Council archive · source document
0015E24E.001
Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Text sections not matched to the original PDF pages. See original document to check page numbers.
WATER SUPPLY & SEWERAVE RETICULATION CODE e e 4 mm
Performance Criteria and Acceptable Solutions ‘’ p BRISBANE
PERFORMANCE CRITERIA ACCEPTABLE SOLUTIONS SOLUTIONS’ COMMENTS COUNCIL USE ONLY
14.181 Design and construction (water) ;
O1 Water supply infrastructure— $1.1 Water supply infrastructure is designed in v Water supply will be sufficient for the proposed use.
a) meets the needs of the users; accordance with Section 3 of PSP6 -Engineering
b} is designed to be compatible with existing Design Standards — Water and Sewerage and As
infrastructure; and Constructed data submitted in accordance with
c} is designed using materials that are suitable for | Section 7 of PSP6 -Engineering Design Standards
the use, durable, easy to maintain and cost — Water and Sewerage.
effective, taking into account the whole of life
cycle cost and Council's maintenance inventory.
Q2 Water supply infrastructure is constructed— $2.4 Water supply infrastructure is constructed in v Water supply will be constructed to Councils standards.
a) in accordance with appropriate engineering accordance with Section 6 of PSP6 -Engineering
standards; and Design Standards — Water and Sewerage;
b) to minimise adverse environmental impacts.
AND
$2.2 Erosion and sediment control measures are v Appropriate erosion and sediment control measures will be
designed and implemented in accordance with the undertaken.
Institution of Engineers Australia (Queensland
Division) Soil Erosion and Sediment Control -
Guidelines for Queensland Construction Sites.
03 Water supply infrastructure is proven to be No solution provided. v Water supply will be to Councils standards.
Suitable for its use prior to Council accepting the
dedicated asset.
04 Water supply infrastructure is provided with all No solution provided. v All relevant technical information will be supplied when required.
supporting technical documentation.
O5 Where buildings or other structures are in $5.1 The footing of any building or structure is v All structures wilt be appropriately located in relation to water P|
proximity to Council's water supply infrastructure, located clear of the zone of influence but no closer infrastructure.
1 Solution: | ~ = Acceptable Solution . Appendix C
A/S = Altemative Solution water supp and sew.doc
N/A = Not applicable to this proposal!
178 -182 Eumundi Noosa Road, Noosaville Page 1See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E24E.001.pdfRelated documentPublic source context ↗
07/0256 - MCU - Bunnings Warehouse [As Published]Related documentApplication case desk ↗
About this file
- File size
- 13.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.