WATER SUPPLY & SEWERAVE RETICULATION CODE e 4 mm
Performance Criteria and Acceptable Solutions ‘ Pp BRISBANE
PERFORMANCE CRITERIA ACCEPTABLE SOLUTIONS SOLUTIONS’ COMMENTS COUNCIL USE ONLY
c} is designed using materials that are suitable of
the use, durable, easy to maintain and cost
effective, taking into account the whole of life
cycle cost and Council’s maintenance inventory.
09 Sewerage reticulation infrastructure is $9.1 Sewerage reticulation infrastructure is v Sewerage systems will be to Councils standards. /
constructed— constructed in accordance with Section 6 of PSP6
a) in accordance with appropriate engineering -Engineering Design Standards — Water and
standards; and Sewerage and As Constructed data submitted in
b) to minimise adverse environmental impacts accordance with Section 7 of PSP6 -Engineering
Design Standards — Water and Sewerage;
AND
$9.2 Erosion and sediment control measures are v Sewerage systems will be to Councils standards.
designed and implemented in accordance with the
Institution of Engineers Australia (Queensland
Division) Soil Erosion and Sediment Control -
Guidelines for Queensland Construction Sites.
010 Sewerage reticulation infrastructure is proven No solution provided. ¥ Sewerage systems will be to Councils standards.
to be suitable for its use prior to Council accepting
the dedicated asset.
O11 Sewerage reticulation infrastructure is provided | No solution provided. v All relevant technical information will be supplied when required.
with all supporting technical documentation.
012 Where buildings or other structures are $12.1 The footing of any structure or building is v All structures will be appropriately located in relation to sewerage
developed adjacent to Council's sewerage located clear of the zone of influence but no closer infrastructure.
reticulation infrastructure, satisfactory provision is than 1.5m (measured horizontally) from
made to protect the infrastructure from physical infrastructure including sewers, water mains and
damage and to allow ongoing maintenance by stormwater structures;
Councit.
AND
1 Solution; + = Acceptable Solution Appendix C
A/S = Alternative Solution water supp and sew.doc
N/A = Not applicable to this proposal
178 -182 Eumundi Noosa Road, Noosaville Page 3See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E24E.001.pdfRelated documentPublic source context ↗
07/0256 - MCU - Bunnings Warehouse [As Published]Related documentApplication case desk ↗
About this file
- File size
- 13.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.