Negotiated Decision Notice MCU22 0174 · MCU22/0174

of 10

Text shows just the words. Original shows the document exactly as it was published.

                      Fires in Urban Areas
               4.     In urban areas fires are prohibited except where in an appliance is used for domestic heating
                      or cooking purposes, which must comply with particular standards. Any area identified as a
                      fire pit area on approved plans is to be in accordance with Local Law & Subordinate Local
                      Law No. 3, Schedule 3. Refer to the following link for details:
                      https://www.noosa.qld.gov.au/community/local-laws/local-laws-overview
                      Infrastructure Charges
               5.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
                      Building and Construction Industry (Portable Long Service Leave) Levy
               6.     The QLeave levy must be paid prior to the issue of a Development Permit for Operational
                      Works where it is required. Council will not be able to issue a Decision Notice without receipt
                      of details that the Levy has been paid.
                      Co-ordination of Operational Works Assessment
               7.     Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               8.     A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      traffic management during all aspects of the construction phase including:
                              i.       a Traffic Management Control Plan in accordance with the Manual of Uniform
                                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                       control measures prior to construction;
                              ii.      maintenance of safe vehicle and pedestrian access for the areas affected by the
                                       works during and after daily construction has ceased;
                              iii.     proposed fencing to the site during the construction phase of the development.
                      b.      maintenance and protection of water quality and existing drainage lines through the
                              construction site, through the implementation of appropriate erosion and sediment
                              control measures.
                      c.      works programme identifying key components of the works and their respective
                              durations.
                      d.      establishment of a communication protocol with the general public, adjoining owners
                              and emergency services to advise of agreed construction times, impacts on traffic,
                              services and other relevant issues.
                      e.      Include a post out to the local residents advising of the proposed development, the
                              expected time frames and the site contact details.
                      f.      Include signage in prominent locations on the boundaries of the site advising of the
                              proposed development and the site contact details.
                      g.      identification of complaint management procedures including:
                              i.       contact details for the on-site manager
                              ii.      dispute resolution procedures




                                                                                                        Page 7 of 10
Document Set ID: 22437358
Version: 3, Version Date: 25/05/2023

Used in these records

About this file

File size
176 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice MCU22 0174.pdf · 176 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.