b) From all disturbed areas of the site to sediment basin(s) without causing
erosion
c. Minimise sediment released from the site
i. Prior to each rainfall event ensure concentrated stormwater flow paths are
provided with capacity in accordance with IECA (2008) Table 4.3.1 and are
structurally stable in all rainfall events for the following sources:
a) Each basin is sized and operated in accordance with either a Type-A or
Type-B sediment basin as documented in IECA (2008) Appendix B (June
2018).
b) Each basin is to be provided with an automated system of flocculent dosing
and a suitable supply of flocculent/coagulant, with the type of
flocculent/coagulant determined based on Chemical Coagulants and
Flocculants Fact Sheet (IECA, 2018).
c) Markers are provided within each basin indicating the maximum sediment
storage level and any additional water storage capacity for water reuse.
d) During discharge from the primary outlet system, the concentration of total
suspended solids (“TSS”) discharged does not exceed 50mg/L and that pH
is within the range of 6.5-8.5 unless entering a naturally acidic environment.
ii. Install and maintain additional sediment control measures within the site, as
necessary to maximise sediment capture.
iii. Minimise the tracking of dirt from the site onto roadways. Ensure that all dirt on
roadways caused by vehicles leaving the site is removed without causing water
contamination, prior to rainfall and at least at the end of each work day.
52. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system, natural waterways, any downstream stormwater filtration
system or adversely impacting on other properties. The sediment and erosion control design
and measures have NOT been approved, it is the site's Supervising Engineer who is
responsible for ensuring that the sediment and erosion control measures have:
a. Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
practise" methods,
a. Been revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and/or methods,
b. Been revised to address predicted rainfall events, and
c. Achieve the desired environmental outcomes.
53. Earthworks and the implementation of erosion and sediment controls are undertaken in ways
which ensure flooding characteristics (including stormwater quantity characteristics) external
to the development site are not worsened during construction for all events up to and
including the 1% AEP (1 in 100 year ARI) event.
54. Drainage paths must be regularly inspected to ensure the sediment fences/measures are not
being bypassed as a result of sediment build up. Sediment laden runoff must be prevented
from leaving the subject site and entering neighbouring properties and/or stormwater
systems.
55. Soil exposure must be limited on the site to a distance of no more than 2m beyond the extent
of earthworks shown on the approved plans except where the exposed soil is effectively
stabilised without delay and prior to rainfall occurring.
Page 16 of 23
Document Set ID: 23977399
Version: 6, Version Date: 22/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW25 0057.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.