DRAWING SCHEDULE

a 1 Cover Sheet
2 Site Plan
3 Floor Plan

Na 4 Elevations 1 3D View 1

( Q@® 5 Elevations 2

“6 Section 1
7  Sub-floor Plan
8 Floor Framing Plan
9 Bracing Plan
10 Roof Framing Plan
11 Deck Roof Framing Plan
12 Sustainability Notés
13 Sub-floor Schedule
14 Floor Frame Schedule
15 Roof Frame Schedule
16 Deck Roof Schedule

e@ 17 Gutter and Flashing Details

= 18 Flashing Details

 

ee

He

 
   

 

 

 

 

 

 

 

 

 

  

 

   

 

 

 

}
i
‘]
. .
'
3D View 2
©copyright. All plans are subject to copyright and may not be reproduced in whole or in part without the express written permission from Bush & Beach Pty. Ltd. This building shall be constructed in accordance with the cuent BCA, and all relevent Australian Standards. Template V1.8 - 24.02.09
Bush & Beach Pty. Ltd. CLIENT: PROPOSED DWELLING DRAWN: _GW DWG No. ISSUES SHER FE WINGS PATE Draw 'N’ Design Ply. Ltd.
www. bushandbeach.com.au . . WW 082620 3 Icence
Ph. 1300 305 350 Donna Jefferies Lot 90 CHECKED: 8 {WORKING DRAWINGS 02/07/09
Urunga Pde DATE: 02/07/09 4 g
eye BSA.1144953 int, QLD, 4 SCALE: a .
Tigee bulging Syst) ACN.131677319 Boreen Point, » 4565 SHEET SUE AG 18 a Date:

 

 

 

 

 

 

 

 

 

 

-
Full text of the other 5 pages

Page 2

GENERAL NOTES | RPD

1. THESE DRAWINGS TO BE READ IN CONJUNCTION WITH i LOT: 90
ALL OTHER CONTRACT DOCUMENTS, INCLUDING ENGINEERING. :
2. FIGURED DIMENSIONS TO TAKE PREFERENCE OVER ) .
SCALED DIMENSIONS * ( RP NO: 59216
. ALL DIMENSIONS TO BE VERIFIED ON SITE BY BUILDER .
. PARISH: NOOSA

PRIOR TO THE COMMENCEMENT OF WORK
4.REFER ANY DISCREPANCIES TO DESIGNER FOR WRITTEN

COUNTY: .MARCH

eee

INSTRUCTION
. BUILDING TO ENSURE CORRECT BU IG SETOUT AND .
. COMPLIANCE WITH STATUTORY HEIGHT LIMITS AND i > SHI RE: SUNSHINE COAST
BOUNDARY SETBACKS. ' AREA: 506 m2

6. THE STRUCTURE SHALL BE PROTECTED FROM TERMITE
ATTACK IN COMPLIANCE WITH AS3660.1AND BCA 3.13. i
7, STORMWATER TO BE DISCHARGED TO COUNCIL i
REGULATIONS
8. DRAINAGE WORK TO COMPLY WITH COUNCIL
REGULATIONS.
9, ALL WORK TO BE IN ACCORDANCE WITH THE B.C.A. AND
AS 1684.2-1999 AND ENGINEER ORAWINGS AND SPECIFICATIONS.
10, ALL DOORS TO ENCLOSED SANITARY COMPARTMENTS :
TO HAVE LIFT OFF HINGES, OPEN OUTWARDS, OR BE SLIDING
DOORS. UNLESS THERE IS AT LEAST 1.2m BETWEEN CLOSET

