SURFACE WATER MANAGEMENT PLAN                                     Cc        ) Cardno
 BUNNINGS WAREHOUSE, NOOSAVILLE

          In order to provide a further improvement in water quality in low flow events (of up to the
         three month return period) the initial 300mm of storage depth available in the basin will be
  .      used for stilling of flows. The main stormwater outlet will be set at 300mm above the basin
          invert level, whereas a smaller pipe set at a lower level will allow the controlled release of
         low flows over a longer period.
         An emergency spillway is also provided in the basin to allow flows from extreme events (in
         excess of the 100-year event) to pass over the rim of the basin in a controlled manner,
         bypassing the outlet. This would be achieved by lowering a 5 metre wide section of the
         basin rim to a reduced top level of 1.15 metres above the basin invert.
         2.5        RAFTS Model Results
         A range of storm durations were modelled for a series of ARI design events. Peak flows
         were determined for the 1 year through to the 100 year event and durations ranged from
          10 minutes through to the 24 hour event.
         The results of the modelling are shown in the table below.

         Table 6     Detention Basin Sizing Results

                     Discharge | (without basin) | peak Basin | Peak Basin | Peak Outflow
                        (m*/s)      Discharge (m*/s)    Stage (m)     Volume (m*)       (m*Is)

         | 10 |         0.508             1.338                          1004           0.407
                       0.224             0.759       | 046 |             574           0.198
         The table shows that in all cases peak outflows are reduced to below the existing case
         discharges. The maximum utilised volume of the detention basin is approximately 1429 m3,
         giving a peak stage of 1.14 metres in the 100 year ARI event.    It can be noted that the
         design is relatively conservative as the depth of ponding is relatively low. Therefore it     @
         should be possible to optimise the design and reduce the footprint of the basin even further
         in detailed design.
         QUDM indicates in Table 6.2 that the maximum allowable stage during the 20 year ARI
         event is 1.20 metres. The peak basin stage of 0.91 metres displayed for the basin is well
         below this figure. A 300mm freeboard over the 100-year level should be provided, resulting
         in a top bund level of 1.45m above the basin invert tevel.

Bunnings Warehouse                             Version 3                             8 February 2007
J:A3501-54\WPISWMP3.doc                 Commercial in Confidence                            Page 4

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.