TRANSPORT, ROADS AND DRAINAGE CODE 4 pmm
€
Performance Criteria and Acceptable Solutions 1 BRISBANE
PERFORMANCE CRITERIA ACCEPTABLE SOLUTIONS SOLUTIONS’ COMMENTS COUNCIL USE ONLY
c) AUSTROADS; or
d) A combination of the principles in these
documents;
AND
$7.2 Erosion and sediment control measures are ¥ All appropriate sediment and erosion control measures will be
designed and implemented in accordance with the undertaken.
Institution of Engineers Australia (Queenstand
Division) Soil Erosion and Sediment Control -
Guidelines for Queensland Construction Sites.
Environmental Protection
O8 Roads and stormwater drainage infrastructure | $8.1 Roads and stormwater drainage follow the NIA The subject site is void of any ecological value such as native
are located and aligned so as to— edge of existing disturbed areas, or alternatively, vegetation or native habitats.
a) minimise disturbance to native vegetation | these works are co-located within a combined utility
and/or other habitat areas; corridor;
b) protect and maintain wildlife corridor
movements and the safety of native fauna; AND
¢c) minimise changes to the hydrological regime,
including drainage pattems, run-off and water | $8.2 Roads avoid native vegetation and provide for :
quality; ' fauna underpasses and associated fencing where
d) avoid crossing watercourses, drainage lines | appropriate;
and wetlands, but where such crossings are
unavoidable, disturbed areas are reinstated and | AND
revegetated on completion of works; and
e) minimise bulk earthworks. $8.3 Road infrastructure within or adjacent to
native habitat incorporates fences which allow for
protected wildlife movement and controls
unrestricted access of domestic cats and dogs:
AND
$8.4 Native vegetation is protected from clearing or
construction activities by—
a) clearly marking vegetation to be retained with
flagging tap;
1 Solution: ~ = Acceptable Solution Appendix C
A/S = Altemative Solution trans, roads, drain code.doc
N/A = Not applicable to this proposal
178 - 182 Eumundi Noosa Road, Noosaville @ © Page 4See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E24E.001.pdfRelated documentPublic source context ↗
07/0256 - MCU - Bunnings Warehouse [As Published]Related documentApplication case desk ↗
About this file
- File size
- 13.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.