INTEGRATED PLANNING ACT 1997                                                                           IDAS Assessment Checklist, Version 18.0, 10 November 2006
          Major hazard facilities or possible        6.    Does the application involve a material change of use for a major hazard facility or possible
          major hazard facilities ~                        major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
          For more information refer to Guide 17.           =
          If you answered “YES" to Q6, the application         NO
          fequwes assessment (Ges) Degariment of           (11 YES - complete Part L of Form 1
         Emerency Services      .
          If an agency other than DES is the assessment
          Manager for the application, DES is a concurrence
          agency for the application in relation to this matter.
          Water related development under the        |7.   The application involves:
          Water Act 2000                                   CC (i)   operational work, for taking or interfering with water under the Water Act 2000, that is:
          For more information about items {a} - {d}, refer to      (tick applicable box/es)
         Guide 15. For more information about item (e},                       ,                               .
          refer to Guide 14 Does my application involve             [1 (a)   ina watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
         assessment of a referable dam?                                      a pump, gravity diversion, stream re-direction, weir or dam) - complete Part Ke, Ka, Ka, Ke, or Ko of
          Uniess you answered “none of the above” to Q7, the                 Form 1 whichever is applicable;
             lication requires assessment by ihe Department                               .                      .
         of Natural Resources Mines and Water (NRMM.                [J (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
          If an agency ather than NRMW is the assessment                      Ki of Form 1;
          manager for the application, NRMW is a                                             A          .                                 7
          concurrence agency for the application in relation to     (J {c)   for a subartesian bore, in declared groundwater area’, for use for purposes other
          this matter.                                                        than stock and/or domestic use - complete Part K: of Form 1;
                                                                      J (d) for a subartesian bore, in certain declared groundwater area, for use for stock
                                                                              and/or domestic purposes - complete Part K; of Form 1;
                                                                    (J (e) for constructing a referable damé or that will increase the storage capacity of a
                                                                             referable dam by more than 10% - complete Part Ks of Form 1; of
@                                                                   [_] (f}  for taking or interfering with overland flow water - complete Parts Ks and G of Form 1
                                                           [XI (ii)  none of the above.
          Removal of quarry material froma            /8.  Does the application involve development for the removal of quarry materiat from a watercourse®
         watercourse                                   .   fequiring an allocation notice under the Water Act 2000?
          For mara information refer to Guida 16.           & NO
          If you answered "YES" to 8, the application                                ‘
          requires assessment by the Department of Natural  (_] YES - complete Parts Kz and G of Form 1
          Resources Mines and Water (NRMW).
          (€ an agency other than NRMW is the assessment
          manager for the appication, NRMWisa_
          concurrence agency for the application in relation to
          this matter.
          Note: Part G of Farm 1 is required to be completed
          as the activity of removing quarry material from a
          watercourse is also an Environmentally Relevant
          Activity (ERA).                                                                  .

          7  The declared ground water areas are listed in Guide 13 Development in a declared catchment area.
          8  Referable dam is defined under the Water Act 2000.                    .
          9  Watercourse is defined in sch 10 of the IPA.

                                                                                             Page 3

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.