Skip to the record
Beware of cheap imitations.

Council archive · source document

0015E24E.001

of 236

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Text sections not matched to the original PDF pages. See original document to check page numbers.

TRANSPORT, ROADS AND DRAINAGE CODE                                                                                                                                                                  4        mm
Performance Criteria and Acceptable Solutions                                                                                                                                                        \ pP     BRISAANE

PERFORMANCE CRITERIA                                ACCEPTABLE SOLUTIONS                                SOLUTIONS’           er   as MRS)                                                     COUNCIL USE ONLY
                                                    b)   installing protective fencing around the dripline
                                                         of vegetation; and
                                                    c)   ensuring stock piling, storage and vehicle
                                                         parking occur outside the areas of vegetation
                                                         to be retained;
                                                    AND
                                                    $8.5 Low impact construction techniques are used
                                                    around areas of vegetation to be retained to
                                                    minimise interference with the vegetation.

O9 Roads and stormwater drainage infrastructure is | No solution provided                                       v           All roads and stormwater infrastructure will be to Councils
proven to be suitable for its use prior to Council                                                                          standards.
accepting the dedicated asset.                                                            .

010 Alignment of stormwater drainage infrastructure | $10.1 The location, design and construction of            v           All stormwater structures will be to Councils standards.
is to allow for easy access for the ongoing | stormwater drainage structures is in accordance
maintenance by Council.                             with Sections 4 and 5 of PSP5, Engineering Design
                                                    Standards - Roads, Drainage and Earthworks;                                                                                                                              :
                                                    AND
                                                    $10.2 Where infrastructure is located on private            ¥           Appropriate easements will be created where necessary.
                                                    land   an   easement   is   dedicated  over   the
                                                    infrastructure in accordance with Section 4 of PSP
                                                    §,   Engineering  Design   Standards   ~  Roads,
                                                     Drainage and Earthworks.

14,165 Frontage works                                                                                                                                                   .

011    Development   is  provided   with  extemal | $11.1   The following infrastructure components             v           All necessary infrastructure will be provided.
roadworks along the full extent of the frontage of the | already exist at the frontage of the site or are
site to an appropriate standard having regard to the | provided at the developer's expense—
specified function of the road.                      a}  full width sealed road;
1.    Solution:    =~ = Acceptable Solution                                                                                                                                                               Appendix C
                  A/S = Altemative Solution                                                                                                                                                trans, roads, drain code.doc
                   N/A = Not applicable to this proposal                                   .
178 - 182 Eumundi Noosa Road, Noosaville                                                                                                                                                                      Page 5

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.