Noosa High Priority Cycle Route Corridor Study and Concept Design
Final Options Analysis Report (Corridor 2)




6           CONCEPT DESIGN
This section includes the presentation of the concept design prepared for Corridor 2 and additional supporting content




                                                                                   Y
relating to the scope of the design (refer to Section 6.1), wayfinding (refer to Section 6.3) and a high-level estimate of the
cost to implement (refer to Section 6.4).




                                                                                LIC
6.1         Preferred design and scope
The preferred design and scope is based on the preferred routes and design treatments as outlined in Section 5.1.8 and
5.2.9 respectively, and the outcome of engagement with the PWG and PRG before and after the formal presentation of
the draft concept design for Corridor 2 in August 2020. This engagement did not lead to design changes or affect the
alignment and treatment options selected in earlier stages of the project and as presented in Section 5. However, it did




                                                                     PO
highlight the need to further investigate the feasibility and design characteristics of the proposed separated boardwalk
structure adjacent to Noosa Drive, connecting Lions Park in the north to the Noosa Drive service road in the south.
Specifically, this includes the topography and the suitability of path grades for pedestrians and cyclists and the impact on
Lions Park. The preferred design is illustrated in Figure 27 while a corresponding description of proposed works is
presented in Table 37. This is consistent with, and formed the basis for preparing, the concept design (refer to Section
6.2).
It is expected that the preferred off-road design would enable the target LTS for people riding bikes (i.e. LTS 2 or better)
to be achieved but this would require the application of cycle priority on side roads, the provision of appropriate
                                                           CIL
treatments across driveways, and the implementation of safe and effective cycle street treatments. These items are to be
considered in detailed design (refer to Section 6.2.2), at which time a reassessment of the LTS on the corridor could be
undertaken to confirm whether the target LTS has been achieved.
The concept design prepared for Corridor 2 addresses, at a high-level, the location and implications of known utilities,
retaining walls, vegetation and public and private transport infrastructure. The design has been prepared to avoid any
direct private property impacts. It is understood that the feasibility of the concept design and any potential implications
                                        N
on existing features (e.g. vegetation, infrastructure) along the corridor will be further investigated in the detailed design
phase.
Table 37: Preferred design works
                                     OU

 ID        LOCATION                                                    DESCRIPTION OF WORKS
 2.1       Noosa Dve – Lions Park                                      Construct 5.0m separated path
 2.2       Noosa Dve Service Rd West                                   Construct cycle street
 2.3       Noosa Dve (Service Rd West – Noosa Junction)                Construct village scale cycle track
 2.4       Sunshine Beach Rd (Noosa Junction)                          Construct village scale cycle track
          TC



 2.5       David Low Way (Cooyar St – Solway Dve)                      Upgrade to 3.0m shared path
 2.6       David Low Way (Solway Dve – Pacific Ave)                    Upgrade to 3.0m shared path
 2.7       Pacific Ave                                                 Construct 3.0m shared path
 2.8       Ross Cres                                                   Construct cycle street and footpath
 2.9       Sobraon St/ Tingira Cres                                    Construct cycle street and footpath
 2.10      David Low Way (Sunrise Beach)                               Upgrade to 3.0m shared path
        NO




 2.11      David Low Way (Castaways Beach)                             Upgrade to 3.0m shared path
 2.12      David Low Way (Marcus Beach)                                Upgrade to 3.0m shared path
 2.13      Tristania Dve                                               Construct cycle street and footpath
 2.14      David Low Way (Glen Eden)                                   Construct 3.0m shared path
 2.15      Peregian Esp/ Osprey Ave/ Kingfisher Dve                    Construct 3.0m shared path
 2.16      Peregian Beach                                              Construct 3.0m shared path
 2.17      Plover St/ Piper St                                         Construct cycle street
 2.18      Shearwater St/ Lorikeet Dve                                 Construct cycle street

0996 – 24 February 2021 – V2                     The analysis, design and cost estimating referenced in the report was69undertaken
                                                 solely to guide planning and should not be interpreted as a final or endorsed
                                                 position of Noosa Council.

Log in to download the original (Noosa High Priority Cycle Route Corridor Study(PDF, 8MB).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.