in accordance with IPWEAQ Standard Drawing
No.s DS-073, DS-075 and DS-076
(ii) are provided with a free-draining outlet from the sub-soil drainage system
44. The development shall be provided with approved permanent signage to educate the
residents on the function of the bioretention basin. The wording for the signage for each
bioretention basin is to include: “BIORETENTION BASIN - This bioretention basin reduces
the pollution of our waterways by reducing the amount of heavy metals, litter, suspended
solids, and nutrients discharged to the Noosa River”.
Page 8 of 30
Document Set ID: 23245480
Version: 4, Version Date: 17/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU23/0094 01 [AS PUBLISHED]Related documentApplication case desk ↗
About this file
- File size
- 270 KB (small file)
- File type
No other editions are linked here.