PROPOSED DRIVEWAY

PAN WITHIN THE SANITARY COMPARTMENT AND THE i

NEAREST PART OF THE DOORWAY. . | fe  _
44, ALL WET AREAS ARE TO BE WATERPROOFED IN ACCORD. Landscape 4 BORY TO FLYOVER ROOF
WITH CLAUSE 3.8.1 OF THE B.A
42. SMOKE DECTECTORS ARE REQUIRED TO BE INSTALLED IN
;CORDANCE WITH CLAUSE 3.7.2 OF THE BCA & AS 3786
Mises ARE TO BE CONSTRUCTED AND INSTALLED
IN ACCORDANCE WITH CLAUSE 3.9.2 OF THE BCA.
44, STAIRS TO BE CONSTRUCTED AND INSTALLED IN PROPOSED DWELLING
[ACCORDANCE WITH CLAUSE 3.9.1 OF THE BCA.
. INSTALL VENTILATION TO WATER CLOSETS (NATURAL OR
Gueciioica TO COMPLY WITH CLAUSE 3.8.5 OF THE BCA.

6, SUB-FLOOR VENTILATION, 400mm CLEARANCE REQUIRED TO U/S
OF BEARER IN ACCORDANCE WITH BCA PART 3.4.1 Fig. 3.4.1 Diag, b.
(NOTE: EXCLUDES BUSHFIRE RISK LEVEL 1/MEDIUM AND ABOVE)

17. SITE TO BE CUT AND FILLED IN ACCORDANCE WITH
GEOTECHNICAL ENGINEERS SPECIFICATIONS. ALL
LEVELS TO BE CONFIRMED ON SITE PRIOR TO
CONSTRUCTION.

18,EXCAVATIONS TO BE IN ACCORDANCE WITH
BCA 3.1.1 AND ENGINEERS DESIGNS, DRAINAGE WORK
TO COMPLY WITH GEOTECHNICAL ENGINEERS...
RECOMMENDATIONS AND STRUCTURAL ENGINEERS DETAILS.

49.ALL EARTH WORKS, FOOTINGS AND SLABS TO BE IN
ACCORDANCE WITH ENGINEERS DESIGN AND DETAIL.

20. DRIVEWAY AND CROSSOVER TO BE IN ACCORDANCE
WITH COUNCILS STANDARD DRAWING DETAILS.

21. ANY REQUIRED RETAINING WALLS, SITE WORKS AND '
STORMWATER DRAINAGE ARE TO BE COMPLETED PRIOR TO

CUPANCY,

IND CLASSIFICATION - N3

e
"+ ALL CONSTRUCTION TO BE CARRIED OUT IN ea

- ACCORDANCE WITH AS 1684.2 FOR A WIND 5%

e@ CLASSIFICATION OF N3 ge
5

 

 

URUNGA PARADE

 

 

 

 

 

  

3016
BDRY TO Pos
(SETOUT POINT)

<4 ‘Temporary Benchmark
nail in concrete.
6499 RL 2.044m
BORY TO POST

wW ers'Z
f* lh za

 

r

(SETOUT POINT)

51.422 m -
PROPOSED DECK 2 PROPOSED DECK 1

 
  

SUNSHINE COAST
REGIONAL COUNCIL

   

Site Plan

   

 

1
I

©copyright. All plans are subject to copyright and may not be reproduced in whole or in part without the express written permission from Bush & Beach Pty. Ltd. : This building shall be constructed in accordance with the current BCA, and all retevent Australian Standards. Template V1.8 - 24.02.09

2 e04% “es

 

Bush & Beach Pty. Ltd. - : DRAWN: _ GW. DWG No. _}ISSUE: (DETAILS: DATE:_| Draw "N" Design Pty. Ltd.
nw bushancbesch.om au CLIENT: PROPOSED DWELLING TITLE: Seo A__|WORKING DRAWINGS 26/06/09! | icence soeseo8

Ph, 1300 305 350 Donna Jefferies Lot 90 Site Plan CHECKED. (WW _1982670 |B [WORKING DRAWINGS oan

BSA 1144953 Urunga Pde . DATE: o2o7me | 9 -
i SCALE: 1:

BSA 1144953 Boreen Point, QLD, 4565 ‘ —— Sue a 18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Date:

 

 

t

Page 3

r

 

 

 

        

     

 

 

  

 

         

     

    
 

  

        

     

 

  

