SURFACE WATER MANAGEMENT PLAN Cc ) Cardno
BUNNINGS WAREHOUSE, NOOSAVILLE
In order to provide a further improvement in water quality in low flow events (of up to the
three month return period) the initial 300mm of storage depth available in the basin will be
. used for stilling of flows. The main stormwater outlet will be set at 300mm above the basin
invert level, whereas a smaller pipe set at a lower level will allow the controlled release of
low flows over a longer period.
An emergency spillway is also provided in the basin to allow flows from extreme events (in
excess of the 100-year event) to pass over the rim of the basin in a controlled manner,
bypassing the outlet. This would be achieved by lowering a 5 metre wide section of the
basin rim to a reduced top level of 1.15 metres above the basin invert.
2.5 RAFTS Model Results
A range of storm durations were modelled for a series of ARI design events. Peak flows
were determined for the 1 year through to the 100 year event and durations ranged from
10 minutes through to the 24 hour event.
The results of the modelling are shown in the table below.
Table 6 Detention Basin Sizing Results
Discharge | (without basin) | peak Basin | Peak Basin | Peak Outflow
(m*/s) Discharge (m*/s) Stage (m) Volume (m*) (m*Is)
| 10 | 0.508 1.338 1004 0.407
0.224 0.759 | 046 | 574 0.198
The table shows that in all cases peak outflows are reduced to below the existing case
discharges. The maximum utilised volume of the detention basin is approximately 1429 m3,
giving a peak stage of 1.14 metres in the 100 year ARI event. It can be noted that the
design is relatively conservative as the depth of ponding is relatively low. Therefore it @
should be possible to optimise the design and reduce the footprint of the basin even further
in detailed design.
QUDM indicates in Table 6.2 that the maximum allowable stage during the 20 year ARI
event is 1.20 metres. The peak basin stage of 0.91 metres displayed for the basin is well
below this figure. A 300mm freeboard over the 100-year level should be provided, resulting
in a top bund level of 1.45m above the basin invert tevel.
Bunnings Warehouse Version 3 8 February 2007
J:A3501-54\WPISWMP3.doc Commercial in Confidence Page 4See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E24E.001.pdfRelated documentPublic source context ↗
07/0256 - MCU - Bunnings Warehouse [As Published]Related documentApplication case desk ↗
About this file
- File size
- 13.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.