SURFACE WATER MANAGEMENT PLAN C Cardno
BUNNINGS WAREHOUSE, NOOSAVILLE »
it is essential that a maintenance access point is designed for and maintained in the
bioretention basin. The size and complexity of the system will guide its design and may
involve provision of a reinforced concrete ramp/pad for truck or machinery access. Typical
maintenance of bioretention basin elements will involve:
e Routine inspection of the bioretention basin profile to identify any areas of obvious
increased sediment deposition, scouring from storm flows, rill erosion of the batters
from lateral inflows, damage to the profile from vehicles and clogging of the
bioretention basin (evident by a ‘boggy’ filter media surface).
e Routine inspection of inlet points, overflow pits and under-drains to identify and .
clean any areas of scour, litter build up and blockages.
e Removal of sediment where it is smothering the bioretention basin vegetation.
e Repairing any damage to the profile resulting from scour, rill erosion or vehicle
damage by replacement of appropriate fill (to match onsite soils) and revegetating.
®@ e Tilling of the bioretention basin surface, or removal of the surface layer, if there is
evidence of clogging.
e Regular watering/ irrigation of vegetation until plants are established and actively
growing (see Section 5.4.5).
e Removal and management of invasive weeds (herbicides should not be used).
e Removal of plants that have died and replacement with plants of equivalent size
and species as detailed in the plant schedule.
« Pruning to remove dead or diseased vegetation material and to stimulate growth.
e Vegetation pest monitoring and control.
Resetting (i.e. complete reconstruction) of the bioretention basin will be required if the
system fails to drain adequately after tilling of the surface. Maintenance should only occur
after a reasonably rain free period when the soil in the bioretention system is dry.
Inspections are also recommended following large storm events to check for scour and
@ other damage.
Given the above, a three monthly inspection frequency is proposed until the catchment has
become stabilised (i.e. buildings within the development are largely complete). After this
time, the frequency of inspections can be reduced to every six months or as determined by.
the operational performance of the devices.
Bunnings Warehouse Version 3 8 February 2007
JA3601-S41WPISWMP3.doc Commercial in Confidence Page 17See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E24E.001.pdfRelated documentPublic source context ↗
07/0256 - MCU - Bunnings Warehouse [As Published]Related documentApplication case desk ↗
About this file
- File size
- 13.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.