 

   

  
 

 

 

 

 

 

  

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a 5450 75
. Bi
L 4800 L 7200 75 1000 | - A
7 7 y “if 7 aun
_ 4430 70 3365 7053070, 3085, 70 1000 L 4450 75 3000 4 L
>A tf at 4 7 tr 7
f- ae a Ma eh ee lh 71 ‘
ne —— a
1 | 1215 DH 18090H dDP” Handrail By Others ob we ate
| I
i | 5 !
v |
[Tc cctcccrrr + & DINING a
5 8
oe =L ok ef ot J ©DP_ 1218 DH 1218 DH | DP° i *
| e
Fa) poo | i
DPpo * | g
e ee 8] ete € BED 3 | (AN Bie
3 \ FFL. 5.095 m a (8) Z g
; | 2 BED 1 | :
g R¥e Le She 7 5 . | STAIR1 2¥e
8 8) 81 8 4 1 Su
Le Ye Rs LIVING NSHINE =
a |g r | 720C/S 720C/S i REGIONAL COUN |
- - - e] cel |. = & PLANS APPROvep .
g| &] BR WIR | ~ f an Lo
8 g 1 Bo} pgie Signature: 6, Cone eP?- -
eer | Mice we ge al Date:,...2.. An gash 2009
1206 aw obs 1809 DH 1809DHQOP Leena
g L- 1206 awobs 1206awobs 298Y 0951
4 ee 4[2{3/4|5 |6[7] 8{sho172-DEOCK 2" =
e r STAIR 2 Handrail By Others
° tf i 4f 4 tf tT oo vo 7
L S400 L 1600 10100
° 7 7 + +
b 17300 1
1 7 LEGEND FLOOR. AREA
sa SMOKE ALARM HOUSE 118.08 m?
oes OBSCURE GLASS DECKS 27 at ee
Opp DOWNPIPE LANDING 1.00 m?
(av MECHANICAL VENTILATION
Floor Plan NOTE: TOTAL 146.49 rm
UNLESS OTHERWISE SPECIFIED:
-ALL INTERNAL DOORS AND ROBE DOORS
TO JOINERY HEIGHT.
-ALL INTERNAL DOORS ARE SUPPLIED BY
OWNER.
©copyright. All pians are subject to copyright and may not be reproduced in whole or in part without the express written permission from Bush & Beach Ply. Ltd. ‘ This building shall be constructed in accordance with the current BCA, and all relevent Australian Standards. Template V1.8 - 24.02.09
Bush & Beach Py. Ud | CLIENT: PROPOSED DWELLING TITLE: DRAWN: _GW | DWG No._}SSUE TET DRAWINGS aang] OT "N" Design Pty. Ltd.
Ph. 1300 305 350 Donna Jefferies Lot 90 Floor Plan CHECKED: W___|082620 |B WORKING DRAWINGS comzne| Licence 1088208
Urunga Pde DATE: 02/07/09 3 ;
BSA. 1144953 Boreen Point, QLD, 4565 SCALE: 4: 100
ACN. 131677319 SHEET SUE: As 18 Date:

 

 

 

 

 

 

 

 

 

 

 

Page 4

a

   

   

ZINCALUME CORRUGATED
GABLE END WALL CLADDING

ZINCALUME CORRUGATED
ROOF SHEETING

2250 POST HEIGHT:

HANDRAIL BY OWNER IN ACCORDANCE
WITH CL. 3.9.2 OF BCA TO ALL DECKS
ABOVE 1 METRE OFF GROUND

ZINCALUME
CORNER FLASHING

TIMBER TREADS ON
GAL. STRINGERS

SHS POSTS

North Elevation

East Elevation

ZINCALUME CORRUGATED

ROOF SHEETING WITH ANTICON

INSULATION UNDER

ZINCALUME CORRUGATED
ROOF SHEETING

ZINCALUME
CORNER FLASHING

COLORBOND RIBBED EXTERNAL
CLADDING WITH POWDERCOATED

COVER BATTENS

HANDRAIL BY OWNER IN ACCORDANCE
WITH CL. 3.9.2 OF BCA TO ALL DECKS
ABOVE 1 METRE OFF GROUND

TIMBER TREADS ON
GAL. STRINGERS

POWDERCOATED ALUMINIUM

WINDOWS & SLIDING GLASS DOORS

SHS POSTS

>

PLS VI VI III I IOI II.

