Council archive · source document
OPW14/0362 Operational Works for reconstruction of stormwater pit
e If no to all of the above this development is categorised as a Category 1 levee and must comply with any applicable self-assessable code — end of this checklist « If yes to any of the above continue to question 13.2 12.2 Will the proposed operational work result in any of the following impacts: An increase in flood height above the floorboards in an occupied building that results in 3 or LE] Yes No more people being affected An increase in flood velocity above the floorboards in an occupied building that results in3 or | [_] Yes No more people being affected e — If no to all of the above: - This is categorised as a Category 2 levee and is subject to code assessment - Adevelopment permit is required and this application requires assessment by the local government as assessment manager against the applicable code for the construction or modification of a levee - You must complete /DAS form 20—Interfering with overland flow water and construction or modification of a levee. - End of this checklist. e — If yes to any of the above: - This is categorised as a Category 3 levee and is subject to impact assessment - Adevelopment permit is required and this application requires assessment by the local government as assessment manager against the applicable code for the construction or modification of a levee - This application will require assessment by the chief executive of DSDIP as concurrence agency against the Construction or modification of levees state code in the SDAP - You must complete DAS form 20—interfering with overland flow water and construction or modification of a levee. - End of this checklist. Section references: e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 11 e Sustainable Planning Regulation 2009, schedule 7, table 2, item 48. Privacy—please refer to your assessment manager for further details on the use of information recorded in this form Disclaimer: While the Department of State Development, Infrastructure and Planning (DSDIP) believes that the information contained on this checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information. It is your responsibility to make your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by law, DSDIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your reliance on this process and the information contained on this checkiist. OFFICE USE ONLY Checklist 4--Operational work Version 4.1—1 October 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW14/0362 Operational Works for reconstruction of stormwater pitRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.