Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

OPW14/0362 Operational Works for reconstruction of stormwater pit

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

e If no to all of the above this development is categorised as a Category 1 levee and must comply
with any applicable self-assessable code — end of this checklist

« If yes to any of the above continue to question 13.2

 

12.2 Will the proposed operational work result in any of the following impacts:

 

 

An increase in flood height above the floorboards in an occupied building that results in 3 or LE] Yes No
more people being affected

 

 

An increase in flood velocity above the floorboards in an occupied building that results in3 or | [_] Yes No
more people being affected

 

 

 

e — If no to all of the above:
- This is categorised as a Category 2 levee and is subject to code assessment

- Adevelopment permit is required and this application requires assessment by the local
government as assessment manager against the applicable code for the construction or
modification of a levee

- You must complete /DAS form 20—Interfering with overland flow water and construction or
modification of a levee.

- End of this checklist.
e — If yes to any of the above:
- This is categorised as a Category 3 levee and is subject to impact assessment

- Adevelopment permit is required and this application requires assessment by the local
government as assessment manager against the applicable code for the construction or
modification of a levee

- This application will require assessment by the chief executive of DSDIP as concurrence agency
against the Construction or modification of levees state code in the SDAP

- You must complete DAS form 20—interfering with overland flow water and construction or
modification of a levee.

- End of this checklist.

Section references:
e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 11
e Sustainable Planning Regulation 2009, schedule 7, table 2, item 48.

Privacy—please refer to your assessment manager for further details on the use of information recorded in
this form

Disclaimer:

While the Department of State Development, Infrastructure and Planning (DSDIP) believes that the information
contained on this checklist and provided as part of this process will be of assistance to you, it is provided on the basis
that you will not rely on the information. It is your responsibility to make your own enquiries regarding the interpretation
and application of the applicable legislation to your circumstances.

To the full extent permitted by law, DSDIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this checkiist.

 

OFFICE USE ONLY

Checklist 4--Operational work
Version 4.1—1 October 2014

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW14_0362 Operational Works for reconstruction of stormwater pit.pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.