TSS

                          

This buiiding shall be constructed in accordance with the current BCA, and all relevent Australian Standards.

 
                        
  

ZINCALUME CORRUGATED
ROOF SHEETING WITH ANTICON

INSULATION UNDER

POWDERCOATED ALUMINIUM
WINDOWS & SLIDING GLASS DOORS

2100

' 2600

COLORBOND RIBBED EXTERNAL
CLADDING WITH POWDERCOATED
COVER BATTENS

 

Template V1.8 - 24.02.¢

 

Bush & Beach Pty. Ltd.
www.bushandbeach.com.au
Ph. 1300 305 350

BSA.1144953
ACN.131677319

 

CLIENT: .
Donna Jefferies

 

PROPOSED DWELLING

Lot 90
Urunga Pde
Boreen Point, QLD, 4565

 

TITLE:
Elevations 1

 

 

 

 

 

 

 

 

SHEET SIZE: A3.

 

 

 

 

 

DRAWN: GW DWG No. _ SSUE: DETAILS: DATE:
A__IWORKING DRAWINGS 26/064

CHECKED: (W 082620 B_ IWORKING DRAWINGS 107109)

DATE: 02/07/09 4

SCALE: 4: 100 18

 

 

 

Draw "N" Design Pty. Ltd.
Licence 1088208

Date:

 

 

Page 5

   

@

   

                             

ZINCALUME CORRUGATED
ROOF SHEETING WITH ANTICON

INSULATION UNDER

ZINCALUME CORRUGATED .
GABLE END WALL CLADDING ZINCALUME CORRUGATED
ROOF SHEETING

_ _.. Topef wall Frome
ZINCALUME__ A

CORNERFLASHNG — wl LS SS LS SSS SS SSS SS SS SS SS SS SS SS SS SSeS: et — ones Level
POWDERCOATED ALUMINIUM @ 8
WINDOWS & SLIDING GLASS DOORS iz s/s
6 N
a
HANDRAIL BY OWNER IN ACCORDANCE g
WITH CL. 3.9.2 OF BCA TO ALL DECKS § FFL
ABOVE 1 METRE OFF GROUND wee i nna

TIMBER TREADS ON COLORBOND RIBBED EXTERNAL
GAL. STRINGERS CLAODING WITH POWDERCOATED

COVER BATTENS
SHS POSTS

    

    

 

 

      
   
  

    

 

RRR | _——
» / SS ALY, SS mS ~ SN YY ~ N SY y 7
ORR RR RR

South Elevation

ZINCALUME CORRUGATED
ROOF SHEETING WITH ANTICON

                         

    

INSULATION UNDER
ZINCALUME CORRUGATED POWDERCOATED ALUM!
GABLE END WALL CLADDING WINDOWS & SLIDING GLASS D}

Leet + mmm» LOD Of Wall Frame

ZINCALUME
CORNER FLASHING

Joinery Level

COLORBOND RIBBED EXTERNAL
CLADDING WITH POWDERCOATED
COVER BATTENS

SHS POSTS HANDRAIL BY OWNER IN ACCORDANCE

WITH CL. 3.9.2 OF BCA TO ALL DECKS
ABOVE 1 METRE OFF GROUND

TIMBER TREADS ON
GAL. STRINGERS

West Elevation

 

 

 

 

 

 

 

 

 

