Council archive · source document
OPW14/0362 Operational Works for reconstruction of stormwater pit
e If no to all of the above, this aspect of development is prohibited development and a development application cannot be made. End of part 10 of this checklist. e — If yes to any of the above: - Adevelopment permit is required and this application requires assessment by the chief executive of DSDIP as assessment manager or concurrence agency against the Removal, destruction or damage of marine plants state code in the SDAP - You must complete IDAS form 26—Marine plants and declared fish habitat areas - End of part 10 of this checklist. Section reference: e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 8 e Sustainable Planning Regulation 2009, schedule 3, part 2 e Sustainable Planning Regulation 2009, schedule 7, table 2, item 30 Part 11—Great Barrier Reef Wetland Protection Areas 11.1 Js the proposed operational work for a domestic housing activity only? No e Continue to question 11.2 CT] Yes e Adevelopment permit is not required for this aspect of development and this is the end of the checklist 11.2 Is the proposed operational work the natural and ordinary consequence of a material change of use or reconfiguring a lot for which the state was a concurrence agency under schedule 7, table 3, item 21A or table 2, item 43A of the Sustainable Planning Regulation 2009? No ¢ Continue to question 11.3 C] Yes | + Adevelopment permit is not required for this aspect of development and this is the end of the checklist 11.3. Is the proposed operational work associated with government supported transport infrastructure or electricity infrastructure? xX No e A development permit is required and this application requires assessment by the chief executive of DSDIP as assessment manager or concurrence agency against the Wetland protection area state code in the SDAP. e You must complete DAS form 33—Great Barrier Reef Wetland protection area e — End of part 11 of this checklist C] Yes e Apermitis not required for this aspect of development but the proposed work must comply with any applicable self assessable code e End of part 11 of this checklist Part 12—Construction or modification of a levee 12.1 Will the proposed operational work result in any of the following off-property impacts: A change to the flow path of overland flow water where it enters or exits the property _] Yes No An increase in the velocity of flood flow beyond the boundaries of the property | Yes No An increase in flooded area beyond the boundaries of the property E] Yes Xl No An increase in flood height beyond the boundaries of the property CL Yes xX No Checklist 4#—Operational work Version 4.1—1 October 2074
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW14/0362 Operational Works for reconstruction of stormwater pitRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.