Council archive · source document
OPW14/0362 Operational Works for reconstruction of stormwater pit
[] Yes |e This aspect of the development is assessable development and you will need a development permit e The local government will be the assessment manager for the application and the distributor—-retailer (or SARA) will be a concurrence agency for the application. e — End of part 3 of this checklist Section reference: e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 2 e Sustainable Planning Regulation 2009, schedule 7, table 2, item 47 Part 4—Taking or interfering with water 4.1 Is the proposed operational work to be carried out in a priority development area or on premises to which structure plan arrangements apply? —X] No |e Continue to question 4.2 CT] Yes e This aspect of development is not assessable development and does not require a development permit e End of part 4 of this checklist 4.2 Does any of the proposed operational work involve taking or interfering with water from a watercourse, lake or spring or from a dam constructed on a watercourse or. lake? KX] No e — End of part 4 of this checklist [] Yes |e Continue to question 4.3 4.3 Are the proposed works for any of the following purposes? Taking water from a watercourse, lake or spring in an emergency situation for a public Cl Yes xX No purpose or fighting a fire destroying, or threatening to destroy, a dwelling house Taking water from a watercourse, lake or spring if: CO Yes No e the water is taken by the owner of land adjoining the watercourse, lake or spring e the water is taken for domestic purposes or stock purposes Taking water from a watercourse, lake or spring for camping purposes or for watering LC] Yes No travelling stock Using a water truck to pump water | Yes 4 No e If no to all of the above, continue to question 4.4 e If yes to any of the above, this aspect of development does not require a development permit. ~ If this is the only aspect of taking or interfering with water proposed then that is the end of part 4 of this checklist - 1f there are other aspects of taking or interfering with water proposed, continue to question 4.4 4.4 Are the proposed works self-assessable development under schedule 3, part 2, table 4, item 1 of the Sustainable Planning Regulation 20097 No |e Goto question 4.5 Checklist 4—Operational work Version 4.1—1 October 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW14/0362 Operational Works for reconstruction of stormwater pitRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.