45. All stormwater quality treatment devices must be maintained in accordance with the Water
by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The approved
Operational Works drawings for the stormwater quality treatment system and detailed life
cycle costing of the system must be attached as an addendum to this document. Records of
all maintenance activities undertaken must be kept and made available to Council upon
request.
Roofwater Capture and Reuse
46. In conjunction with the development application for Building Works, the hydraulic design of
the roofwater drainage system for buildings 5, 6 and 7 is to be piped to the roofwater storage
tanks nominated on drawing 33132-SW1.1 Rev E by SCG Consulting Engineers. The
roofwater system is to be designed to convey the 1%AEP event of critical duration, with a
20% increase in rainfall intensity to account for future climate change.
47. A total of 32kL of roofwater storage is to be provided for the development as shown on
drawing 33132-SW1.1 Rev E by SCG Consulting. The roofwater is to be plumbed for reuse
to the following non-potable fixtures, with the detail provided with the hydraulic design
submitted in conjunction with the development application for Building Works:
• Communal landscape irrigation
• Bin wash down
48. Certification must be submitted to Council from a qualified person which certifies that the
roofwater harvesting tanks and associated reticulation have been installed in accordance
with the requirements of this Decision Notice.
Services
49. Reticulated electricity and telecommunication services must be provided to each unit in
accordance with the standards and requirements of the relevant service provider.
50. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
51. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
52. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
53. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
54. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
55. All earthworks and associated structures/batters must be contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to Council.
56. All earthworks must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments, Building
Code requirements and Noosa Plan 2020.
Page 9 of 30
Document Set ID: 23245480
Version: 4, Version Date: 17/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU23/0094 01 [AS PUBLISHED]Related documentApplication case desk ↗
About this file
- File size
- 270 KB (small file)
- File type
No other editions are linked here.