Negotiated Decision Notice - MCU24 0125, OPW24 158 & RAL24 0021 (As Published) · MCU24/0125

of 34

Text shows just the words. Original shows the document exactly as it was published.

                      Resubmission of Amended Documents Required
               18.    The conditions of this Decision Notice require resubmission of the referenced Stormwater
                      Management Plan to Council with amendments. Please address the amended document to
                      Council’s Development Assessment Branch with the Reference No. MCU24/0125.
                      Road Reserve Permit
               19.    This development permit provides the applicant with written authority to undertake the
                      development in accordance with the conditions. Any additional activities that are undertaken
                      inside Council’s road reserve for the purpose of acting on this development permit may
                      require a Road Reserve Permit. These additional activities may include, but are not limited
                      to, hoarding, pedestrian diversions, laneway closures, etc. To apply for a Road Reserve
                      Permit, or for more information, Contact Council’s Road Reserve Officer at
                      [email protected] Sealing
               20.    All works required by this permit must be completed and accepted by Council prior to
                      submitting an application for plan sealing.
                      Biosecurity Act 2014 – Fire Ant Control
               21.    Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
                      individuals and businesses are responsible for ensuring that they follow the movement
                      controls for specific organic materials to help prevent the spread of fire ants within South
                      East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
                      ant biosecurity zone may need a biosecurity instrument permit. More information is available
                      on https://www.fireants.org.au/treat/business-andindustry/movement-controls
                      General Advisory Notes
               22.    As this driveway is a private structure, the owner bears full responsibly for the standard of its
                      construction, maintenance and any liabilities associated with its construction. It is
                      recommended that professional advice be sought for the construction of the driveway to
                      ensure that the driveway is constructed in accordance with standard drawings RS-051.
               23.    Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               24.    Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               25.    Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Prestart, On and Off Maintenance Inspections Request
               26.    Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
                      business days’ notice of preferred inspection time.
               27.    If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.
               28.    A minimum maintenance period of 12 months will apply to all municipal works and thereafter
                      until such time as the works are performing in accordance with the approved design unless
                      noted otherwise.




                                                                                                       Page 31 of 34
Document Set ID: 24095782
Version: 12, Version Date: 05/09/2025

Used in these records

About this file

File size
282 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice - MCU24 0125, OPW24 158 & RAL24 0021 (As Published).pdf · 282 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.