NATURAL HAZARDS OVERLAY CODE               ;                                                                                                                                                         4 pmm
                                                                                                                                                                                                      €
  Performance Criteria and Acceptabie Solutions                                                                                                                                                         1        BRISBANE

  PERFORMANCE CRITERIA                                ACCEPTABLE SOLUTIONS                                SOLUTIONS’           COMMENTS                                                          COUNCIL USE ONLY
a Oa                                                                                                    DC
  018 Community Uses and Infrastructure Uses | $18.1 Community Uses and infrastructure Uses
  are  able  to   function  effectively during  and | are sited and constructed to ensure that floor tevels      N/A           The subject site is not within a flood hazard area.
  immediately after flood events.                     are not fess than the AEP (or ARI) levels identified
                                                      below—
                                                      a)   Emergency    service facilities- 0.2%   AEP
                                                           (1:500 ARI);
                                                      b)   Emergency shelter- 0.5% AEP (1:200 ARI);
                                                      c)   Police station- 0.5% AEP (1:200 ARI);
                                                      d)   Hospital- 0.2% AEP (1:500 ARI);
                                                      e)   Electricity substation- 0.2% AEP (1:500 ARI);
                                                      f}   Water treatment plant- 0.2% AEP (1:500 ARI);
                                                      g)   Power station- 0.5% AEP (1:200 ARI);
    .                                                 h)   Major electrical switch yard- 0.5% AEP (1:200
                                                           ARI); and
                                                      i)   Store for valuable records or items of historic
                                                           or cultural significance- 0.5% AEP { 1:200
                                                      ~    ARI).

 019 All lots have sufficient area that is above the | $19.1 The minimum area above flood level for
 1% AEP (1:100 year ARI) flood level or where | each lot, is in accordance with Table 13.11;                     NA           The subject site is not within a flood hazard area.
 modelling is not available, the highest recorded
 flood level, to safely and adequately accommodate | AND
 their intended use.
                                                      $19.2   Where the    existing roads  servicing a
 AND                                                  development provide a specific flood immunity (as
        :                                             determined by Chapter 6 of the Qld Transport Road
 020   Development    integrates  with  the  natural | and Drainage Design Manual and the Australian
 landform rather than modifying the landform to suit | Rainfall and Runoff Guide), all lots have access to
 the development.34                                   the flood free area identified in Table 13.11 that
                                                      matches the road immunity;              -
                                                      AND
                                                      $20.1 Flood immunity for development areas is not
                                                      achieved by filling land below the 1% AEP (1:100
 1     Solution: | % = Acceptable Solution                                                                                                       :                                                          Appendix C
                    AIS = Altemative Solution                                                                                                                                                           nat hazards.doc
                    N/A = Not applicable to this proposal                                                                                .
 178 - 182 Eumundi Noosa Road, Noosaville                               ©                                                                @                                                                     Page 10

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.