Skip to the record
Every meeting, every word.

Council archive · source document

OPW14/0362 Operational Works for reconstruction of stormwater pit

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

e If no to all of the above, this aspect of development is prohibited development and a development application
cannot be made. End of part 10 of this checklist.

e — If yes to any of the above:

- Adevelopment permit is required and this application requires assessment by the chief executive of DSDIP
as assessment manager or concurrence agency against the Removal, destruction or damage of marine
plants state code in the SDAP

- You must complete IDAS form 26—Marine plants and declared fish habitat areas
- End of part 10 of this checklist.

Section reference:

e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 8
e Sustainable Planning Regulation 2009, schedule 3, part 2

e Sustainable Planning Regulation 2009, schedule 7, table 2, item 30

 

Part 11—Great Barrier Reef Wetland Protection Areas

 

 

11.1 Js the proposed operational work for a domestic housing activity only?

 

 

No e Continue to question 11.2

 

CT] Yes e Adevelopment permit is not required for this aspect of development and this is the end of the
checklist

 

 

 

11.2 Is the proposed operational work the natural and ordinary consequence of a material change of use or
reconfiguring a lot for which the state was a concurrence agency under schedule 7, table 3, item 21A or
table 2, item 43A of the Sustainable Planning Regulation 2009?

 

 

No ¢ Continue to question 11.3

 

C] Yes | + Adevelopment permit is not required for this aspect of development and this is the end of the
checklist

 

 

 

11.3. Is the proposed operational work associated with government supported transport infrastructure or
electricity infrastructure?

 

 

xX No e A development permit is required and this application requires assessment by the chief executive of
DSDIP as assessment manager or concurrence agency against the Wetland protection area state
code in the SDAP.

e You must complete DAS form 33—Great Barrier Reef Wetland protection area
e — End of part 11 of this checklist

 

C] Yes e Apermitis not required for this aspect of development but the proposed work must comply with any
applicable self assessable code

e End of part 11 of this checklist

 

 

 

Part 12—Construction or modification of a levee

 

 

12.1 Will the proposed operational work result in any of the following off-property impacts:

 

 

 

 

 

 

A change to the flow path of overland flow water where it enters or exits the property _] Yes No
An increase in the velocity of flood flow beyond the boundaries of the property | Yes No
An increase in flooded area beyond the boundaries of the property E] Yes Xl No
An increase in flood height beyond the boundaries of the property CL Yes xX No

 

 

 

Checklist 4#—Operational work
Version 4.1—1 October 2074

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW14_0362 Operational Works for reconstruction of stormwater pit.pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.