Negotiated Decision Notice - MCU24 0125, OPW24 158 & RAL24 0021 (As Published) · MCU24/0125
• Incorporation of 6 Banksia integrifolia spread evenly
throughout the road reserve revegetation area. Minimum pot
size to be 45litre.
ED 24175 OPW- C Planting Plan prepared by Element Design 06/05/25
11
Amendments • Update Plant schedule
CURRENCY PERIOD
3. The Currency Period for this development approval lapses if the development has not
substantially started by 6 September 2027, unless an application to extend the currency
period is approved by Council.
SITE SPECIFIC CONDITIONS
Bonds
4. A site control and/or compliance bond of $20,000 is to be submitted to Council prior to the
pre-start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
5. Bonds must:
a. meet the requirements of Council’s relevant Planning Scheme Policy for performance
and uncompleted works;
b. be calculated using a schedule of works and relevant bond equation;
c. have approval of the bond calculations and amount from Council prior to lodgement;
d. be lodged with Council and accompanied by the Bond Administration Fee/s; and
e. be requested for release by writing to Council when relevant approval requirements
have been met.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
6. Submit amended plans to Council as described by the conditions of this approval. Plans must
be submitted and approved prior to the pre-start meeting.
7. All necessary approvals from external service providers (e.g., Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
8. Copies of the approved plans, duly signed by the consultant Registered Professional
Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer
Construction at the prestart meeting.
9. A condition report of the drainage system and end-of-line bioretention basin must be
completed for agreement at the prestart meeting. The condition report is to include:
a. a CCTV inspection of the existing stormwater network commencing from the end-of-
line bioretention basin in Ely Street and continuing to the next upstream structure from
“EX4/4” (as identified on the Approved Plans); and
b. a dilapidation report of the existing end-of-line bioretention basin in Ely St.
10. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting / prior to any works commencing.
Page 14 of 34
Document Set ID: 24095782
Version: 12, Version Date: 05/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - MCU24 0125, OPW24 158 & RAL24 0021 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 282 KB (small file)
- File type
No other editions are linked here.