SURFACE WATER MANAGEMENT PLAN                                    Cc           Cardno
BUNNINGS WAREHOUSE, NOOSAVILLE                                            S

6.       MAINTENANCE REQUIREMENTS

         6.1       Construction Phase & Sediment Control
         During the construction phase, the potential exists for significant increases in the
         amount of pollutants, particularly sediment, exported from the site. During this period,
         an Erosion and Sediment Control Plan is required as part of the overall Environmental
         Management Plan prepared for the construction phase.       The erosion and sediment
         control plan for the site would be completed in accordance with Soil Erosion and
         Sediment    Control,  Engineering   Guidelines  for  Queensland    Construction   Sites
         (Institution of Engineers Australia, 1996).
         The completion of construction activities in accordance with an Erosion and Sediment
         Control Plan developed using the above guidelines will minimise the nature of any
         adverse impacts during the construction phase.    It is considered that the appropriate
         time for the preparation of the Erosion and Sediment Contro! Plan is at the Operational
         works stage.   Further, it is expected that the requirement to prepare a plan will be a
         condition of any development approval issued with respect to the site.                      @
         Performance indicators for the construction phase will be set as part of the overall EMP for
         the construction phase and in agreement with Council. Should non-compliance with the
         performance indicators occur, the following corrective actions are to be implemented:
               e   Identification of the cause of the non-compliance;
               e   Implementation of appropriate mitigation measures as determined by the
                   Contractor.in consultation with the Consultant; and
               e   Relevant validation monitoring to confirm that the nominated corrective
                   actions have been effective.
         It is envisaged that the detention basin will first be constructed as a sediment basin to treat
         runoff during the construction phase, and the same would apply to the car park landscape
         divides to a lesser extent. At the end of construction, the basin and swales would have any
         accumulated sediment removed and the vegetation installed (and the filter, in the case of
         the bio-retention devices). As there is likely to be a significant pollutant load generated as
         the Warehouse is first opened to the public, it may be necessary to replace the filter media
         at intervals until the vegetation is fully established.                                     @
         6.2       Ongoing Maintenance
         The proposed maintenance for the bio-retention systems is drawn from Brisbane City
         Council's Draft Water Sensitive Urban Design Engineering Guidelines (August 2005):
         The most intensive period of maintenance is during the plant establishment period (first two
         years) when weed removal and replanting may be required. It is also the time when large
         loads of sediments could impact on plant growth and reduce the infiltration capacity of the
         filter media. This is particularly problematic in developing catchments with an inadequate
         level of erosion and sediment control during construction phase activities.
         Inlet points and surcharge pits require careful monitoring, as these can be prone to scour
         and litter build up. Inlet pits require routine inspection to ensure structural integrity and that
         they are free of blockages.   Debris can block inlets or outlets and can be unsightly,
         particularly in high visibility areas. Inspection and removal of debris should be done
         regularly, and debris should be removed whenever it is observed on a site.

Bunnings Warehouse                            Version 3                            8 February 2007
JA3501-541WPASW MP3.doc                 Commercial in Confidence                         Page 16

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.