SURFACE WATER MANAGEMENT PLAN                                     qi            Cardno
            BUNNINGS WAREHOUSE, NOOSAVILLE                                              )

                     2.5.1     Areas with impractical gradients
                     It may be noted that levels across the site may be such that it will be difficult or impractical
                     to route runoff from certain areas to the detention basin. To ensure adequate falls across
                     the car park, for example, a cut and fill operation is envisaged which will require the use of
                     a retaining wall along the western boundary.    it has been suggested that in this area,
                     surface water is released direct to the outlet swale without passing through the detention
                     basin (although three-month flows will still pass through bio-retention devices). To ensure
                     that surface water runoff rates following development are equal to or less than those
                     existing, even with an unattenuated area of almost 2500m‘, the RAFTS model was
                     amended and revised results calculated. The results are shown in Table 7 below.

                     Table 7     Detention Basin Sizing Results — Including Unattenuated Carpark Area
                                       el         Detention       Detention       Detention       .
                                 Existing        Basin Stage    Basin Volume    Basin Outflow   Site Outtiow
                                   (m is)           (m)             (m’)            (m/s)           (m*/s)
@                   | so |         o698    | 094 |}                 1178           0.541            0.548

                     It can be seen that for each storm event, the outflows from the site as a whole (the outflow
                     refers to the site ‘end’ node and not the basin) remain less than the existing rates.
                     2.6        Outlet
                     A single 525mm pipe was adopted for the basin outlet and, as described above, set with an
                     invert level 300mm above the bottom of the basin. This outlet pipe will drain through the
                     bund, is 5 metres long and set at a grade of 0.5 per cent. The overflow spillway level was
                     set at 1.15 metres above the invert of the basin (at the downstream end) and is 5 metres
                     wide.
@                    The overflow weir would become operational only in events in excess of the 100-year
                     return period.
                     As stated, the outlet pipe has been placed with its invert set at 300mm above the ‘floor
                     level’ of the basin. This provides storage for the containment and stilling of runoff from
                     events of up to the three-month average recurrence interval. These flows will not exit from
                     the basin via the stormwater pipe, but instead through a lower and smaller pipe over a
                     longer period of time. Using this approach, the option also exists to install a sandy loam
                     bioretention filter placed in the floor of the basin to further improve the treatment train.
                     Flows from the detention basin will be released via the outlet to a vegetated swale, running
                     in a northerly direction along the western boundary of the site.  An outline sizing of this
                     swale is provided in the following section.

            Bunnings Warehouse                             Version 3                               8 February 2007
            JA3801-54\WPASW MP3,doc                  Commercial in Confidence                             Page 5

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.