SURFACE WATER MANAGEMENT PLAN Cc Cardno
BUNNINGS WAREHOUSE, NOOSAVILLE S
6. MAINTENANCE REQUIREMENTS
6.1 Construction Phase & Sediment Control
During the construction phase, the potential exists for significant increases in the
amount of pollutants, particularly sediment, exported from the site. During this period,
an Erosion and Sediment Control Plan is required as part of the overall Environmental
Management Plan prepared for the construction phase. The erosion and sediment
control plan for the site would be completed in accordance with Soil Erosion and
Sediment Control, Engineering Guidelines for Queensland Construction Sites
(Institution of Engineers Australia, 1996).
The completion of construction activities in accordance with an Erosion and Sediment
Control Plan developed using the above guidelines will minimise the nature of any
adverse impacts during the construction phase. It is considered that the appropriate
time for the preparation of the Erosion and Sediment Contro! Plan is at the Operational
works stage. Further, it is expected that the requirement to prepare a plan will be a
condition of any development approval issued with respect to the site. @
Performance indicators for the construction phase will be set as part of the overall EMP for
the construction phase and in agreement with Council. Should non-compliance with the
performance indicators occur, the following corrective actions are to be implemented:
e Identification of the cause of the non-compliance;
e Implementation of appropriate mitigation measures as determined by the
Contractor.in consultation with the Consultant; and
e Relevant validation monitoring to confirm that the nominated corrective
actions have been effective.
It is envisaged that the detention basin will first be constructed as a sediment basin to treat
runoff during the construction phase, and the same would apply to the car park landscape
divides to a lesser extent. At the end of construction, the basin and swales would have any
accumulated sediment removed and the vegetation installed (and the filter, in the case of
the bio-retention devices). As there is likely to be a significant pollutant load generated as
the Warehouse is first opened to the public, it may be necessary to replace the filter media
at intervals until the vegetation is fully established. @
6.2 Ongoing Maintenance
The proposed maintenance for the bio-retention systems is drawn from Brisbane City
Council's Draft Water Sensitive Urban Design Engineering Guidelines (August 2005):
The most intensive period of maintenance is during the plant establishment period (first two
years) when weed removal and replanting may be required. It is also the time when large
loads of sediments could impact on plant growth and reduce the infiltration capacity of the
filter media. This is particularly problematic in developing catchments with an inadequate
level of erosion and sediment control during construction phase activities.
Inlet points and surcharge pits require careful monitoring, as these can be prone to scour
and litter build up. Inlet pits require routine inspection to ensure structural integrity and that
they are free of blockages. Debris can block inlets or outlets and can be unsightly,
particularly in high visibility areas. Inspection and removal of debris should be done
regularly, and debris should be removed whenever it is observed on a site.
Bunnings Warehouse Version 3 8 February 2007
JA3501-541WPASW MP3.doc Commercial in Confidence Page 16See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E24E.001.pdfRelated documentPublic source context ↗
07/0256 - MCU - Bunnings Warehouse [As Published]Related documentApplication case desk ↗
About this file
- File size
- 13.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.