Council archive · source document
RFI - Appendix B Civil Engineering Report · MCU22/0038
Very large file (17.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 85, section 1. The text section number identifies this passage in the reader.
12 May 2022
Figure 3 – Treatment Plan
5.3.3.7 MUSIC Results
The resulting percentage based load reductions at the outlet are shown in Table 4 below together
with the Water Quality Objectives for the receiving waters.
Residual
Sources % Reduction Target %
Load
Total Suspended Solids (kg/yr) 318 63.3 80.1 80
Total Phosporous (kg/yr) 0.943 0.266 71.8 60
Total Nitrogen (kg/yr) 10.3 4.53 56 45
Gross Pollutants (kg/yr) 73.9 0 100 90
Table 4 – Percentage Based Load Reduction Results
Excellence with Economy in Engineering 13
l:\8000-8999\8600-8699\8662\reports\12-05-22 stormwater management plan_issue b.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Appendix B Civil Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.