Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

OPW14/0362 Operational Works for reconstruction of stormwater pit

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

[] Yes

This aspect of development is self-assessable development and must comply with any relevant self-
assessable code

If the proposal involves more than one aspect of operational work for taking or interfering with water,
and the other aspect is not self-assessable development, then continue to question 4.5

 

 

45 Is the work for a water pump?

 

 

No

Continue to question 4.6

 

Yes

LI)

A development permit is required and this application will be assessed by the chief executive of
DSDIP as assessment manager or concurrence agency against the Sustainable management of
water resources state code in the SDAP

You must complete DAS form 13—Watercourse pump

If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist

If there are other aspects of taking or interfering with water proposed, then continue to question 4.6

 

 

4.6 — Is the

work for water storage (other than for a dam requiring failure impact assessment)?

 

 

No

Continue to question 4.7

 

Yes

OX

A development permit is required and this application will be assessed by the chief executive of
DSDIP as assessment manager or concurrence agency against the Sustainable management of
water resources state code in the SDAP

You must complete /DAS form 14—Water storage

If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist

If there are other aspects of taking or interfering with water proposed, then continue to question 4.7

 

 

4.7 Is the

work for gravity diversion from a watercourse?

 

 

No

Continue to question 4.8

 

Yes

L\X

A development permit ts required and this application will be assessed by the chief executive of
DSDIP as assessment manager or concurrence agency against the Sustainable management of
water resources state code in the SDAP

You must complete DAS form 15—Gravity diversion from a watercourse

If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist

lf there are other aspects of taking or interfering with water proposed, then continue to question 4.8

 

 

work for a watercourse diversion?

 

 

Continue to question 4.9

 

 

 

A development permit is required and this application will be assessed by the chief executive of
DSDIP as assessment manager or concurrence agency against the Sustainable management of
water resources state code in the SDAP

You must complete (DAS form 17—Watercourse diversion

If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist

If there are other aspects of taking or interfering with water proposed, then continue to question 4.9

 

 

Checklist Operational work
Version 4.1—1 October 2014

SORT

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW14_0362 Operational Works for reconstruction of stormwater pit.pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.