Delegated Report - Code - Planning MCU25 0053 · MCU25/0053
Property Access and Driveways
11. Vehicle access to the subject site is limited to the constructed driveway only. A clause must
be included in the contract of sale for the subject site which requires vehicle access to be
from the constructed driveway only, and which prohibits the driveway from being relocated
without Council agreement.
12. Car parking spaces must be provided on site as shown on the approved plans and always
made available and accessible for residents. Vehicle manoeuvring areas are to be provided
on site in accordance with the Australian Standards for Off-street car parking so vehicles
enter and leave the site in a forward gear.
Stormwater Drainage
13. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge without causing scour or damage to the subject site or any adjoining properties.
Easements
14. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
15. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
16. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
17. All works must be carried out in accordance with the recommendations contained in PTG
Consulting’s Geotechnical Investigation Report (PTG/01608-0001, Rev. 0) dated 28
February 2025 and endorsed as part of the building approval.
18. A dilapidation survey must be carried out of all adjacent properties, structures and
infrastructure prior to the commencement of works and endorsed as part of the building
approval.
Acid Sulfate Soils
19. All works must be carried out in accordance with PTG Consulting’s Acid Sulfate Soil
Management Plan (PTG/01608-0002, Rev. 0) dated 11 April 2025 and endorsed as part of
the building approval.
Dewatering
20. All dewatering works must be carried out in accordance with ADG Consulting’s Dewatering
Management Plan (ADG1777.25, Rev. 0) dated 1 May 2025 and endorsed as part of the
building approval.
Earthworks and Retaining Walls
21. All earthworks and associated batters/retaining structures, both above and below ground
level, both temporary and permanent, must be undertaken in accordance with the conditions
of this approval and contained entirely within the subject site unless written permission from
the respective landowner(s) is provided to Council.
22. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height.
Damage to Services and Assets
23. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
Page 13 of 19
Document Set ID: 24261132
Version: 12, Version Date: 26/11/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU25 0053.pdfRelated documentApplication case desk ↗
Delegated Report MCU25/0053 & OPW25/0074 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.