TRANSPORT, ROADS AND DRAINAGE CODE e e | mm
Performance Criteria and Acceptable Solutions ‘ p BRISBANE
PERFORMANCE CRITERIA ACCEPTABLE SOLUTIONS SOLUTIONS’ er Ve URS) COUNCIL USE ONLY
allows the road to be trafficable in Q100 | d) advisory treatments such as _ Bicycle
ARI local rainfall events; and Awareness Zone;
d) verges and footpaths provide— e) shared parking / bicycle lane; ,
i. safe access for pedestrians and cyclists | f) contra flow bicycle lane; and
clear of obstructions; g) _bus/bicycle tane.
ii. an access area for vehicles onto properties; .
iii. a coridor allocated for services and | $5.4 The provision of bicycle lanes at intersections ¥ Cycle lanes will be provided where appropriate.
utilities; and is generally in accordance with AUSTROADS Part
iv. additional amenity for minor roads. 14, section 5 and the Manual of Urban Traffic
Control Devices (MUTCD) Part 9.
O6 Stormwater drainage infrastructure is planned, | $6.1 Stormwater drainage planning, design and Y All stormwater designs will be compliant with Councils
designed and constructed to— construction is in accordance with Section 4 of requirements.
a) be accessible, cost effective and easily | PSP5 Engineering Design Standards — Roads,
maintainable; Drainage and Earthworks;
b} protect downstream capacity;
c) protect downstream water quality; AND ;
d} maximise on-site stormwater retention and
retardation; and $6.2 As Constructed data is submitted in v All appropriate modelling will be provided.
e) convey run-off to stormwater drainage in a | accordance with Section 6 of PSP5 Engineering
manner that allows roads to be trafficable in | Design Standards - Roads, Drainage and
Q100 ARI local rainfall events. Earthworks;
AND
$6.3 Stormwater drainage planning, design and v All appropriate stormwater plans will be provided.
construction is in accordance with the Queensland
Urban Drainage Design Manual. ;
07 Roads and stormwater drainage infrastructure is | $7.1 Roads and stormwater drainage infrastructure Y All appropriate road and stormwater plans will be provided.
constructed— is constructed in accordance with—
a) in accordance with appropriate engineering | a) Sections 2, 3 and 4 of PSPS Engineering
standards, and Design Standards - Roads, Drainage and
b) to minimise adverse environmental impacts, Earthworks;
including from run-off and erosion. b) Queensland Design Code for Residential
Streets;
1 Solution: ~~ = Acceptable Solution Appendix C
A/S = Altemative Solution trans, roads, drain code.doc
N/A = Not applicable to this proposal
178 - 182 Eumundi Noosa Road, Noosaville Page 3See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E24E.001.pdfRelated documentPublic source context ↗
07/0256 - MCU - Bunnings Warehouse [As Published]Related documentApplication case desk ↗
About this file
- File size
- 13.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.