ORDINARY MEETING MINUTES 19 NOVEMBER 2020
ii. Where the field results and re-run MUSIC node demonstrate the
required pollution reduction efficiencies for the development are not
met, the applicant must implement additional measures to achieve the
required pollution reduction targets. The additional measures must
include, in order of priority, elevated maintenance, and then increased
treatment capacity of the stormwater quality improvement devices.
Following application of additional measures, the system must be
retested in accordance with Stormwater Australia (2018) Stormwater
Quality Improvement Device Evaluation Protocol. Version 1.2
December 2018. Where pollution reduction targets continue to not be
demonstrated the proprietary device must be removed and replaced
with a bio-retention device constructed in accordance with an
Operational Works approval or the applicant must enter into an
agreement with Council to provide improved water quality outcomes
within the catchment area.
iii. A separate water quality performance bond must be provided prior to
the issue of an Operational Works approval for Civil Infrastructure and
Stormwater for Stage 1. The water quality performance bond must be
150% of the cost of water quality monitoring required to comply with
Stormwater Australia (2018) Stormwater Quality Improvement Device
Evaluation Protocol. Version 1.2 December 2018. The performance
bond will be incrementally returned annually for the value of monitoring
works completed that year. The full value of the bond shall be returned
upon demonstration that the development delivers the required
pollution reduction targets.
C. Delete condition 21.
D. Include the following advisory note on the development approval:
1. The developer is encouraged to liaise cooperatively with local community groups
to deliver and maintain the required glossy black food tree recovery programme.
E. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
2 MCU19/0134 PLANNING & ENVIRONMENT COURT APPEAL NO. D67 OF 2020 -
REFUSAL OF AN APPLICATION FOR A BAR AT 5 TAYLOR COURT, COOROY
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 10 November 2020 and:
A. Agree to settle Planning & Environment Court Appeal No. D67 of 2020 generally in
accordance with the following conditions:
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by the conditions of this Decision
Notice must be completed prior to the use commencing, and then compliance
maintained at all times while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Page 16 of 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.