Council archive · source document
0015E24E.001
Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Text sections not matched to the original PDF pages. See original document to check page numbers.
TRANSPORT, ROADS AND DRAINAGE CODE 4 pm m
Performance Criteria and Acceptable Solutions 1 BRISBANE
Fas ae UE Oa PA aA) ACCEPTABLE SOLUTIONS SOLUTIONS" COMMENTS COUNCIL USE ONLY
O5 Roads and pedestrian and cycle paths are | $5.1 Road planning and design supports the v The proposed internal roads will support the surrounding road
planned and designed to support the hierarchy and | hierarchy and functional aspects identified in network.
functional aspects identified in Sections 2 and 3 of | Sections 2 and 3 of PSP5 Engineering Design
PSPS Engineering Design Standards - Roads, | Standards -Roads, Drainage and Earthworks;
Drainage and Earthworks and to ensure that—
a) design and alignment of the roads, intersections | AND
and all associated works—
i, provides a safe environment for all users: $5.2 Road and pathway planning and design is in v The transport networks will be compliant with Councils
ii, is adequate for the design speed | accordance with, in order of precedence— requirements.
environment; a) Noosa Integrated Local Transport Plan;
tii. is adequate for predicted traffic volumes; | b) Queensland Transport's Shaping Up;
and c)} Queensland Design Code for Residential
iv. maintains the safe and efficient functioning Streets;
of the road network without the use of | d) AUSTROADS Guide to Traffic Engineering
traffic signals; Practice;
v. is compatible with existing roads; e) Sections 2 and 3 of PSPS Engineering Design
vi. is easily maintained by Council equipment; Standards - Roads, Drainage and Earthworks;
and or
vil. where appropriate, has the ability to | f} the Noosa Cycling and Walking Network
accommodate public transport services; Development Plan; .
b) road pavement suifaces—
i. are durable enough to cary estimated | OR
wheel loads of travelling and parked
vehicles; . g) A combination of the principles in these
ii. provide for the safe passage of vehicles, documents.
pedestrians, cyclists, and discharge of
stormwater run-off from contributing | AND
catchments and the preservation of ail
weather access; $5.3 On-road cycling treatment is utilised to v Cycle treatments will be provided where appropriate.
c) kerb and channel— provide safe and continuous movement of cyclists
i. controls vehicle movement by delineating | along a roadway, such as—
the camiageway for all users; a) sealed shoulders;
i. conveys road pavement run-off to |b) wide kerbside lane;
stormwater drainage in a manner that | c) exclusive or peak period bicycle lane;
1 Solution: ¥ = Acceptable Solution Appendix C
A/S = Alternative Solution trans, roads, drain code.doc
N/A = Not applicable to this proposal
178 - 182 Eumundi Noosa Road, Noosaville @ @ Page 2See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E24E.001.pdfRelated documentPublic source context ↗
07/0256 - MCU - Bunnings Warehouse [As Published]Related documentApplication case desk ↗
About this file
- File size
- 13.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.