Council archive · source document
0015E24E.001
Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Text sections not matched to the original PDF pages. See original document to check page numbers.
WATER SUPPLY & SEWERAVE RETICULATION CODE 4 mm
Performance Criteria and Acceptable Solutions 1 p BRISBANE
PERFORMANCE CRITERIA ACCEPTABLE SOLUTIONS SOLUTIONS’ COMMENTS COUNCIL USE ONLY
provision is made to protect the infrastructure from than 1.5m (measured horizontally) from
physical damage and to allow ongoing maintenance j infrastructure including sewers, water mains and
by Council. stormwater structures;
AND
$5.2 A registered easement in favour of Council is v Appropriate easements will be created when required.
created over all underground infrastructure located
in private property; .
AND
$5.3 The width of the easement is the greater of v Appropriate easements will be created when required.
3m or the width of the zone of influence;
AND
55.4 The easement is centred over the centreline v Appropriate easements will be created when required.
of the infrastructure.
06 Alignment of water supply infrastructure allows $6.1 Infrastructure is designed and constructed on v Alignment of water supply will be to Councils standards.
for easy access for the ongoing maintenance by the preferred alignments in accordance Section 3
Council. of PSP6 Engineering Design Standards - Water
and Sewerage.
07 Any alterations or repairs to infrastructure as a 57.1 Any alterations or repair to infrastructure as a v Any alterations or repairs to infrastructure as a result of the
result of the development are made at no cost to result of the development are completed at the development will be completed at the developers expense.
Council, developer's expense.
14.182 Design and construction (sewer)
08 Sewerage reticulation infrastructure— $8.1 Sewerage reticulation infrastructure is ¥ Sewerage systems will be to Councils standards.
a) meets the needs of the users; designed in accordance with Sections 4 and 5 of
b) is designed to be compatible with existing PSP6 Engineering Design Standards - Water and
infrastructure; and Sewerage.
1 Solution: ~ = Acceptable Solution Appendix C
AVS = Altemative Solution water supp and sew.doc
N/A = Not applicable to this proposal
178 -182 Eumundi Noosa Road, Noosaville @ @ Page 2See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E24E.001.pdfRelated documentPublic source context ↗
07/0256 - MCU - Bunnings Warehouse [As Published]Related documentApplication case desk ↗
About this file
- File size
- 13.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.