Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

0015E24E.001

of 236

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Text sections not matched to the original PDF pages. See original document to check page numbers.

WATER SUPPLY & SEWERAVE RETICULATION CODE                             e                                                                e                                                            4        mm
Performance Criteria and Acceptable Solutions                                                                                                                                                         ‘’ p BRISBANE

PERFORMANCE CRITERIA                                ACCEPTABLE SOLUTIONS                                SOLUTIONS’          COMMENTS                                                          COUNCIL USE ONLY

14.181 Design and construction (water)                                                                                                           ;

O1 Water supply infrastructure—                     $1.1 Water supply infrastructure is designed in            v            Water supply will be sufficient for the proposed use.
a)  meets the needs of the users;                   accordance with Section 3 of PSP6 -Engineering
b}  is designed to be compatible with existing      Design Standards — Water and Sewerage and As
    infrastructure; and                             Constructed data submitted in accordance with
c}  is designed using materials that are suitable for | Section 7 of PSP6 -Engineering Design Standards
    the use, durable, easy to maintain and cost     — Water and Sewerage.
    effective, taking into account the whole of life
    cycle cost and Council's maintenance inventory.

Q2 Water supply infrastructure is constructed—      $2.4 Water supply infrastructure is constructed in         v            Water supply will be constructed to Councils standards.
a)  in accordance with appropriate engineering      accordance with Section 6 of PSP6 -Engineering
    standards; and                                  Design Standards — Water and Sewerage;
b)  to minimise adverse environmental impacts.
                                                    AND
                                                    $2.2 Erosion and sediment control measures are             v            Appropriate erosion and sediment control measures will be
                                                    designed and implemented in accordance with the                         undertaken.
                                                    Institution of Engineers Australia (Queensland
                                                    Division) Soil Erosion and Sediment Control -
                                                    Guidelines for Queensland Construction Sites.

03 Water supply infrastructure is proven to be      No solution provided.                                       v           Water supply will be to Councils standards.
Suitable for its use prior to Council accepting the
dedicated asset.

04 Water supply infrastructure is provided with all No solution provided.                                       v           All relevant technical information will be supplied when required.
supporting technical documentation.
O5 Where buildings or other structures are in       $5.1 The footing of any building or structure is            v           All structures wilt be appropriately located in relation to water P|
proximity to Council's water supply infrastructure, located clear of the zone of influence but no closer                    infrastructure.
1     Solution: | ~ = Acceptable Solution                                                                                                                                  .                              Appendix C
                  A/S = Altemative Solution                                                                                                                                                   water supp and sew.doc
                  N/A = Not applicable to this proposal!
178 -182 Eumundi Noosa Road, Noosaville                                                                                                                                                                       Page 1

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.