Noosa High Priority Cycle Route Corridor Study and Concept Design
Final Options Analysis Report (Corridor 2)
Table 42: Draft implementation plan
SUB-TOTAL TOTAL
ID LOCATION DESCRIPTION OF WORKS PRIORITY 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30
(10-YEAR) (10-YEAR +)
Cooroy Noosa Rd $0 $568,165
1.1 Upgrade shared path to 3.0m M
(near Beckmans Rd to Fairway Dr)
Cooroy Noosa Rd $0 $779,472
1.2 Upgrade shared path to 3.0m L
Y
(Golf Course – Butler St underpass)
Poinciana Ave $0 $221,696
IC
1.3 Upgrade shared path to 3.0m M
(Butler St – Goodwin St)
Moorindil St
L
1.4 Construct 3.0m shared path H $58,656 $58,656 $58,656
(Poinciana St – Ward Park)
O
1.5 Blakesley St/Cardell Rd Construct cycle street H $271,992 $12,907 $284,899 $284,899
P
1.6 Hilton Esp Cycle Street Construct cycle street and footpath H $372,606 $372,606 $372,606
IL
Upgrade to 4.5m separated path $742,000^ $742,000^
1.7 Humpty Do Bridge* M $242,000^ $500,000^
bridge
C
Gympie Tce $* $*
1.8 Upgrade to 4.5m separated path L
(Noosaville river park)*
N
Gympie Tce $155,153 $155,153
1.9 Upgrade to 3.0m shared path VH $85,514 $69,639
(Weyba Rd – Howard St)
U
1.10 Howard St Upgrade to 3.0m shared path H $139,688 $139,688 $139,688
O
Noosa Pde $1,181,214 $1,181,214
1.11 Upgrade to 3.0m shared path VH $472,486 $708,728
C
(Howard St – Munna Point)
The analysis, design and cost estimating referenced in the report was undertaken
Upgrade to 4.5m separated path solely to guide planning and should not be interpreted as a final or endorsed $* $*
1.12 Munna Point Bridge* H
T
bridge position of Noosa Council.
Noosa Pde $5,400,000* $5,400,000*
1.13 Upgrade to 3.0m shared path VH $2,700,000* $2,700,000*
O
(Munna Point – Garth Prowd)*
Upgrade to 4.5m separated path $3,500,000^ $3,500,000^
1.14 Garth Prowd Bridge* H $3,500,000^
N
bridge
Noosa Pde $315,238 $315,238
1.15 Construct village scale cycle track H $276,697 $38,541
(Garth Prowd – Lions Park)
CORRIDOR 1 SUB-TOTAL $558,000 $778,367 $0 $0 $276,697 $508,877 $385,513 $0 $0 $0 $2,507,454 $4,076,787
2.1 Noosa Dve – Lions Park Construct 5.0m separated path VH $0 $3,573,817
2.2 Noosa Dve Service Rd West Construct cycle street VH $21,633 $91,182 $112,815 $112,815
Noosa Dve $1,234,038 $1,234,038
2.3 Construct village scale cycle track VH $708,818 $525,220
(Service Rd West – Noosa Junction)
Sunshine Beach Rd $291,123 $291,123
2.4 Construct village scale cycle track H $291,123
(Noosa Junction)
David Low Way $0 $882,407
2.5 Upgrade to 3.0m shared path M
(Cooyar St – Solway Dve)
David Low Way $215,535 $215,535
2.6 Upgrade to 3.0m shared path H $215,535
(Solway Dve – Pacific Ave)
2.7 Pacific Ave Construct 3.0m shared path M $0 $1,411,020
0996 – 24 February 2021 – V2 77
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Noosa High Priority Cycle Route Corridor Study(PDF, 8MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.