INTEGRATED PLANNING ACT 1997                                                                           IDAS Assessment Checklist, Version 18.0, 10 November 2006
  Operational works in atidal areaor         |9.   The application involves operational work that is: ( tick the applicable box/es)
coastal management : ae ig ror more               C1 (i)    tidal work'° as defined under the Coastal Protection and Management Act 1995 (the
  information about prescribed tidal work in local          Coastal Act) that is not prescribed tidal work - complete Past M of Form 1; OF
  goverment tidal areas refer to   :              C1 (ii)   tidal work that is prescribed tidal work"' other than in a canal'2 -complete Part P of Form 1; OF
                           Guide 24.                   ay    gs              .         .      .                         .
  Unless you answered “none of the above” to Q9, the   .        .          a                                  oo
  application requires assessment by the            1] (iii) carried out within a coastal management district under the Coastal Act and for - complete
 Environmental Protection Agency (EPA).                     Part M of Form 1 if any box/es (a) (o (i) below are ticked.
  Trae tthe copbeaion EPA'S s conourence                    LJ (a)    constructing or installing works in a watercourse between MHWS and HAT (ie.
              ner than EPA is th                                                .       .     .           :                                                 .
  agency for the application in relation to this matter.             other than those works in tidal water} where the development has been determined not
  Local government is the assessment manager for all                  to be assessable against the Water Act 2000;
  prescribed tidal work.                                                        .               .                                .
                                                            (J (b)    constructing a canal’? intended to be connected to tidal waters:
                                                            (1 (c)    constructing an artificial waterway;
                                                            [J (d)    reclaiming land under tidal water;
                                                            [7 (e)    disposing of dredge spoil or other solid waste material in tidal water;
                                                            [-] (f} _ interfering with quarry material on State coastal land above high-water mark;
                                                            [1] (g)   draining or allowing drainage or flow of water or other matter across State
                                                                      coastal land above high-water mark;
                                                            (_] (h)   removing or interfering with coastal dunes on land, other than State coastal land,
                                                                      that is in an erosion prone area and above high-water mark;
                                                            LJ (i)    constructing a bank or bund wall to establish a ponded pasture on land, other
                                                                      than State coastal land, above high-water mark: or                                    @
                                                  [XI (iv)  none of the above.
  Operational work below high water        | 10.   The application involves operational work that is: ( tick the applicable bowes)
  mark                                                  ay   ge         13       .                                  .
  For more information reer to Guide 18, For more    J (i)  tidal work}   as defined under the Coastal Protection and Management Act 1995 (the
  information about prescribed tidal work in local          Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
  government tidal areas refer to Guide 24         C1 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF
            j         fi     ide 24.                    sey ge              ‘          .      ,
  Unless you answered “none of the above” to Q10,       ae      .         wae                                o.
 the application tragers referral to Queensland    CJ {iii) carried out within a coastal management district under the Coastal Act and for -
  Transport (QT) (Maritime Safely Qld} as a                            .     .                   .              .               cig
  concurrence agency.                                        J (a)    disposing of dredge spoil or other solid waste material in tidal water ~ complete Part
  Local goverment is the assessment manager for all                   M of Form 1,
       ibed tidal work,                                                    _                    ,
  presenned seawe                                           (JJ (b)   reclaiming land under tidal water - complete Part M of Form 1; or
                                                            [J (c)    constructing a canals, if the canal is associated with reconfiguring a lot - complete
                                                                      Part M of Form 1;
                                                       (iv)  none of the above.
  Coastal management                         11.   The application involves: (tick the applicable boxes)
 av mare information refer to ee     on            (1 (i)    a material change of use assessable under a planning scheme involving operational
     SS you answered “none of the above" to Q11,                         :                              j                              ietrintl§
  the application requires assessment by the                 work carried out completely or partly in a coastal management district
 Environmental Protection Agency (EPA).            (] (ii)   a material change of use assessable under a planning scheme involving buitding
  If an agency other than EPA is the assessment                          ;                               j                             istr        ic —
  manager forthe appication, EPA is a concurrence            work, carried out completely or partly in a coastal management district that is
  agency for the application in relation to this matter,     + the construction of a new premises with a GFA” of at least 1000m2
                                                             e the enlargement of the GFA of existing premises by more than 1000m?2
                                                   C1 (iii)  reconfiguring a lot assessable under schedule 8 of the PA where the land is situated
                                                             completely or partly in a coastal management district
                                                   (1 (iv)   reconfiguring a lof? assessable under schedule 8 of the IPA and in connection with
                                                             the construction of a canals - complete Part M of Form 1
                                                   (XI (v)   none of the above

 10 Tidal work is defined in sch 10 of the IPA,
 11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
 12 Canal means canal as defined under the Coastal Protection and Management Act 1995
 13 Tidal work is defined in sch 10 of the IPA.
 14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local goverment tidal area.
 15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
   coastal management district under section 47(2} of that Act.
 16 Canal means canal as defined under ihe Coastal Protection and Management Act 1995                                               ‘
 17 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to cacutated GFA, go to the planning scheme against which the application is being assessed,
 18 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
   accompanied by the application for the operational works to construct the artificial waterway.
                                                                                    Page 4

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.