17 WEBB ROAD, SUNSHINE BEACH PROPOSED RESIDENCE 7.3 Retaining Structures Design for temporary or permanent retaining structures could be carried out using a triangular pressure distribution applicable to the wall type and based on the parameters listed in Table 3. The values in Table 3 assume that the walls are fully drained and no allowance is included for hydrostatic pressures, construction loading, up-slope footing loadings, the effects of sloping ground and backfill compaction stresses. Table 3: Retaining Structure Design Parameters Lateral earth pressure coefficients Unit Friction Retained material weight angle Ka Ko (t/m3) (Degrees) Kp (Cantilever wall) (Non-yielding wall) Loose to Medium 1.8 30 0.3 0.5 3.0 Dense Sand Future Fill * * * * * Note: * depends on fill material type and level of compaction. 7.4 Permanent Drainage T Adequate site drainage must be installed to ensure that natural runoff is directed away from building walls and footings. AF Subsurface drainage must be installed behind retaining walls in order to prevent the development of hydrostatic pressure. This normally comprises slotted ‘aggi’ pipe wrapped in filter ‘sock’ and placed in gravel backfill. All excess stormwater collected around the site (including overflow from rainwater tanks and the swimming pool) must be directed by pipes / channels / swales to an infiltration system located at least 5 m down slope R of the proposed building, and not closer than 10 m from the steep dune slope. Design of the stormwater infiltration system requires an estimate of soil permeability. D Using Hazen’s equation, where soil permeability (k) = 10-2 x D10² m/s For D10 = 0.16 mm (Ref. Section 5.3) k= 10-2 x 0.16² k= 0.000256 m/s (2.56 x 10-4 m/s) = 22 m/day This order of permeability is in line with expectations for a fine grained sand (typically 10-3 to 10-4 m/s). 8.0 LIMITATIONS Your attention is drawn to the document “Report Limitations”, which is included in Appendix D of this report. The statements presented in this document are intended to advise you of what your realistic expectations of this report should be, and to present you with recommendations on how to minimise the risks associated with the services provided by Tectonic for this project. 26 February 2015 Report No. 14169-001-Rev0 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
14169-001-Rev0 17 Webb Rd -Revised Draft.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.