©copyright. All plans are subject to copyright and may not be reproduced in whole or in part without the express written permission from Bush & Beach Pty. Ltd. This building shall be constructed in accordance with the current BCA, and all relevent Australian Standards. _ Template V1.8 - 24.02.C
Bush & Beach Pty. Ltd . ELUNG TITLE: ORAWN: GW |OWG No. [ISSUE OTANS. —_—__uinGs DATE, Draw N” Design Pty. Ltd.
werw bushandbeach.com.au — | CLIENT: . PROPOSED DW oy CHECKED: IW 082620 & TWORKING DRAWINGS aoyine| Licence 1088208
Ph. 1300 305 350 Donna Jefferies Lot 90 Elevations 2 CATE azarae
Urunga Pde . : 5
BSA.1144953 Boreen Point, QLD, 4565 SCALE: 1: 100 T .
ACN. 131677319 ee SHEET SUE Aa 18 Date:

 

 

 

 

 

 

 

 

 

 

 

 

Page 6

ant tas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

50mm @ CHS GALV, STRUTS 10mm PLASTERBOARD 10mm PLASTERBOARD — COLORBOND CORRUGATED ROOF
AS SCHEDULED CEILING FIXED TO BATTENS WALL LINING SHEETING WITH ANTICON
AT 450 CRS INSULATION (light weight foil 75mm blanket) UNDER
COLORBOND ROOF SHEETING
FIXED IN ACCORDANCE WITH fee MANUFACTURER DESIGNED TRUSSES
MANUFACTURERS INSTRUCTIONS 700 0M FIXED IN ACCORDANCE WITH
850 O/H ——S 7.5* ROOF PITCH a MANUFACTURERS INSTRUCTIONS
HANDRAIL BY OWNER IN ACCORDANCE ar ROO LESE |
WITH CL. 3.9.2 OF BCA TO ALL DECKS spo <S
a ZS __.. Top of Wall Frame -
es oe ee _ Ah. _ _ _ Joinery level sf
5 Tr :
= DECK 1 LIVING BED 3 BED 2 BED 1
8 8
2 f | | s
é ee = ZS —“C—S—S SC dT CUM Uh NN a FFL te
t 400mm Min. TO U/S OF
SE DECKING N BEARER UNLESS SLOPING
N LAND ALLOWS 150mm AS
5 Si PER. BCA PART 3.4.1, Fig.
—— 3.4.1, Diag. b.
memes hn TIT
N NLR) SKS LXLENSL TIMBER TREADS ON
< NNANINA SYN ~ . XX IXKXS: XO GAL. STRINGERS
. WY YN ‘ YY, NS =~ YN : AL.
. 4

Yo

 

 

 

 

   

—IN. RC

SYYPP"#é

4

4

 

 

v 4

 

DODO

KERQERQaLREREY

KNX

  

        

 

 

SN NN
, SUNSHINE
(P1) HOUSE POSTS MANUFACTURER ‘— FLOOR FRAME __ SHEET FLOORING REGION Coast
AS SCHEDULED IN DESIGNED WALL FRAMES AS SCHEDULED Pp AL Cou NC
CONCRETE FOOTING TO LANS App
ENGINEERS DESIGN Ov.
Signature: 7, .
_ Section |
eo
©copyright. Ail plans are subject to copyright and may not be reproduced in whole or in part without the express written permission from Bush & Beach Pty. Ltd. This building shall be constructed in accordance with the current BCA, and all relevent Australian Standards. Template V1.8 - 24.02.¢

Bush & Beach Pty. Ltd. . TITLE: DRAWN: GW DWG No._|!SSUE: [DETAILS: DATE:_| Draw "N" Design Pty. Ltd.

wan bushandbeach.com.au CLIENT: . PROPOSED DWELLING . CHECKED: W 982620 A WORKING DRAWINGS 26/06/08 | icence 1088208

Ph. 1300 305 350 Donna Jefferies Lot 90 Section 1 s RKING DRA\ 02079 ee

Urunga Pde DATE: 02/07/09 6
BSA. 1144953 i SCALE: 1: 100
ACN 131677319 Boreen Point, QLD, 4565 ae 18 Date:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
764 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0951 - Approved plans [As Published].pdf · 764 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.