      Noosa High Priority Cycle Route Corridor Study and Concept Design
      Final Options Analysis Report (Corridor 2)



                                                                                                                                                                                                                                                               SUB-TOTAL      TOTAL
ID          LOCATION                                        DESCRIPTION OF WORKS                           PRIORITY           2020/21            2021/22          2022/23         2023/24    2024/25    2025/26    2026/27    2027/28    2028/29    2029/30
                                                                                                                                                                                                                                                                (10-YEAR)   (10-YEAR +)

2.8         Ross Cres                                       Construct cycle street and footpath                 H                                                                                                  $164,732   $21,634                          $186,366      $186,366

2.9         Sobraon St/ Tingira Cres                        Construct cycle street and footpath                 H                                                                                                             $583,562                         $583,562      $583,562

2.10        David Low Way (Sunrise Beach)                   Upgrade to 3.0m shared path                         M                                                                                                                                                 $0         $748,566

2.11        David Low Way (Castaways Beach)                 Upgrade to 3.0m shared path                         M                                                                                                                                                 $0        $1,558,451
                                                                                                                            The analysis, design and cost estimating referenced in the report was undertaken
2.12        David Low Way (Marcus Beach)                    Upgrade to 3.0m shared path                         M           solely to guide planning and should not be interpreted as a final or endorsed                                                         $0         $926,351
                                                                                                                            position of Noosa Council.




                                                                                                                                                                                   C Y
2.13        Tristania Dve                                   Construct cycle street and footpath                 H                                                                                                             $194,804   $123,289              $318,093      $318,093




                                                                                                                                                                             O L I
2.14        David Low Way (Glen Eden)                       Construct 3.0m shared path                          H                                                                                                                        $550,796              $550,796      $550,796




                                                                                                                                                                          L P
            Peregian Esp/ Osprey Ave/




                                                                                                                                                                        I
2.15                                                        Construct 3.0m shared path                          H                                                                                                                        $125,915   $800,000   $925,915     $1,056,039
            Kingfisher Dve




                                                                                                   N                                                                  C
2.16        Peregian Beach                                  Construct 3.0m shared path                          H                                                                                                                                                 $0         $213,486




                                                                                               O U
2.17        Plover St/ Piper St                             Construct cycle street                              H                                                                 $190,526                                                                     $190,526      $190,526




                                                                                           T C
2.18        Shearwater St/ Lorikeet Dve                     Construct cycle street                              H                                                                 $84,254    $523,303                                                          $607,557      $607,557




                                                              N O
CORRIDOR 2 SUB-TOTAL                                                                                                              $0             $21,633          $800,000        $800,000   $523,303   $291,123   $380,267   $800,000   $800,000   $800,000   $5,216,326   $14,660,548

HPR PROJECT TOTAL (CORRIDOR 1 & 2)                                                                                           $558,000            $800,000         $800,000        $800,000   $800,000   $800,000   $765,780   $800,000   $800,000   $800,000   $7,723,780   $18,737,335

      *Cost of new/upgraded cycle facility as per this report not included in estimate.
      ^Cost as per current Noosa Shire Council 10-year Capital Program. These costs are included in the draft implementation plan but not in the estimate to implement the HPR.




      0996 – 24 February 2021 – V2                                                                                                                   78

Log in to download the original (Noosa High Priority Cycle Route Corridor Study(PDF, 8MB).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