Skip to the record
Search everything, all in one place.

Council archive · source document

OPW14/0362 Operational Works for reconstruction of stormwater pit

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

[] Yes |e This aspect of the development is assessable development and you will need a development permit

e The local government will be the assessment manager for the application and the distributor—-retailer
(or SARA) will be a concurrence agency for the application.

e — End of part 3 of this checklist

 

 

 

Section reference:
e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 2
e Sustainable Planning Regulation 2009, schedule 7, table 2, item 47

 

Part 4—Taking or interfering with water

 

 

4.1 Is the proposed operational work to be carried out in a priority development area or on premises to
which structure plan arrangements apply?

 

 

—X] No |e Continue to question 4.2

 

CT] Yes e This aspect of development is not assessable development and does not require a development
permit

e End of part 4 of this checklist

 

 

 

4.2 Does any of the proposed operational work involve taking or interfering with water from a watercourse,
lake or spring or from a dam constructed on a watercourse or. lake?

 

 

KX] No e — End of part 4 of this checklist

 

 

[] Yes |e Continue to question 4.3

 

 

4.3 Are the proposed works for any of the following purposes?

 

 

Taking water from a watercourse, lake or spring in an emergency situation for a public Cl Yes xX No
purpose or fighting a fire destroying, or threatening to destroy, a dwelling house

 

Taking water from a watercourse, lake or spring if: CO Yes No
e the water is taken by the owner of land adjoining the watercourse, lake or spring
e the water is taken for domestic purposes or stock purposes

 

Taking water from a watercourse, lake or spring for camping purposes or for watering LC] Yes No
travelling stock

 

 

 

 

Using a water truck to pump water | Yes 4 No

 

e If no to all of the above, continue to question 4.4
e If yes to any of the above, this aspect of development does not require a development permit.

~ If this is the only aspect of taking or interfering with water proposed then that is the end of part 4 of this
checklist

- 1f there are other aspects of taking or interfering with water proposed, continue to question 4.4

 

4.4 Are the proposed works self-assessable development under schedule 3, part 2, table 4, item 1 of the
Sustainable Planning Regulation 20097

 

 

No |e Goto question 4.5

 

 

 

 

Checklist 4—Operational work
Version 4.1—1 October 2014

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW14_0362 Operational Works for reconstruction of stormwater pit.pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.